Location: southbound between junctions A666 and J2 .
Lane Closures : The hard shoulder and lane 1 are closed.
Due to: Road traffic collision.
Time To Clear : The event is expected to clear between 01:45 and 02:00 on 21 April 2025.
Normal traffic conditions are expected between 01:45 and 02:00 on 21 April 2025.
Lanes Closed : There is one of three lanes closed.
Nearest town: 19.48 miles from Preston.

Location: northbound exit slip at junction J23 (Haydock) .
Due to: Congestion.
Normal traffic conditions are expected between 00:00 and 00:15 on 21 April 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 19.54 miles from Preston.

Location: northbound between junctions J8 and J9 .
Due to: Roadworks scheme.
Period : from 20:02 on 16 April 2025 to 06:00 on 24 April 2025.
Nearest town: 4.26 miles from Preston.

Location: northbound between junctions J32 (Blackpool) and J34 (Lancaster) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 20:00 on 21 April 2025 to 05:00 on 22 April 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 15.87 miles from Preston.

Location: southbound between the junctions with the A586 Great Eccleston and the M55 .
Due to: Emergency roadworks.
Period : expect disruption until 19:00 on 22 April 2025.
Nearest town: 9.41 miles from Preston.

Location: northbound between the junctions with the M55 and the A586 Great Eccleston.
Due to: Emergency roadworks.
Period : expect disruption until 19:00 on 22 April 2025.
Nearest town: 9.39 miles from Preston.

Location: southbound between junctions J6 and J5 .
Lane Closures : The hard shoulder is closed.
Due to: Road repairs.
Period : expect disruption until 23:59 on 31 May 2025.
Nearest town: 14.97 miles from Preston.

Location: westbound between junctions J7 (Accrington) and J6 (Blackburn) .
Lane Closures : Lane one is closed.
Due to: Barrier repairs.
Period : expect disruption until 05:00 on 21 April 2025.
Lanes Closed : There is one of three lanes closed.
Nearest town: 12.69 miles from Preston.

Location: westbound entry slip at junction J7 (Accrington) .
Lane Closures : Lane one is closed.
Due to: Barrier repairs.
Period : expect disruption until 05:00 on 21 April 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 12.67 miles from Preston.

Location: southbound at junction J8 .
Lane Closures : The hard shoulder is closed.
Due to: Emergency barrier repairs.
Period : expect disruption until 23:59 on 31 May 2025.
Nearest town: 6.06 miles from Preston.

Location: eastbound between junctions J9 (Burnley) and J10 (Burnley) .
Lane Closures : The hard shoulder is closed.
Due to: Emergency barrier repairs.
Period : expect disruption until 23:59 on 31 May 2025.
Nearest town: 16.76 miles from Preston.

Location: westbound between junctions J1 (M6) and J1A (Preston) .
Due to: Roadworks scheme.
Period : from 20:05 on 16 April 2025 to 06:00 on 24 April 2025.
Nearest town: 2.81 miles from Preston.

Location: eastbound between junctions J1 (Kirkby) and M6 .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 30 March 2026.
Nearest town: 18.41 miles from Preston.

Location: westbound between junctions M6 and J5 (Skelmersdale) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 30 March 2026.
Nearest town: 14.86 miles from Preston.

Location: eastbound between junctions J5 (Skelmersdale) and M6 .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 30 March 2026.
Nearest town: 14.76 miles from Preston.

Location: westbound between junction J1 (Kirkby) and the M57 .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 30 March 2026.
Nearest town: 18.21 miles from Preston.

Location: westbound between junctions M6 and J1 (Kirkby) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 30 March 2026.
Nearest town: 14.77 miles from Preston.

Location: southbound exit slip at junction J1 to A580.
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 31 March 2026.
Nearest town: 19.79 miles from Preston.

Location: southbound between the M6 and junction J9 .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 31 March 2026.
Nearest town: 2.4 miles from Preston.

Location: northbound between junctions J2 and J9 .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 31 March 2026.
Nearest town: 19.63 miles from Preston.

Location: northbound between junction J9 and the M6 .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 31 March 2026.
Nearest town: 3.76 miles from Preston.

