Location: clockwise exit slip at junction J28 (Chelmsford) .
Due to: Congestion.
Normal traffic conditions are expected between 23:00 and 23:15 on 21 November 2024.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 17.58 miles from Rudley Green.
Location: anticlockwise exit slip at junction J29 (Romford) .
Due to: Roadworks.
Period : from 22:03 on 21 November 2024 to 05:30 on 22 November 2024.
Lanes Closed : All lanes are closed.
Nearest town: 17.72 miles from Rudley Green.
Location: anticlockwise entry slip at junction J29 (Romford) .
Due to: Roadworks.
Period : from 22:08 on 21 November 2024 to 05:30 on 22 November 2024.
Lanes Closed : All lanes are closed.
Nearest town: 17.69 miles from Rudley Green.
Location: clockwise entry slip at junction J29 (Romford) .
Due to: Roadworks.
Period : from 22:01 on 21 November 2024 to 05:30 on 22 November 2024.
Lanes Closed : All lanes are closed.
Nearest town: 17.68 miles from Rudley Green.
Location: westbound entry slip from the A1089 .
Due to: Roadworks.
Period : from 21:36 on 21 November 2024 to 05:00 on 22 November 2024.
Lanes Closed : All lanes are closed.
Nearest town: 18.4 miles from Rudley Green.
Location: southbound exit slip at junction J20B .
Due to: Roadworks.
Period : from 20:44 on 21 November 2024 to 05:00 on 22 November 2024.
Lanes Closed : All lanes are closed.
Nearest town: 6 miles from Rudley Green.
Location: westbound between the junctions with the A1089 and the A1012 .
Lane Closures : Lane three will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 23:00 on 22 November 2024 to 05:00 on 23 November 2024.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 18.6 miles from Rudley Green.
Location: westbound between the A1089 and the junction with the A1012 .
Lane Closures : Lane three will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 23:00 on 22 November 2024 to 05:00 on 23 November 2024.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 18.16 miles from Rudley Green.
Location: clockwise at junction J28 (Chelmsford) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 05:00 on 21 December 2024.
Nearest town: 17.61 miles from Rudley Green.
Location: anticlockwise between junctions J28 (Chelmsford) and J27 (Stansted) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 23:00 on 22 November 2024 to 05:00 on 23 November 2024.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 17.68 miles from Rudley Green.
Location: eastbound between the junctions with the A1012 and the A1089 .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 23:00 on 22 November 2024 to 05:00 on 23 November 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 19.11 miles from Rudley Green.
Location: anticlockwise at junction J28 (Chelmsford) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 23:00 on 22 November 2024 to 05:00 on 23 November 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 17.48 miles from Rudley Green.
Location: anticlockwise between junctions J29 (Romford) and J28 (Chelmsford) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 23:00 on 22 November 2024 to 05:00 on 23 November 2024.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 17.59 miles from Rudley Green.
Location: northbound exit slip at junction J26 .
Lane Closures : Lane two is closed.
Due to: Roadside Equipment Maintenance.
Period : expect disruption until 05:00 on 22 November 2024.
Lanes Closed : There is one of two lanes closed.
Nearest town: 15.38 miles from Rudley Green.
Location: northbound between junctions J21 and J24 .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 05:00 on 22 November 2024.
Lanes Closed : There is one of two lanes closed.
Nearest town: 7.44 miles from Rudley Green.
Location: southbound between junctions J24 and J21 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 22 November 2024 to 05:00 on 23 November 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 8.9 miles from Rudley Green.
Location: northbound between junctions J22 and J24 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 22 November 2024 to 05:00 on 23 November 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 7.77 miles from Rudley Green.
Location: northbound entry slip at junction J22 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 22 November 2024 to 05:00 on 23 November 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 7.79 miles from Rudley Green.
Location: southbound entry slip at junction J23 .
Due to: Roadworks.
Period : expect disruption until 05:00 on 22 November 2024.
Lanes Closed : All lanes are closed.
