Location: clockwise between junctions J27 (Stansted) and J28 (Chelmsford) .
Lane Closures : The hard shoulder and lane 1 are closed.
Due to: Road traffic collision.
Time To Clear : The event is expected to clear between 19:45 and 20:00 on 27 March 2025.
Normal traffic conditions are expected between 19:45 and 20:00 on 27 March 2025.
Lanes Closed : There is one of four lanes closed.
Nearest town: 16.13 miles from Runsell Green.

Location: clockwise between junctions J27 (Stansted) and J28 (Chelmsford) .
Due to: Road traffic collision.
Status : Cleared.
Nearest town: 17.44 miles from Runsell Green.

Location: southbound entry slip at junction J8 (Bishops Stortford) .
Due to: Congestion.
Normal traffic conditions are expected between 20:45 and 21:00 on 27 March 2025.
Nearest town: 19.81 miles from Runsell Green.

Location: northbound exit slip at junction J7 (Chelmsford) .
Due to: Congestion.
Normal traffic conditions are expected between 18:15 and 18:30 on 27 March 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 19.48 miles from Runsell Green.

Location: eastbound between the A131 North and the junction with the A12 Colchester West.
Due to: Congestion.
Normal traffic conditions are expected between 18:15 and 18:30 on 27 March 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 13.52 miles from Runsell Green.

Location: southbound exit slip at junction J7 (Chelmsford) .
Due to: Congestion.
Normal traffic conditions are expected between 17:45 and 18:00 on 27 March 2025.
Nearest town: 19.38 miles from Runsell Green.

Location: eastbound between the junctions with the A131 South and the A131 North.
Due to: Congestion.
Normal traffic conditions are expected between 19:00 and 19:15 on 27 March 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 10.38 miles from Runsell Green.

Location: southbound between junctions J19 and J18 .
Due to: Congestion.
Normal traffic conditions are expected between 19:45 and 20:00 on 27 March 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 3.99 miles from Runsell Green.

Location: northbound exit slip at junction J7 (Chelmsford) .
Due to: Congestion.
Normal traffic conditions are expected between 17:15 and 17:30 on 27 March 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 19.48 miles from Runsell Green.

Location: eastbound between the junctions with the A131 South and the A131 North.
Due to: Congestion.
Normal traffic conditions are expected between 17:15 and 17:30 on 27 March 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 10.38 miles from Runsell Green.

Location: eastbound between the junctions with the A131 North and the A12 Colchester West.
Due to: Congestion.
Normal traffic conditions are expected between 16:45 and 17:00 on 27 March 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 13.52 miles from Runsell Green.

Location: eastbound between the junctions with the A131 North and the A12 Colchester West.
Due to: Congestion.
Normal traffic conditions are expected between 16:30 and 16:45 on 27 March 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 13.26 miles from Runsell Green.

Location: clockwise at junction J27 (Stansted) .
Due to: Congestion.
Normal traffic conditions are expected between 18:15 and 18:30 on 27 March 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Earlier
Due to: Caused by an earlier accident.
Nearest town: 17.01 miles from Runsell Green.

Location: northbound between junctions J26 and J28 .
Due to: Roadworks.
Period : from 21:19 on 27 March 2025 to 05:00 on 28 March 2025.
Lanes Closed : All lanes are closed.
Nearest town: 15.97 miles from Runsell Green.

Location: northbound between junctions J11 and J12 .
Due to: Roadworks.
Period : from 20:59 on 27 March 2025 to 05:00 on 28 March 2025.
Lanes Closed : All lanes are closed.
Nearest town: 15.62 miles from Runsell Green.

Location: southbound exit slip at junction J18 .
Due to: Roadworks scheme.
Period : from 21:01 on 27 March 2025 to 05:00 on 29 March 2025.
Nearest town: 2.72 miles from Runsell Green.

Location: westbound exit slip to the A1089 .
Due to: Roadworks.
Period : from 20:42 on 27 March 2025 to 05:00 on 28 March 2025.
Lanes Closed : All lanes are closed.
Nearest town: 17.84 miles from Runsell Green.

Location: southbound exit slip at junction J18 .
Due to: Roadworks.
Period : from 20:32 on 27 March 2025 to 05:00 on 28 March 2025.
Lanes Closed : All lanes are closed.
Nearest town: 2.66 miles from Runsell Green.

Location: eastbound between the junctions with the A131 North and the A12 Colchester West.
Due to: Emergency roadworks.
Period : expect disruption until 17:00 on 2 April 2025.
Nearest town: 11.23 miles from Runsell Green.

