Location: southbound between junctions J11 (Banbury) and J10 (Northampton) .
Lane Closures : The hard shoulder is closed.
Due to: Horticultural works.
Period : expect disruption until 23:59 on 6 November 2024.
Nearest town: 17.6 miles from Wimpstone.
Location: northbound between junctions J11 (Banbury) and J12 (Gaydon) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:30 on 5 November 2024 to 06:00 on 6 November 2024.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 12.7 miles from Wimpstone.
Location: southbound between junctions J12 (Gaydon) and J11 (Banbury) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 22:15 on 5 November 2024 to 06:00 on 6 November 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 11.3 miles from Wimpstone.
Location: northbound between junctions J12 (Gaydon) and J14 (Leamington) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:30 on 5 November 2024 to 06:00 on 6 November 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 9.82 miles from Wimpstone.
Location: southbound between junctions J14 (Leamington) and J12 (Gaydon) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:30 on 5 November 2024 to 06:00 on 6 November 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 9.76 miles from Wimpstone.
Location: southbound at the junction with the M40 .
Lane Closures : Lane two will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 5 November 2024 to 06:00 on 6 November 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 9.77 miles from Wimpstone.
Location: northbound entry slip at junction J5 (Solihull) .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 23:00 on 31 March 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 19.2 miles from Wimpstone.
Location: northbound between junctions J11 (Banbury) and J12 (Gaydon) .
Lane Closures : The hard shoulder is closed.
Due to: Horticultural works.
Period : expect disruption until 23:00 on 11 November 2024.
Nearest town: 13.92 miles from Wimpstone.
Location: southbound at junction J2 (Birmingham S) .
Due to: Horticultural works.
Period : expect disruption until 06:00 on 5 November 2024.
Lanes Closed : All lanes are closed.
Nearest town: 19.15 miles from Wimpstone.
Location: southbound between junctions J2 (Birmingham S) and J1 (Bromsgrove) .
Due to: Horticultural works.
Period : expect disruption until 06:00 on 5 November 2024.
Lanes Closed : All lanes are closed.
Nearest town: 19.28 miles from Wimpstone.
Location: southbound between the junctions with the A422 and the A435 Alcester.
Due to: Emergency roadworks.
Period : expect disruption until 06:00 on 31 January 2025.
Nearest town: 5.22 miles from Wimpstone.
Location: northbound between the junctions with the A435 and the A422 .
Due to: Emergency roadworks.
Period : expect disruption until 06:00 on 31 January 2025.
Nearest town: 6.44 miles from Wimpstone.
Location: southbound between the junctions with the A429 and the A4177 .
Lane Closures : Lane one is closed.
Due to: Road repairs.
Period : expect disruption until 05:00 on 5 November 2024.
Lanes Closed : There is one of two lanes closed.
Nearest town: 12.62 miles from Wimpstone.
Location: slip road to the M42 southbound .
Lane Closures : Lanes 1 and 2 are closed.
Due to: Horticultural works.
Period : expect disruption until 06:00 on 5 November 2024.
Lanes Closed : All lanes are closed.
Nearest town: 15.59 miles from Wimpstone.
Location: northbound between junction J15 (Warwick) and the M42 .
Lane Closures : Lanes 1 and 2 are closed.
Due to: Horticultural works.
Period : expect disruption until 06:00 on 5 November 2024.
Lanes Closed : There are two of three lanes closed.
Nearest town: 15.09 miles from Wimpstone.
Location: northbound between junctions J11 (Banbury) and J12 (Gaydon) .
Lane Closures : Lanes 1 and 2 are closed.
Due to: Roadside Drains Works.
Period : expect disruption until 06:00 on 5 November 2024.
Lanes Closed : There are two of three lanes closed.
Nearest town: 14.43 miles from Wimpstone.
Location: southbound between junctions J11 (Banbury) and J10 (Northampton) .
Lane Closures : Lanes 2 and 3 are closed.
Due to: Roadworks.
Period : expect disruption until 05:00 on 5 November 2024.
Lanes Closed : There are two of three lanes closed.
Nearest town: 17.46 miles from Wimpstone.
Location: northbound entry slip at junction J12 (Gaydon) .
Due to: Barrier repairs.
Period : expect disruption until 06:00 on 5 November 2024.
Lanes Closed : All lanes are closed.
Nearest town: 10.81 miles from Wimpstone.
Location: northbound between junctions J11 (Banbury) and J12 (Gaydon) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 08:00 and 17:00 from 5 November 2024 to 8 November 2024.
Nearest town: 16.08 miles from Wimpstone.
Location: northbound between junctions J12 (Gaydon) and J14 (Leamington) .
Lane Closures : The hard shoulder is closed.