Nearest town: 9.25 miles from Rudley Green.
Location: northbound exit slip at junction J23 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 22 November 2024 to 05:00 on 23 November 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 9.06 miles from Rudley Green.
Location: southbound between junctions J20B and J20A .
Lane Closures : Lane one is closed.
Due to: Horticultural works.
Period : expect disruption until 05:00 on 22 November 2024.
Lanes Closed : There is one of two lanes closed.
Nearest town: 6.01 miles from Rudley Green.
Location: southbound entry slip at junction J20A .
Due to: Horticultural works.
Period : expect disruption until 05:00 on 22 November 2024.
Lanes Closed : All lanes are closed.
Nearest town: 6.04 miles from Rudley Green.
Location: southbound between junctions J20B and J19 .
Lane Closures : Lane one is closed.
Due to: Horticultural works.
Period : expect disruption until 05:00 on 22 November 2024.
Lanes Closed : There is one of three lanes closed.
Nearest town: 6.11 miles from Rudley Green.
Location: northbound between the junctions with the A126 Grays and the A13 .
Lane Closures : Lane two is closed.
Due to: Horticultural works.
Period : expect disruption until 05:30 on 22 November 2024.
Lanes Closed : There is one of two lanes closed.
Nearest town: 18.76 miles from Rudley Green.
Location: northbound between the junctions with the A126 Grays and the A13 .
Due to: Horticultural works.
Period : expect disruption until 05:30 on 22 November 2024.
Lanes Closed : All lanes are closed.
Nearest town: 18.45 miles from Rudley Green.
Location: eastbound entry slip from the A1089 .
Due to: Horticultural works.
Period : expect disruption until 05:30 on 22 November 2024.
Lanes Closed : All lanes are closed.
Nearest town: 18.42 miles from Rudley Green.
Location: eastbound between the A1012 and the junction with the A1089 .
Lane Closures : Lane one is closed.
Due to: Horticultural works.
Period : expect disruption until 05:30 on 22 November 2024.
Lanes Closed : There is one of three lanes closed.
Nearest town: 19 miles from Rudley Green.
Location: anticlockwise at junction J29 (Romford) .
Lane Closures : The hard shoulder, lanes 1 and 2 are closed.
Due to: Road repairs.
Period : expect disruption until 05:30 on 22 November 2024.
Lanes Closed : There are two of three lanes closed.
Nearest town: 17.73 miles from Rudley Green.
Location: anticlockwise between junctions J30 (Dagenham) and J29 (Romford) .
Lane Closures : The hard shoulder, lanes 1 and 2 are closed.
Due to: Road repairs.
Period : expect disruption until 05:30 on 22 November 2024.
Lanes Closed : There are two of four lanes closed.
Nearest town: 18.08 miles from Rudley Green.
Location: clockwise at junction J29 (Romford) .
Lane Closures : The hard shoulder, lanes 1 and 2 are closed.
Due to: Road repairs.
Period : expect disruption until 05:30 on 22 November 2024.
Lanes Closed : There are two of three lanes closed.
Nearest town: 17.63 miles from Rudley Green.
Location: eastbound exit slip to the A1089 .
Lane Closures : Lane one is closed.
Due to: Emergency roadworks.
Period : expect disruption until 05:00 on 22 November 2024.
Lanes Closed : There is one of two lanes closed.
Nearest town: 18.43 miles from Rudley Green.
Location: westbound exit slip to the A1089 .
Lane Closures : Lane one is closed.
Due to: Emergency roadworks.
Period : expect disruption until 05:00 on 22 November 2024.
Lanes Closed : There is one of two lanes closed.
Nearest town: 18.16 miles from Rudley Green.
Location: southbound between the junctions with the A13 and the A126 Grays.
Lane Closures : Lane one is closed.
Due to: Emergency roadworks.
Period : expect disruption until 05:00 on 22 November 2024.
Lanes Closed : There is one of two lanes closed.
Nearest town: 18.48 miles from Rudley Green.