Location: westbound between the junctions with the A12 Colchester West and the A131 North.
Due to: Emergency roadworks.
Period : expect disruption until 17:00 on 2 April 2025.
Nearest town: 11.19 miles from Runsell Green.

Location: westbound at the junction with the A1012 .
Lane Closures : Lane one is closed.
Due to: Emergency Roadside Drains works.
Period : expect disruption until 05:00 on 28 March 2025.
Lanes Closed : There is one of three lanes closed.
Nearest town: 18.71 miles from Runsell Green.

Location: southbound exit slip at junction J6 (Hatfield) .
Lane Closures : Lane two is closed.
Due to: Roadworks.
Period : expect disruption until 05:30 on 28 March 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 19.78 miles from Runsell Green.

Location: anticlockwise between junctions J27 (Stansted) From M11 South and J27 (Stansted) .
Due to: Roadworks scheme.
Period : from 22:01 on 25 March 2025 to 05:30 on 28 March 2025.
Nearest town: 19.91 miles from Runsell Green.

Location: anticlockwise at junction J27 (Stansted) .
Due to: Roadworks.
Period : expect disruption until 05:30 on 28 March 2025.
Lanes Closed : All lanes are closed.
Nearest town: 19.67 miles from Runsell Green.

Location: anticlockwise between junctions J28 (Chelmsford) and J27 (Stansted) .
Lane Closures : Lanes 2, 3 and 4 are closed.
Due to: Roadworks.
Period : expect disruption until 05:30 on 28 March 2025.
Lanes Closed : There are three of four lanes closed.
Nearest town: 19.21 miles from Runsell Green.

Location: anticlockwise between junctions J27 (Stansted) From M11 South and J25 (Enfield) .
Due to: Roadworks.
Period : expect disruption until 05:30 on 28 March 2025.
Lanes Closed : All lanes are closed.
Nearest town: 19.91 miles from Runsell Green.

Location: northbound between junctions J12 and J13 .
Lane Closures : Lane two is closed.
Due to: Roadworks.
Period : expect disruption until 05:00 on 28 March 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 11.2 miles from Runsell Green.

Location: southbound.
Due to: Planned Roadworks.
Period : expect disruption until 05:00 on 28 March 2025.
Lanes Closed : All lanes are closed.
Nearest town: 15.77 miles from Runsell Green.

Location: clockwise between junctions J27 (Stansted) and J28 (Chelmsford) .
Lane Closures : Lanes 2, 3 and 4 are closed.
Due to: Roadworks.
Period : expect disruption until 05:00 on 28 March 2025.
Lanes Closed : There are three of four lanes closed.
Nearest town: 17.99 miles from Runsell Green.

Location: eastbound.
Due to: Roadworks scheme.
Period : from 21:00 on 7 March 2025 to 05:00 on 9 April 2025.
Nearest town: 16.31 miles from Runsell Green.

Location: northbound between junctions J26 and J28 .
Due to: Roadworks scheme.
Period : from 21:00 on 25 March 2025 to 05:00 on 31 March 2025.
Nearest town: 18.94 miles from Runsell Green.

Location: southbound exit slip at junction J11 .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 05:00 on 17 May 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 15.62 miles from Runsell Green.

Location: anticlockwise between junctions J28 (Chelmsford) and J27 (Stansted) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 05:00 on 2 August 2025.
Nearest town: 15.92 miles from Runsell Green.

Location: anticlockwise between junctions J28 (Chelmsford) and J28 (Chelmsford) .
Due to: Roadworks scheme.
Period : from 05:03 on 18 January 2025 to 05:00 on 2 August 2025.
Nearest town: 15.88 miles from Runsell Green.

Location: anticlockwise at junction J28 (Chelmsford) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 05:00 on 2 August 2025.
Nearest town: 15.85 miles from Runsell Green.

Location: anticlockwise entry slip at junction J28 (Chelmsford) .
Lane Closures : Lane two is closed.
Due to: Roadworks.
Period : expect disruption until 05:00 on 2 August 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 15.88 miles from Runsell Green.

Location: northbound between junctions J7 (Chelmsford) and J11 (Royston) .
Due to: Roadworks scheme.
Period : from 21:00 on 26 February 2025 to 05:00 on 5 April 2025.
Nearest town: 19.47 miles from Runsell Green.

Location: southbound exit slip at junction J18 .
Due to: Roadworks.
Period : expect disruption until 05:00 on 28 March 2025.
Lanes Closed : All lanes are closed.
Nearest town: 2.72 miles from Runsell Green.

Location: southbound between junctions J19 and J17 .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 05:00 on 28 March 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 2.96 miles from Runsell Green.