Location: southbound between the M6 and junction J2 .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 31 March 2026.
Nearest town: 2.66 miles from Preston.

Location: northbound between junctions J33 (Lancaster) and J34 (Lancaster) .
Lane Closures : The hard shoulder is closed.
Due to: Barrier repairs.
Period : expect disruption until 17:00 on 31 December 2025.
Nearest town: 19.73 miles from Preston.

Location: westbound between junctions J10 (Burnley) and J9 (Burnley) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 30 March 2026.
Nearest town: 17.92 miles from Preston.

Location: eastbound between junctions J9 (Burnley) and J10 (Burnley) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 30 March 2026.
Nearest town: 16.31 miles from Preston.

Location: eastbound between junctions J6 (Blackburn) and J10 (Burnley) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 30 March 2026.
Nearest town: 11.36 miles from Preston.

Location: eastbound between junctions J1 (M6) and J2 (Manchester) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 30 March 2026.
Nearest town: 3.07 miles from Preston.

Location: eastbound between junctions J1A (Preston) and J1 (M6) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 30 March 2026.
Nearest town: 2.46 miles from Preston.

Location: westbound between junctions J4 (Blackburn) and J3 (Blackburn) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 30 March 2026.
Nearest town: 9.34 miles from Preston.

Location: westbound between junctions J6 (Blackburn) and J4 (Blackburn) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 30 March 2026.
Nearest town: 11.18 miles from Preston.

Location: eastbound between junctions J4 (Blackburn) and J5 (Shadsworth) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 30 March 2026.
Nearest town: 9.56 miles from Preston.

Location: eastbound between junctions J3 (Blackburn) and J4 (Blackburn) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 30 March 2026.
Nearest town: 6.91 miles from Preston.

Location: eastbound between junctions J2 (Manchester) and J4 (Blackburn) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 30 March 2026.
Nearest town: 3.36 miles from Preston.

Location: westbound between junctions J4 (Blackburn) and J1A (Preston) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 30 March 2026.
Nearest town: 8.28 miles from Preston.

Location: westbound between junctions J10 (Burnley) and J6 (Blackburn) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 30 March 2026.
Nearest town: 16.26 miles from Preston.

Location: eastbound between junctions J5 (Shadsworth) and J6 (Blackburn) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 30 March 2026.
Nearest town: 10.44 miles from Preston.

Location: eastbound between junctions J3 (Blackburn) and J4 (Blackburn) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 30 March 2026.
Nearest town: 8.4 miles from Preston.

Location: northbound at junction J4 .
Lane Closures : The hard shoulder is closed.
Due to: Emergency barrier repairs.
Period : expect disruption until 23:59 on 30 April 2025.
Nearest town: 17.6 miles from Preston.

Location: westbound at junction J1 (Kirkby) .
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 27 April 2025 to 05:00 on 28 April 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 18.21 miles from Preston.

Location: westbound between junctions J3 (Southport) and J1 (Kirkby) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 27 April 2025 to 05:00 on 28 April 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 16.13 miles from Preston.

Location: eastbound between junctions J1 (Kirkby) and J3 (Southport) .
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 27 April 2025 to 05:00 on 28 April 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 18.41 miles from Preston.

Location: eastbound between the M57 and junction J1 (Kirkby) .
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 27 April 2025 to 05:00 on 28 April 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 18.97 miles from Preston.

Location: eastbound between junction J1 (Preston) and the M6 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 19:00 on 27 April 2025 to 05:00 on 28 April 2025.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 3.72 miles from Preston.

Location: eastbound at junction J1 (Preston) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 19:00 on 27 April 2025 to 05:00 on 28 April 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 3.59 miles from Preston.

Location: slip road to the M6 northbound .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 19:00 on 27 April 2025 to 05:00 on 28 April 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 3.86 miles from Preston.

Location: northbound between junctions J32 (Blackpool) and J33 (Lancaster) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 19:00 on 27 April 2025 to 05:00 on 28 April 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 3.95 miles from Preston.

Location: southbound between junctions J33 (Lancaster) and J32 (Blackpool) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 19:00 on 27 April 2025 to 05:00 on 28 April 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 5.85 miles from Preston.