Due to: Horticultural works.
Period : expect disruption until 23:59 on 5 November 2024.
Nearest town: 10.22 miles from Wimpstone.
Location: northbound between junctions J4 (Shirley) and J5 (Solihull) .
Lane Closures : Lanes 1 and 2 are closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 5 November 2024.
Lanes Closed : There are two of three lanes closed.
Nearest town: 17.63 miles from Wimpstone.
Location: southbound between the A45 Coventry West and the junction with the A452 .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 30 November 2024.
Lanes Closed : There is one of three lanes closed.
Nearest town: 18.2 miles from Wimpstone.
Location: northbound between the A452 and the junction with the A45 Coventry West.
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 30 November 2024.
Lanes Closed : There is one of three lanes closed.
Nearest town: 16.14 miles from Wimpstone.
Location: southbound between the junctions with the A422 and the A435 Alcester.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 04:00 on 18 April 2025 to 08:00 on 18 April 2025.
Nearest town: 9.04 miles from Wimpstone.
Location: northbound between junctions J10 (Northampton) and J11 (Banbury) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 11 November 2024 to 13 November 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 19.87 miles from Wimpstone.
Location: northbound exit slip at junction J2 (Birmingham S) .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 11 November 2024 to 06:00 on 12 November 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 19.42 miles from Wimpstone.
Location: southbound exit slip at junction J11 (Banbury) .
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 11 November 2024 to 14 November 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 16.47 miles from Wimpstone.
Location: southbound between junctions J12 (Gaydon) and J11 (Banbury) .
Lane Closures : Lane one will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 11 November 2024 to 14 November 2024.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 16.17 miles from Wimpstone.
Location: northbound between junctions J11 (Banbury) and J12 (Gaydon) .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 19:00 on 11 November 2024 to 23:59 on 13 November 2024.
Nearest town: 13.5 miles from Wimpstone.
Location: northbound between junctions J15 (Warwick) and J16 (Henley) .
Due to: Litter clearance is planned.
Status : Pending.
Schedule : Expect disruption everyday between 09:00 and 18:00 from 11 November 2024 to 15 November 2024.
Schedule : Expect disruption everyday between 09:00 and 18:00 from 18 November 2024 to 21 November 2024.
Nearest town: 10.5 miles from Wimpstone.
Location: southbound between junctions J8 (Ross on Wye) and J9 (Tewkesbury) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 09:00 and 16:00 from 11 November 2024 to 13 November 2024.
Nearest town: 19.54 miles from Wimpstone.
Location: northbound between junctions J13 (Leamington) and J15 (Warwick) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 08:00 and 17:00 from 11 November 2024 to 15 November 2024.
Nearest town: 9.86 miles from Wimpstone.
Location: southbound between junctions J15 (Warwick) and J13 (Leamington) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 08:00 and 17:00 from 11 November 2024 to 15 November 2024.
Nearest town: 9.68 miles from Wimpstone.
Location: southbound between junctions J14 (Leamington) and J11 (Banbury) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 21:30 on 8 November 2024 to 06:00 on 9 November 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 10.65 miles from Wimpstone.
Location: northbound between junctions J11 (Banbury) and J14 (Leamington) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 21:30 on 8 November 2024 to 06:00 on 9 November 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 11.29 miles from Wimpstone.
Location: southbound between junctions J11 (Banbury) and J10 (Northampton) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 8 November 2024 to 05:00 on 9 November 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 17.46 miles from Wimpstone.
Location: northbound between junctions J10 (Northampton) and J11 (Banbury) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 8 November 2024 to 05:00 on 9 November 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 17.79 miles from Wimpstone.
Location: southbound between junctions J12 (Gaydon) and J11 (Banbury) .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 19:00 on 8 November 2024 to 23:59 on 15 November 2024.
Nearest town: 14.77 miles from Wimpstone.
Location: southbound between junctions J14 (Leamington) and J12 (Gaydon) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 22:15 on 7 November 2024 to 06:00 on 8 November 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 9.86 miles from Wimpstone.
Location: northbound between junctions J11 (Banbury) and J14 (Leamington) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 22:15 on 7 November 2024 to 06:00 on 8 November 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 11.06 miles from Wimpstone.
Location: northbound between junctions J10 (Northampton) and J11 (Banbury) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 7 November 2024 to 05:00 on 8 November 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 17.79 miles from Wimpstone.
Location: southbound between junctions J11 (Banbury) and J10 (Northampton) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 7 November 2024 to 05:00 on 8 November 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 17.45 miles from Wimpstone.
Location: northbound between junctions J11 (Banbury) and J12 (Gaydon) .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 19:00 on 7 November 2024 to 23:59 on 8 November 2024.