Location: westbound between the junctions with the A1012 and the A126 .
Lane Closures : Lane three will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 22:00 on 2 April 2025 to 05:00 on 3 April 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 19.88 miles from Runsell Green.

Location: anticlockwise between junctions J30 (Dagenham) and J29 (Romford) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 2 April 2025 to 05:00 on 3 April 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 18.03 miles from Runsell Green.

Location: northbound between junctions J19 and J20B .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 2 April 2025 to 05:00 on 3 April 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 4.02 miles from Runsell Green.

Location: clockwise between junctions J28 (Chelmsford) and J29 (Romford) .
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 09:30 and 16:00 from 31 March 2025 to 4 April 2025.
Nearest town: 16.19 miles from Runsell Green.

Location: southbound between junctions J24 and J21 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 31 March 2025 to 4 April 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 8.2 miles from Runsell Green.

Location: northbound between junctions J21 and J24 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 31 March 2025 to 4 April 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 5.04 miles from Runsell Green.

Location: eastbound between the A126 and the junction with the A1012 .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 22:00 on 31 March 2025 to 05:00 on 1 April 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 19.61 miles from Runsell Green.

Location: anticlockwise at junction J28 (Chelmsford) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 31 March 2025 to 4 April 2025.
Schedule : From 23:00 on 4 April 2025 to 05:30 on 5 April 2025.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 7 April 2025 to 11 April 2025.
Schedule : From 23:00 on 11 April 2025 to 05:30 on 12 April 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 15.82 miles from Runsell Green.

Location: anticlockwise between junctions J29 (Romford) and J28 (Chelmsford) .
Lane Closures : Lanes 2, 3 and 4 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 31 March 2025 to 4 April 2025.
Schedule : From 23:00 on 4 April 2025 to 05:30 on 5 April 2025.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 7 April 2025 to 11 April 2025.
Schedule : From 23:00 on 11 April 2025 to 05:30 on 12 April 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 16.19 miles from Runsell Green.

Location: eastbound between the A131 South and the junction with the A131 North.
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 31 March 2025 to 5 April 2025.
Schedule : From 20:00 on 7 April 2025 to 06:00 on 8 April 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 9 April 2025 to 12 April 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 14 April 2025 to 17 April 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 11.34 miles from Runsell Green.

Location: westbound between the junctions with the A12 Colchester West and the A131 North.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:30 on 28 March 2025 to 05:00 on 29 March 2025.
Nearest town: 11.36 miles from Runsell Green.

Location: eastbound between the A131 North and the junction with the A12 Colchester West.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:30 on 28 March 2025 to 05:00 on 29 March 2025.
Nearest town: 11.37 miles from Runsell Green.

Location: westbound between the junctions with the A12 Colchester West and the A131 North.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:30 on 28 March 2025 to 05:00 on 29 March 2025.
Nearest town: 11.35 miles from Runsell Green.

Location: eastbound between the junctions with the A131 North and the A12 Colchester West.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:30 on 28 March 2025 to 05:00 on 29 March 2025.
Nearest town: 11.36 miles from Runsell Green.

Location: southbound exit slip at junction J6 (Hatfield) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 29 March 2025 to 05:00 on 30 March 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.78 miles from Runsell Green.

Location: clockwise entry slip at junction J27 (Stansted) From M11 South.
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 29 March 2025 to 05:00 on 30 March 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.9 miles from Runsell Green.

Location: northbound between junctions J27 and J29 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 30 March 2025 to 05:00 on 31 March 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 17.97 miles from Runsell Green.

Location: northbound between junctions J27 and J28 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 29 March 2025 to 05:00 on 30 March 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 16.45 miles from Runsell Green.

Location: northbound between junctions J26 and J28 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 29 March 2025 to 05:00 on 30 March 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 15.75 miles from Runsell Green.

Location: eastbound between the junctions with the M11 and the A131 South.
Lane Closures : Lane two will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 20:00 on 30 March 2025 to 06:00 on 31 March 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 14 miles from Runsell Green.

Location: westbound between the junctions with the A1089 and the A1012 .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 22:00 on 29 March 2025 to 06:00 on 30 March 2025.
Schedule : From 22:30 on 30 March 2025 to 05:30 on 31 March 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 18.14 miles from Runsell Green.

Location: westbound between the A1089 and the junction with the A126 .
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 22:00 on 29 March 2025 to 06:00 on 30 March 2025.
Schedule : From 22:30 on 30 March 2025 to 05:30 on 31 March 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.66 miles from Runsell Green.