Location: westbound exit slip at junction J1 (Kirkby) .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 26 April 2025 to 05:00 on 27 April 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.21 miles from Preston.

Location: westbound entry slip at junction J1 (Preston) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 19:00 on 26 April 2025 to 05:00 on 27 April 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 3.55 miles from Preston.

Location: westbound between junctions J10 (Burnley) and J8 (Bury) .
Lane Closures : Lane one will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 10:00 and 17:00 from 26 April 2025 to 27 April 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 15.95 miles from Preston.

Location: southbound entry slip at junction J1 (Ramsbottom) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:30 and 05:00 from 25 April 2025 to 27 April 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.19 miles from Preston.

Location: southbound between the A56 and junction J1 (Ramsbottom) .
Lane Closures : Lane one will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:30 and 05:00 from 25 April 2025 to 27 April 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 18.27 miles from Preston.

Location: eastbound between junctions J1 (Kirkby) and J3 (Southport) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 25 April 2025 to 05:00 on 26 April 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 18.41 miles from Preston.

Location: eastbound between the M57 and junction J1 (Kirkby) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 25 April 2025 to 05:00 on 26 April 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.96 miles from Preston.

Location: eastbound exit slip at junction J1 (Kirkby) .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 25 April 2025 to 05:00 on 26 April 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.67 miles from Preston.

Location: eastbound entry slip at junction J1 (Kirkby) .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 25 April 2025 to 05:00 on 26 April 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.38 miles from Preston.

Location: northbound between junctions J2 (Bury) and J1 (Ramsbottom) .
Lane Closures : Lane two will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 23:00 on 24 April 2025 to 05:00 on 25 April 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.52 miles from Preston.

Location: northbound between junctions J2 (Bury) and J1 (Ramsbottom) .
Lane Closures : Lane two will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 23:00 on 24 April 2025 to 05:00 on 25 April 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 19.96 miles from Preston.

Location: southbound between junctions A56 and J2 (Bury) .
Lane Closures : Lane two will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 23:00 on 24 April 2025 to 05:00 on 25 April 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.17 miles from Preston.

Location: westbound entry slip at junction J1 (M6) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Emergency roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 21:00 on 24 April 2025 to 05:00 on 25 April 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 2.76 miles from Preston.

Location: westbound between junctions J1 (M6) and J1A (Preston) .
Lane Closures : Lane one will be closed.
Due to: Emergency roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 21:00 on 24 April 2025 to 05:00 on 25 April 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 2.82 miles from Preston.

Location: eastbound between junctions J3 (Blackburn) and J4 (Blackburn) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 24 April 2025 to 05:00 on 26 April 2025.
Nearest town: 6.65 miles from Preston.

Location: eastbound between junctions J3 (Blackburn) and J4 (Blackburn) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 05:00 from 24 April 2025 to 26 April 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 6.91 miles from Preston.

Location: eastbound between junctions J3 (Blackburn) and J4 (Blackburn) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 05:00 from 24 April 2025 to 26 April 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 6.65 miles from Preston.

Location: westbound between junctions J4 (Blackburn) and J3 (Blackburn) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 05:00 from 24 April 2025 to 26 April 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 8.95 miles from Preston.

Location: westbound entry slip at junction J2 .
Lane Closures : Lane one will be closed.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 05:00 from 24 April 2025 to 26 April 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 4.64 miles from Preston.

Location: westbound between junctions J4 (Blackburn) and J3 (Blackburn) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 24 April 2025 to 05:00 on 26 April 2025.
Nearest town: 8.95 miles from Preston.

Location: westbound between junctions J4 (Blackburn) and J3 (Blackburn) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 05:00 from 24 April 2025 to 26 April 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 8.28 miles from Preston.

Location: southbound between the junctions with the A586 Great Eccleston and the M55 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 22 April 2025 to 06:00 on 23 April 2025.
Nearest town: 9.07 miles from Preston.

Location: southbound between junctions J26 (Wigan) and J25 (Ashton in Makerfield) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 24 April 2025 to 06:00 on 25 April 2025.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 15.29 miles from Preston.

Location: northbound exit slip at junction J23 (Haydock) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 22 April 2025 to 25 April 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.61 miles from Preston.