Nearest town: 14.4 miles from Wimpstone.
Location: northbound between junctions J12 (Gaydon) and J14 (Leamington) .
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 06:00 on 7 November 2024 to 06:00 on 9 November 2024.
Nearest town: 9.76 miles from Wimpstone.
Location: northbound between junctions J12 (Gaydon) and J14 (Leamington) .
Lane Closures : Lane one will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 22:00 on 6 November 2024 to 06:00 on 7 November 2024.
Schedule : From 23:00 on 7 November 2024 to 06:00 on 8 November 2024.
Schedule : From 21:00 on 8 November 2024 to 06:00 on 9 November 2024.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 9.85 miles from Wimpstone.
Location: southbound between junctions J11 (Banbury) and J10 (Northampton) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 6 November 2024 to 05:00 on 7 November 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 18.89 miles from Wimpstone.
Location: southbound between junctions J11 (Banbury) and J10 (Northampton) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 6 November 2024 to 05:00 on 7 November 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 17.46 miles from Wimpstone.
Location: northbound between junctions J10 (Northampton) and J11 (Banbury) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 6 November 2024 to 05:00 on 7 November 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 19.87 miles from Wimpstone.
Location: northbound between junctions J10 (Northampton) and J11 (Banbury) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 6 November 2024 to 05:00 on 7 November 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 17.79 miles from Wimpstone.
Location: southbound between the junctions with the A44 Evesham north and the A44 Evesham East.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 09:00 and 18:00 from 5 November 2024 to 8 November 2024.
Schedule : Expect disruption everyday between 09:00 and 18:00 from 11 November 2024 to 15 November 2024.
Nearest town: 9.95 miles from Wimpstone.
Location: northbound between the junctions with the A44 Evesham East and the A44 Evesham north.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 09:00 and 18:00 from 5 November 2024 to 8 November 2024.
Schedule : Expect disruption everyday between 09:00 and 18:00 from 11 November 2024 to 15 November 2024.
Nearest town: 9.9 miles from Wimpstone.
Location: southbound exit slip at junction J3 (Birmingham S) To A435 south.
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 21:00 on 14 November 2024 to 06:00 on 22 November 2024.
Nearest town: 17.41 miles from Wimpstone.
Location: southbound exit slip at junction J3 (Birmingham S) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 14 November 2024 to 16 November 2024.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 20 November 2024 to 22 November 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 17.46 miles from Wimpstone.
Location: southbound exit slip at junction J3 (Birmingham S) To A435 south.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 14 November 2024 to 16 November 2024.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 20 November 2024 to 22 November 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 17.41 miles from Wimpstone.
Location: northbound between junctions J5 (Solihull) and J6 (Birmingham E) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 18:00 on 24 November 2024 to 23:00 on 31 March 2025.
Nearest town: 19.75 miles from Wimpstone.
Location: southbound between junctions J3 (Birmingham S) and J2 (Birmingham S) .
Lane Closures : Lanes 2 and 3 are closed.
Due to: Horticultural works.
Period : expect disruption until 06:00 on 5 November 2024.
Lanes Closed : There are two of three lanes closed.
Nearest town: 18 miles from Wimpstone.
Location: northbound between junctions J5 (Solihull) and J6 (Birmingham E) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 21:00 on 6 November 2024 to 05:00 on 14 November 2024.
Nearest town: 19.09 miles from Wimpstone.
Location: northbound between junctions J5 (Solihull) and J6 (Birmingham E) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 6 November 2024 to 9 November 2024.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 12 November 2024 to 14 November 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 19.09 miles from Wimpstone.
Location: northbound entry slip at junction J5 (Solihull) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 6 November 2024 to 9 November 2024.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 11 November 2024 to 14 November 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 19.2 miles from Wimpstone.
Location: southbound between junctions J12 (Gaydon) and J11 (Banbury) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 08:00 and 17:00 from 5 November 2024 to 8 November 2024.
Nearest town: 15.63 miles from Wimpstone.
Location: northbound between the A429 and the junction with the A452 .
Due to: Bridge repairs are planned.
Status : Pending.
Schedule : From 20:00 on 7 February 2025 to 06:00 on 10 February 2025.
Schedule : From 20:00 on 14 February 2025 to 06:00 on 17 February 2025.
Schedule : From 20:00 on 21 February 2025 to 06:00 on 24 February 2025.
Schedule : From 20:00 on 11 April 2025 to 06:00 on 30 April 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 14.68 miles from Wimpstone.
Location: southbound at the junction with the A45 Coventry West.
Due to: Bridge repairs are planned.
Status : Pending.
Schedule : From 20:00 on 11 April 2025 to 06:00 on 30 April 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.27 miles from Wimpstone.
