Location: northbound between the junctions with the A6 and the M1 .
Due to: Congestion.
Normal traffic conditions are expected between 02:15 and 02:30 on 1 May 2025.
Nearest town: 18.09 miles from Melton Mowbray.

Location: northbound between the junctions with the A6 and the M1 .
Due to: Congestion.
Normal traffic conditions are expected between 00:30 and 00:45 on 1 May 2025.
Nearest town: 18.09 miles from Melton Mowbray.

Location: southbound exit slip at junction J23 .
Due to: Congestion.
Normal traffic conditions are expected between 00:00 and 00:15 on 1 May 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 16.32 miles from Melton Mowbray.

Location: southbound between the M1 and junction J14 .
Due to: Roadworks.
Period : from 21:00 on 30 April 2025 to 06:00 on 1 May 2025.
Lanes Closed : All lanes are closed.
Nearest town: 17.94 miles from Melton Mowbray.

Location: The junction of the A42 and the M1 J23A .
Due to: Roadworks.
Period : from 20:43 on 30 April 2025 to 06:00 on 1 May 2025.
Lanes Closed : All lanes are closed.
Nearest town: 18.03 miles from Melton Mowbray.

Location: northbound at the junction with the A52 .
Due to: Roadworks.
Period : from 20:39 on 30 April 2025 to 05:00 on 1 May 2025.
Lanes Closed : All lanes are closed.
Nearest town: 15.89 miles from Melton Mowbray.

Location: northbound between the junctions with the A6097 and the A617 .
Lane Closures : Lane two is closed.
Due to: Road repairs.
Period : expect disruption until 06:00 on 26 May 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 19.92 miles from Melton Mowbray.

Location: eastbound between the junctions with the A6011 and the A46 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 1 May 2025 to 06:00 on 2 May 2025.
Nearest town: 13.8 miles from Melton Mowbray.

Location: westbound between the junctions with the A46 and the A6011 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 1 May 2025 to 06:00 on 2 May 2025.
Nearest town: 13.78 miles from Melton Mowbray.

Location: southbound.
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 1 May 2025 to 06:00 on 10 May 2025.
Nearest town: 15.24 miles from Melton Mowbray.

Location: southbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 1 May 2025 to 06:00 on 2 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 15.24 miles from Melton Mowbray.

Location: southbound exit slip to the A151 .
Due to: Roadworks.
Period : expect disruption until 06:00 on 1 May 2025.
Lanes Closed : All lanes are closed.
Nearest town: 11.65 miles from Melton Mowbray.

Location: southbound entry slip from the A151 .
Due to: Roadworks.
Period : expect disruption until 06:00 on 1 May 2025.
Lanes Closed : All lanes are closed.
Nearest town: 11.7 miles from Melton Mowbray.

Location: northbound between junctions J21 (Coventry) and J22 (Leicester) .
Lane Closures : Lanes 3 and 4 are closed.
Due to: Barrier repairs.
Period : expect disruption until 05:00 on 1 May 2025.
Lanes Closed : There are two of four lanes closed.
Nearest town: 17.1 miles from Melton Mowbray.

Location: southbound exit slip to the A6 .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 1 May 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 11.3 miles from Melton Mowbray.

Location: northbound exit slip to the A52 eastbound.
Due to: Road repairs.
Period : expect disruption until 05:00 on 1 May 2025.
Lanes Closed : All lanes are closed.
Nearest town: 15.94 miles from Melton Mowbray.

Location: southbound between the A46 and the junction with the A151 .
Due to: Roadworks scheme.
Period : from 20:10 on 24 April 2025 to 06:00 on 17 May 2025.
Nearest town: 19 miles from Melton Mowbray.

Location: northbound between the junctions with the A151 and the A607 .
Lane Closures : Lane two is closed.
Due to: Horticultural works.
Period : expect disruption until 06:00 on 1 May 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 11.42 miles from Melton Mowbray.

Location: southbound between the junctions with the A607 and the A151 .
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 1 May 2025 to 06:00 on 2 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 12.91 miles from Melton Mowbray.

Location: northbound.
Due to: Horticultural works.
Period : expect disruption until 06:00 on 1 May 2025.
Lanes Closed : All lanes are closed.
Nearest town: 12.86 miles from Melton Mowbray.

Location: southbound between the A46 and the junction with the A52 .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 1 May 2025 to 06:00 on 2 May 2025.
Schedule : From 20:00 on 6 May 2025 to 06:00 on 7 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 15.47 miles from Melton Mowbray.

Location: northbound between the A52 and the junction with the A46 .
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 6 May 2025 to 06:00 on 7 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 14.77 miles from Melton Mowbray.

Location: eastbound between the junctions with the A6464 and the A6514 .
Due to: Roadworks scheme.
Period : from 20:05 on 24 April 2025 to 06:00 on 18 April 2026.
Nearest town: 18.29 miles from Melton Mowbray.

Location: westbound between the junctions with the A6514 and the A6464 .
Due to: Roadworks scheme.
Period : from 20:05 on 24 April 2025 to 06:00 on 18 April 2026.
Nearest town: 17.79 miles from Melton Mowbray.