Location: southbound between junctions J23 and J17 .
Due to: Roadworks scheme.
Period : from 21:00 on 20 November 2024 to 05:00 on 28 November 2024.
Nearest town: 9.25 miles from Rudley Green.
Location: northbound between junctions J20A and J23 .
Due to: Roadworks scheme.
Period : from 21:00 on 19 November 2024 to 05:00 on 5 December 2024.
Nearest town: 5.61 miles from Rudley Green.
Location: anticlockwise between junctions J28 (Chelmsford) and J28 (Chelmsford) .
Due to: Roadworks scheme.
Period : from 05:21 on 29 June 2024 to 05:00 on 30 November 2024.
Nearest town: 17.58 miles from Rudley Green.
Location: anticlockwise between junctions J28 (Chelmsford) and J27 (Stansted) .
Lane Closures : The hard shoulder and lane 1 are closed.
Due to: Roadworks.
Period : expect disruption until 05:00 on 30 November 2024.
Lanes Closed : There is one of four lanes closed.
Nearest town: 17.68 miles from Rudley Green.
Location: anticlockwise entry slip at junction J28 (Chelmsford) .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 05:00 on 30 November 2024.
Lanes Closed : There is one of two lanes closed.
Nearest town: 17.58 miles from Rudley Green.
Location: anticlockwise at junction J28 (Chelmsford) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 05:00 on 30 November 2024.
Nearest town: 17.5 miles from Rudley Green.
Location: westbound exit slip to the A1012 .
Due to: Emergency litter clearance is planned.
Status : Pending.
Schedule : From 22:00 on 28 November 2024 to 05:00 on 29 November 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 19.52 miles from Rudley Green.
Location: westbound between the A1089 and the junction with the A1012 .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Emergency litter clearance is planned.
Status : Pending.
Schedule : From 22:00 on 28 November 2024 to 05:00 on 29 November 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 18.9 miles from Rudley Green.
Location: southbound between junctions J15 and J13 .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 28 November 2024 to 30 November 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 10.34 miles from Rudley Green.
Location: northbound between junctions J12 and J15 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 28 November 2024 to 30 November 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 11.63 miles from Rudley Green.
Location: northbound between junctions J12 and J15 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 2 December 2024 to 05:00 on 3 December 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 11.64 miles from Rudley Green.
Location: southbound between junctions J15 and J13 .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 21:00 on 28 November 2024 to 05:00 on 30 November 2024.
Nearest town: 10.34 miles from Rudley Green.
Location: southbound between junctions J15 and J13 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 28 November 2024 to 30 November 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 10.67 miles from Rudley Green.
Location: northbound between junctions J12 and J15 .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 21:00 on 28 November 2024 to 05:00 on 3 December 2024.
Nearest town: 11.64 miles from Rudley Green.
Location: northbound between junctions J12 and J15 .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 28 November 2024 to 30 November 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 10.85 miles from Rudley Green.
Location: northbound between junctions J12 and J15 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 2 December 2024 to 05:00 on 3 December 2024.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 10.85 miles from Rudley Green.
Location: northbound entry slip at junction J29 .
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 28 November 2024 to 05:00 on 29 November 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.9 miles from Rudley Green.
Location: eastbound between the M11 and the junction with the A131 North.
Lane Closures : Lane one will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 20:00 on 28 November 2024 to 06:00 on 29 November 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 13.27 miles from Rudley Green.
Location: anticlockwise at junction J29 (Romford) .
Lane Closures : Lane three will be closed.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 27 November 2024 to 05:30 on 28 November 2024.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 17.73 miles from Rudley Green.
Location: anticlockwise between junctions J30 (Dagenham) and J29 (Romford) .
Lane Closures : Lanes 3 and 4 will be closed.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 27 November 2024 to 05:30 on 28 November 2024.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 19.02 miles from Rudley Green.
Location: eastbound between the A12 and the junction with the A136 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 25 November 2024 to 29 November 2024.