Location: westbound entry slip from the A1012 .
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 22:00 on 29 March 2025 to 06:00 on 30 March 2025.
Schedule : From 22:30 on 30 March 2025 to 05:30 on 31 March 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.09 miles from Runsell Green.

Location: clockwise exit slip at junction J28 (Chelmsford) .
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 23:00 on 28 March 2025 to 05:00 on 31 March 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 15.88 miles from Runsell Green.

Location: anticlockwise exit slip at junction J28 (Chelmsford) .
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 23:00 on 28 March 2025 to 05:00 on 31 March 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 15.82 miles from Runsell Green.

Location: anticlockwise at junction J28 (Chelmsford) .
Lane Closures : Lane one will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 23:00 on 28 March 2025 to 05:00 on 31 March 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 15.82 miles from Runsell Green.

Location: clockwise between junctions J27 (Stansted) and J28 (Chelmsford) .
Lane Closures : Lane one will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 23:00 on 28 March 2025 to 05:00 on 31 March 2025.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 16.18 miles from Runsell Green.

Location: northbound.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 23:00 on 28 March 2025 to 05:00 on 31 March 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 15.78 miles from Runsell Green.

Location: southbound.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 23:00 on 28 March 2025 to 05:00 on 31 March 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 15.72 miles from Runsell Green.

Location: anticlockwise between junctions J29 (Romford) and J28 (Chelmsford) .
Lane Closures : Lane one will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 23:00 on 28 March 2025 to 05:00 on 31 March 2025.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 16.01 miles from Runsell Green.

Location: clockwise between junctions J28 (Chelmsford) and J29 (Romford) .
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 09:30 on 28 March 2025 to 16:00 on 28 March 2025.
Nearest town: 16.19 miles from Runsell Green.

Location: northbound exit slip at junction J28 .
Due to: Roadworks.
Period : expect disruption until 05:00 on 28 March 2025.
Lanes Closed : All lanes are closed.
Nearest town: 19.5 miles from Runsell Green.

Location: northbound between junctions J26 and J28 .
Due to: Roadworks.
Period : expect disruption until 05:00 on 28 March 2025.
Lanes Closed : All lanes are closed.
Nearest town: 15.65 miles from Runsell Green.

Location: northbound exit slip at junction J27 .
Due to: Roadworks.
Period : expect disruption until 05:00 on 28 March 2025.
Lanes Closed : All lanes are closed.
Nearest town: 16.45 miles from Runsell Green.

Location: northbound entry slip at junction J26 .
Due to: Roadworks.
Period : expect disruption until 05:00 on 28 March 2025.
Lanes Closed : All lanes are closed.
Nearest town: 15.86 miles from Runsell Green.

Location: clockwise between junctions J28 (Chelmsford) and J29 (Romford) .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 09:30 on 28 March 2025 to 16:00 on 28 March 2025.
Schedule : From 09:30 on 31 March 2025 to 16:00 on 31 March 2025.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 15.85 miles from Runsell Green.

Location: clockwise entry slip at junction J28 (Chelmsford) .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 09:30 on 28 March 2025 to 16:00 on 28 March 2025.
Schedule : From 09:30 on 31 March 2025 to 16:00 on 31 March 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 15.8 miles from Runsell Green.

Location: clockwise at junction J28 (Chelmsford) .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 09:30 on 28 March 2025 to 16:00 on 28 March 2025.
Schedule : From 09:30 on 31 March 2025 to 16:00 on 31 March 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 15.81 miles from Runsell Green.

Location: eastbound between the M11 and the junction with the A131 South.
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 7 April 2025 to 05:00 on 8 April 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 18.67 miles from Runsell Green.

Location: westbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 8 April 2025 to 05:00 on 9 April 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 15.42 miles from Runsell Green.

Location: eastbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 8 April 2025 to 05:00 on 9 April 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 15.34 miles from Runsell Green.

Location: eastbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 7 April 2025 to 05:00 on 8 April 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.25 miles from Runsell Green.

Location: eastbound.
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 7 April 2025 to 05:00 on 8 April 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 18.67 miles from Runsell Green.

Location: westbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 7 April 2025 to 07:00 on 8 April 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 17.94 miles from Runsell Green.

Location: westbound.
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 21:00 on 7 April 2025 to 05:00 on 9 April 2025.
Nearest town: 15.64 miles from Runsell Green.

Location: clockwise exit slip at junction J28 (Chelmsford) southbound.
Lane Closures : Lane one will be closed.
Due to: Litter clearance is planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 13 August 2025 to 15 August 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 15.85 miles from Runsell Green.