Location: southbound exit slip to the A452 .
Due to: Bridge repairs are planned.
Status : Pending.
Schedule : From 20:00 on 7 February 2025 to 06:00 on 10 February 2025.
Schedule : From 20:00 on 14 February 2025 to 06:00 on 17 February 2025.
Schedule : From 20:00 on 21 February 2025 to 06:00 on 24 February 2025.
Schedule : From 20:00 on 11 April 2025 to 06:00 on 30 April 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 15.24 miles from Wimpstone.
Location: southbound.
Due to: Bridge repairs are planned.
Status : Pending.
Schedule : From 20:00 on 7 February 2025 to 06:00 on 10 February 2025.
Schedule : From 20:00 on 14 February 2025 to 06:00 on 17 February 2025.
Schedule : From 20:00 on 21 February 2025 to 06:00 on 24 February 2025.
Schedule : From 20:00 on 11 April 2025 to 06:00 on 30 April 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 17.21 miles from Wimpstone.
Location: northbound between the junctions with the A429 and the A452 .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Bridge repairs are planned.
Status : Pending.
Schedule : From 20:00 on 7 February 2025 to 06:00 on 10 February 2025.
Schedule : From 20:00 on 14 February 2025 to 06:00 on 17 February 2025.
Schedule : From 20:00 on 21 February 2025 to 06:00 on 24 February 2025.
Schedule : From 20:00 on 11 April 2025 to 06:00 on 30 April 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 14.34 miles from Wimpstone.
Location: northbound.
Due to: Bridge repairs are planned.
Status : Pending.
Schedule : From 20:00 on 7 February 2025 to 06:00 on 10 February 2025.
Schedule : From 20:00 on 14 February 2025 to 06:00 on 17 February 2025.
Schedule : From 20:00 on 21 February 2025 to 06:00 on 24 February 2025.
Schedule : From 20:00 on 11 April 2025 to 06:00 on 30 April 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 17.02 miles from Wimpstone.
Location: northbound between the A452 and the junction with the A45 Coventry West.
Due to: Bridge repairs are planned.
Status : Pending.
Schedule : From 20:00 on 7 February 2025 to 06:00 on 10 February 2025.
Schedule : From 20:00 on 14 February 2025 to 06:00 on 17 February 2025.
Schedule : From 20:00 on 21 February 2025 to 06:00 on 24 February 2025.
Schedule : From 20:00 on 11 April 2025 to 06:00 on 30 April 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 15.03 miles from Wimpstone.
Location: southbound between the junctions with the A45 Coventry West and the A452 .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Bridge repairs are planned.
Status : Pending.
Schedule : From 20:00 on 7 February 2025 to 06:00 on 10 February 2025.
Schedule : From 20:00 on 14 February 2025 to 06:00 on 17 February 2025.
Schedule : From 20:00 on 21 February 2025 to 06:00 on 24 February 2025.
Schedule : From 20:00 on 11 April 2025 to 06:00 on 30 April 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 18.24 miles from Wimpstone.
Location: southbound between the junctions with the A45 Coventry West and the A452 .
Due to: Bridge repairs are planned.
Status : Pending.
Schedule : From 20:00 on 7 February 2025 to 06:00 on 10 February 2025.
Schedule : From 20:00 on 14 February 2025 to 06:00 on 17 February 2025.
Schedule : From 20:00 on 21 February 2025 to 06:00 on 24 February 2025.
Schedule : From 20:00 on 11 April 2025 to 06:00 on 30 April 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 17.51 miles from Wimpstone.
Location: northbound between junctions J8 (Ross on Wye) and J7 (Worcester) .
Lane Closures : Lane three is closed.
Due to: Barrier repairs.
Period : expect disruption until 06:00 on 5 November 2024.
Lanes Closed : There is one of four lanes closed.
Nearest town: 19.64 miles from Wimpstone.
Location: northbound at junction J8 (Ross on Wye) .
Lane Closures : Lane three is closed.
Due to: Barrier repairs.
Period : expect disruption until 06:00 on 5 November 2024.
Lanes Closed : There is one of three lanes closed.
Nearest town: 19.56 miles from Wimpstone.
Location: northbound between junctions J8 (Ross on Wye) and J7 (Worcester) .
Lane Closures : Lane three is closed.
Due to: Barrier repairs.
Period : expect disruption until 06:00 on 5 November 2024.
Lanes Closed : There is one of three lanes closed.
Nearest town: 20 miles from Wimpstone.
Location: northbound between the junctions with the A435 Alcester and the A422 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 04:00 on 18 April 2025 to 08:00 on 18 April 2025.
Nearest town: 9.11 miles from Wimpstone.