Schedule : From 20:00 on 29 November 2024 to 07:00 on 30 November 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 2 December 2024 to 6 December 2024.
Schedule : From 20:00 on 6 December 2024 to 07:00 on 7 December 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 19.91 miles from Rudley Green.
Location: southbound entry slip at junction J29 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 20 January 2025 to 25 January 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 27 January 2025 to 1 February 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 3 February 2025 to 8 February 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 10 February 2025 to 15 February 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.84 miles from Rudley Green.
Location: westbound exit slip to the A12 Colchester East.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 20 January 2025 to 25 January 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 27 January 2025 to 1 February 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 3 February 2025 to 8 February 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 10 February 2025 to 15 February 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.91 miles from Rudley Green.
Location: eastbound between the junctions with the A12 and the A136 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 06:00 on 23 November 2024 to 20:00 on 25 November 2024.
Schedule : Expect disruption everyday between 06:00 and 20:00 from 26 November 2024 to 29 November 2024.
Schedule : From 07:00 on 30 November 2024 to 06:00 on 2 December 2024.
Schedule : Expect disruption everyday between 06:00 and 20:00 from 2 December 2024 to 6 December 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.86 miles from Rudley Green.
Location: eastbound at the junction with the A12 Colchester East.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 25 November 2024 to 29 November 2024.
Schedule : From 20:00 on 29 November 2024 to 07:00 on 30 November 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 2 December 2024 to 6 December 2024.
Schedule : From 20:00 on 6 December 2024 to 07:00 on 7 December 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 19.89 miles from Rudley Green.
Location: northbound between junctions J28 and J29 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 25 November 2024 to 29 November 2024.
Schedule : From 20:00 on 29 November 2024 to 07:00 on 30 November 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 2 December 2024 to 6 December 2024.
Schedule : From 20:00 on 6 December 2024 to 07:00 on 7 December 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.54 miles from Rudley Green.
Location: clockwise exit slip at junction J28 (Chelmsford) southbound.
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 22:00 on 27 November 2024 to 05:30 on 29 November 2024.
Nearest town: 17.55 miles from Rudley Green.
Location: clockwise exit slip at junction J28 (Chelmsford) southbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 27 November 2024 to 29 November 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 17.55 miles from Rudley Green.
Location: clockwise between junctions J27 (Stansted) and J28 (Chelmsford) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 27 November 2024 to 29 November 2024.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 18.05 miles from Rudley Green.
Location: clockwise at junction J28 (Chelmsford) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 27 November 2024 to 29 November 2024.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 17.62 miles from Rudley Green.
Location: southbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 27 November 2024 to 29 November 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 17.45 miles from Rudley Green.
Location: northbound between junctions J11 and J13 .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 27 November 2024 to 05:00 on 28 November 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 13.81 miles from Rudley Green.
Location: northbound entry slip at junction J12 .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 27 November 2024 to 05:00 on 28 November 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 13.39 miles from Rudley Green.
Location: clockwise between junctions J28 (Chelmsford) and J29 (Romford) .
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 09:30 on 27 November 2024 to 16:00 on 27 November 2024.
Nearest town: 17.72 miles from Rudley Green.
Location: anticlockwise between junctions J29 (Romford) and J28 (Chelmsford) .
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 09:30 on 27 November 2024 to 16:00 on 27 November 2024.
Nearest town: 17.73 miles from Rudley Green.
Location: westbound between the A1089 and the junction with the A1012 .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 22:00 on 26 November 2024 to 05:00 on 27 November 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 18.16 miles from Rudley Green.
Location: northbound exit slip at junction J22 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 25 November 2024 to 05:00 on 26 November 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 7.77 miles from Rudley Green.
Location: northbound between junctions J20A and J20B .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 28 November 2024 to 05:00 on 29 November 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 6.02 miles from Rudley Green.
Location: northbound entry slip at junction J22 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 25 November 2024 to 05:00 on 26 November 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 7.79 miles from Rudley Green.