Location: southbound between junctions J26 (Wigan) and J22 (Newton le Willows) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 21:00 on 24 April 2025 to 06:00 on 25 April 2025.
Nearest town: 15.29 miles from Preston.

Location: southbound between junctions J6 and J5 .
Lane Closures : Lane one will be closed.
Due to: Litter clearance is planned.
Status : Pending.
Schedule : From 21:00 on 23 April 2025 to 05:00 on 24 April 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 15.49 miles from Preston.

Location: northbound entry slip at junction J4 .
Lane Closures : Lane two will be closed.
Due to: Litter clearance is planned.
Status : Pending.
Schedule : From 21:00 on 23 April 2025 to 05:00 on 24 April 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 17.5 miles from Preston.

Location: southbound exit slip at junction J5 .
Lane Closures : Lane one will be closed.
Due to: Litter clearance is planned.
Status : Pending.
Schedule : From 21:00 on 23 April 2025 to 05:00 on 24 April 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 15.75 miles from Preston.

Location: southbound entry slip at junction J4 .
Lane Closures : Lane two will be closed.
Due to: Litter clearance is planned.
Status : Pending.
Schedule : From 21:00 on 23 April 2025 to 05:00 on 24 April 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 17.5 miles from Preston.

Location: northbound between the junctions with the M55 and the A586 Great Eccleston.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 22 April 2025 to 06:00 on 23 April 2025.
Nearest town: 8.97 miles from Preston.

Location: southbound exit slip at junction J3 .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 29 April 2025 to 06:00 on 30 April 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.26 miles from Preston.

Location: northbound exit slip at junction J3 .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 29 April 2025 to 06:00 on 30 April 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.27 miles from Preston.

Location: southbound between junctions J4 and J2 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 29 April 2025 to 06:00 on 30 April 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 18.92 miles from Preston.

Location: southbound between junction J4 and the M60 .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 21:00 on 22 April 2025 to 06:00 on 30 April 2025.
Nearest town: 19.26 miles from Preston.

Location: southbound between the junctions with the A681 and the M66 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 23 April 2025 to 05:00 on 24 April 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 16.76 miles from Preston.

Location: southbound between junctions J8 and J6 .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 08:00 and 18:00 from 22 April 2025 to 23 April 2025.
Nearest town: 7.69 miles from Preston.

Location: westbound entry slip at junction J1 (M6) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 22 April 2025 to 24 April 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 2.81 miles from Preston.

Location: northbound between junctions J8 and J9 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 22 April 2025 to 24 April 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 4.26 miles from Preston.

Location: southbound between junctions A56 and J2 (Bury) .
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 09:00 and 17:00 from 26 April 2025 to 27 April 2025.
Nearest town: 19.22 miles from Preston.

Location: westbound between junctions J2 (Manchester) and J1A (Preston) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 22 April 2025 to 24 April 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 3.84 miles from Preston.

Location: westbound entry slip at junction J2 (Manchester) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 22 April 2025 to 24 April 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 3.59 miles from Preston.

Location: northbound exit slip at junction J9 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 22 April 2025 to 24 April 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 3.65 miles from Preston.

Location: northbound exit slip at junction J9 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 22 April 2025 to 24 April 2025.
Nearest town: 3.76 miles from Preston.

Location: westbound between junctions J3 (Blackburn) and J2 (Manchester) .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 22 April 2025 to 24 April 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 4.14 miles from Preston.

Location: southbound between junctions J8 and J6 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 08:00 on 23 April 2025 to 17:00 on 23 April 2025.
Nearest town: 12.04 miles from Preston.

Location: southbound between the A56 and junction J1 (Ramsbottom) .
Lane Closures : Lane two will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:30 on 22 April 2025 to 05:00 on 23 April 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 16.94 miles from Preston.

Location: southbound between the junctions with the A681 and the M66 .
Lane Closures : Lane two will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:30 on 22 April 2025 to 05:00 on 23 April 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 16.91 miles from Preston.

Location: northbound between junction J1 (Ramsbottom) and the A56 .
Lane Closures : Lane two will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:30 on 22 April 2025 to 05:00 on 23 April 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 18.26 miles from Preston.

Location: eastbound entry slip at junction J2 .
Lane Closures : Lane one will be closed.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 05:00 from 22 April 2025 to 24 April 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 4.69 miles from Preston.

Location: northbound between the junctions with the M55 and the A586 Great Eccleston.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 09:30 on 22 April 2025 to 15:30 on 22 April 2025.
Nearest town: 11.1 miles from Preston.

Location: southbound between the junctions with the A586 Great Eccleston and the M55 .
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 09:30 on 22 April 2025 to 15:30 on 22 April 2025.
Nearest town: 11.44 miles from Preston.

Location: southbound between the junctions with the A586 Hardhorn and the A586 Great Eccleston.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 09:30 on 22 April 2025 to 15:30 on 22 April 2025.
Nearest town: 11.62 miles from Preston.

Location: northbound between junctions J29 (Burnley) and J32 (Blackpool) .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 22 April 2025 to 05:00 on 23 April 2025.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 2.13 miles from Preston.

Location: southbound between junctions J32 (Blackpool) and J31A (Preston) .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 24 April 2025 to 05:00 on 25 April 2025.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 3.46 miles from Preston.

Location: southbound between junctions J32 (Blackpool) and J31 (Preston) .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 24 April 2025 to 05:00 on 25 April 2025.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 3.15 miles from Preston.

Location: southbound entry slip at junction J31A (Preston) .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 24 April 2025 to 05:00 on 25 April 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 3.42 miles from Preston.

Location: southbound between junctions J32 (Blackpool) and J29 (Burnley) .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 25 April 2025 to 05:00 on 26 April 2025.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 3.15 miles from Preston.

Location: southbound between junctions J30 (Manchester) and J29 (Burnley) .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 28 April 2025 to 05:00 on 29 April 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 2.25 miles from Preston.

Location: southbound between junctions J31 (Preston) and J29 (Burnley) .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 28 April 2025 to 05:00 on 29 April 2025.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 2.76 miles from Preston.

Location: northbound exit slip at junction J31A (Preston) .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 23 April 2025 to 05:00 on 24 April 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 3.18 miles from Preston.

Location: slip road to the M6 southbound .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 24 April 2025 to 05:00 on 25 April 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 3.86 miles from Preston.

Location: southbound at junction J32 (Blackpool) .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 24 April 2025 to 05:00 on 25 April 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 4.05 miles from Preston.

Location: northbound between junctions J31 (Preston) and J32 (Blackpool) .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 23 April 2025 to 05:00 on 24 April 2025.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 2.93 miles from Preston.

Location: eastbound exit slip at junction J1 (Kirkby) .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 23 April 2025 to 05:00 on 24 April 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.67 miles from Preston.

Location: westbound entry slip at junction J1 (Kirkby) .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:30 on 4 May 2025 to 05:00 on 5 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.47 miles from Preston.

Location: westbound between junctions J3 (Southport) and J1 (Kirkby) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:30 on 4 May 2025 to 05:00 on 5 May 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 17.48 miles from Preston.

Location: westbound between junction J1 (Kirkby) and the M57 .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:30 on 4 May 2025 to 05:00 on 5 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.21 miles from Preston.

Location: northbound exit slip at junction J27 (Parbold) .
Lane Closures : Lane two will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 20:00 on 25 April 2025 to 05:00 on 28 April 2025.
Schedule : From 20:00 on 9 May 2025 to 05:00 on 12 May 2025.
Schedule : From 20:00 on 16 May 2025 to 05:00 on 19 May 2025.
Schedule : From 20:00 on 30 May 2025 to 05:00 on 2 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 11.32 miles from Preston.

Location: southbound between junctions A666 and J2 from A666 to M60.
Lane Closures : Lane two will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 2 May 2025 to 21:00 on 19 May 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 19.28 miles from Preston.

Location: northbound between junctions J2 and A666 .
Lane Closures : Lane one will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 4 May 2025 to 06:00 on 28 June 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 19.6 miles from Preston.

Location: southbound at junction .
Lane Closures : Lane two will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 2 May 2025 to 21:00 on 19 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.21 miles from Preston.