Location: southbound exit slip at junction J22 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 26 November 2024 to 05:00 on 27 November 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 7.96 miles from Rudley Green.
Location: southbound entry slip at junction J22 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 26 November 2024 to 05:00 on 27 November 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 7.84 miles from Rudley Green.
Location: southbound between junctions J24 and J22 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 26 November 2024 to 05:00 on 27 November 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 8.1 miles from Rudley Green.
Location: southbound entry slip at junction J17 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 27 November 2024 to 05:00 on 28 November 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 5.55 miles from Rudley Green.
Location: southbound exit slip at junction J17 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 27 November 2024 to 05:00 on 28 November 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 5.47 miles from Rudley Green.
Location: southbound between junctions J18 and J17 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 27 November 2024 to 05:00 on 28 November 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 5.29 miles from Rudley Green.
Location: northbound entry slip at junction J20B .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 4 December 2024 to 05:00 on 5 December 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 5.98 miles from Rudley Green.
Location: northbound between junctions J20A and J20B .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 3 December 2024 to 05:00 on 4 December 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 6.03 miles from Rudley Green.
Location: northbound between junctions J20A and J20B .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 29 November 2024 to 05:00 on 30 November 2024.
Schedule : From 21:00 on 2 December 2024 to 05:00 on 3 December 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 6.03 miles from Rudley Green.
Location: northbound between junctions J19 and J20B .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 29 November 2024 to 05:00 on 30 November 2024.
Schedule : From 21:00 on 2 December 2024 to 05:00 on 3 December 2024.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 6.25 miles from Rudley Green.
Location: northbound exit slip at junction J20A .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 29 November 2024 to 05:00 on 30 November 2024.
Schedule : From 21:00 on 2 December 2024 to 05:00 on 3 December 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 6.03 miles from Rudley Green.
Location: clockwise between junctions J29 (Romford) and J30 (Dagenham) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 25 November 2024 to 05:00 on 26 November 2024.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 17.78 miles from Rudley Green.
Location: westbound between the A1089 and the junction with the A1012 .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 25 November 2024 to 05:00 on 26 November 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 18.16 miles from Rudley Green.
Location: clockwise between junctions J28 (Chelmsford) and J29 (Romford) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 25 November 2024 to 05:00 on 26 November 2024.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 17.67 miles from Rudley Green.
Location: clockwise at junction J29 (Romford) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 25 November 2024 to 05:00 on 26 November 2024.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 17.63 miles from Rudley Green.
Location: clockwise between junctions J29 (Romford) and J30 (Dagenham) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 26 November 2024 to 29 November 2024.
Schedule : From 23:00 on 29 November 2024 to 06:00 on 30 November 2024.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 18.68 miles from Rudley Green.
Location: clockwise between junctions J29 (Romford) and J30 (Dagenham) .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 09:30 and 16:00 from 25 November 2024 to 29 November 2024.
Nearest town: 19.06 miles from Rudley Green.
Location: anticlockwise entry slip at junction J28 (Chelmsford) .
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 23 November 2024 to 05:30 on 24 November 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 17.58 miles from Rudley Green.
Location: southbound exit slip to the A126 .
Due to: Emergency roadworks.
Period : expect disruption until 17:00 on 23 December 2024.
Lanes Closed : All lanes are closed.
Nearest town: 19.59 miles from Rudley Green.
Location: northbound between junctions J32B and J33 .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 21:00 on 24 November 2024 to 05:00 on 25 November 2024.
Nearest town: 6.03 miles from Rudley Green.
Location: eastbound between the A12 and the junction with the A136 .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 06:00 on 23 November 2024 to 06:00 on 18 January 2025.
Nearest town: 19.91 miles from Rudley Green.
Location: clockwise exit slip at junction J28 (Chelmsford) southbound.
Lane Closures : Lane one will be closed.
Due to: Litter clearance is planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 13 August 2025 to 15 August 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 17.56 miles from Rudley Green.