Location: southbound between junctions J21 (Coventry) and J20 (Rugby) .
Lane Closures : Lanes 2 and 3 are closed.
Due to: Horticultural works.
Period : expect disruption until 06:00 on 1 May 2025.
Lanes Closed : There are two of three lanes closed.
Nearest town: 18.54 miles from Melton Mowbray.

Location: northbound between the A5630 and the junction with the A6 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 05:00 on 11 May 2025 to 11:00 on 11 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 13.73 miles from Melton Mowbray.

Location: southbound between junctions J24 (E.
Mids Airport) and J23A (Tamworth) .
Due to: Roadworks scheme.
Period : from 20:03 on 24 April 2025 to 06:00 on 17 May 2025.
Nearest town: 17.92 miles from Melton Mowbray.

Location: southbound between the M1 and junction J14 .
Due to: Roadworks scheme.
Period : from 20:01 on 24 April 2025 to 06:00 on 17 May 2025.
Nearest town: 18.01 miles from Melton Mowbray.

Location: westbound between the A6007 and the junction with the M1 .
Due to: Roadworks scheme.
Period : from 20:00 on 30 April 2025 to 06:00 on 23 May 2025.
Nearest town: 19.68 miles from Melton Mowbray.

Location: southbound between junctions J22 (Leicester) and J21A (Leicester) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 09:00 on 30 November 2025.
Nearest town: 16.69 miles from Melton Mowbray.

Location: northbound between junctions J23 and J23A (Tamworth) .
Lane Closures : The hard shoulder is closed.
Due to: Barrier repairs.
Period : expect disruption until 09:00 on 30 November 2025.
Nearest town: 16.65 miles from Melton Mowbray.

Location: southbound between junctions J21 (Coventry) and J20 (Rugby) .
Lane Closures : Lane one will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 20:00 on 7 May 2025 to 05:00 on 8 May 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 18.1 miles from Melton Mowbray.

Location: westbound between the A6007 and the junction with the M1 .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 1 May 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 19.68 miles from Melton Mowbray.

Location: northbound between junctions J24 (E.
Mids Airport) and J25 (Nottingham) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 16 May 2025 to 06:00 on 17 May 2025.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 19.9 miles from Melton Mowbray.

Location: northbound between junctions J24 (E.
Mids Airport) and J25 (Nottingham) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 19 May 2025 to 06:00 on 20 May 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 19.77 miles from Melton Mowbray.

Location: northbound between junctions J24 (E.
Mids Airport) and J25 (Nottingham) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 14 May 2025 to 06:00 on 15 May 2025.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 19.84 miles from Melton Mowbray.

Location: southbound between junctions J21 (Coventry) and J19 (Rugby) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 08:00 on 13 May 2025 to 15:30 on 13 May 2025.
Nearest town: 17.24 miles from Melton Mowbray.

Location: northbound between the A151 and the junction with the A52 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 6 May 2025 to 9 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 13.06 miles from Melton Mowbray.

Location: northbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 13 May 2025 to 06:00 on 14 May 2025.
Nearest town: 15.99 miles from Melton Mowbray.

Location: northbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 13 May 2025 to 06:00 on 14 May 2025.
Nearest town: 16.05 miles from Melton Mowbray.

Location: northbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 13 May 2025 to 06:00 on 14 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 15.99 miles from Melton Mowbray.

Location: southbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 14 May 2025 to 06:00 on 15 May 2025.
Nearest town: 15.97 miles from Melton Mowbray.

Location: southbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 14 May 2025 to 06:00 on 15 May 2025.
Nearest town: 16.04 miles from Melton Mowbray.

Location: southbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 14 May 2025 to 06:00 on 15 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 16.04 miles from Melton Mowbray.

Location: northbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 6 May 2025 to 06:00 on 7 May 2025.
Nearest town: 18.07 miles from Melton Mowbray.

Location: northbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 6 May 2025 to 06:00 on 7 May 2025.
Nearest town: 18.06 miles from Melton Mowbray.

Location: northbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 6 May 2025 to 06:00 on 7 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.01 miles from Melton Mowbray.

Location: southbound between the A617 and the junction with the A6097 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 6 May 2025 to 9 May 2025.
Schedule : From 20:00 on 12 May 2025 to 06:00 on 13 May 2025.
Schedule : From 20:00 on 14 May 2025 to 06:00 on 15 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 18.3 miles from Melton Mowbray.

Location: southbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 6 May 2025 to 8 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.04 miles from Melton Mowbray.

Location: southbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 6 May 2025 to 8 May 2025.
Nearest town: 17.97 miles from Melton Mowbray.

Location: southbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 6 May 2025 to 8 May 2025.
Nearest town: 18.04 miles from Melton Mowbray.

Location: northbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 8 May 2025 to 06:00 on 9 May 2025.
Schedule : From 20:00 on 12 May 2025 to 06:00 on 13 May 2025.
Nearest town: 17.23 miles from Melton Mowbray.

Location: northbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 8 May 2025 to 06:00 on 9 May 2025.
Schedule : From 20:00 on 12 May 2025 to 06:00 on 13 May 2025.
Nearest town: 17.15 miles from Melton Mowbray.

Location: southbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 8 May 2025 to 06:00 on 9 May 2025.
Schedule : From 20:00 on 12 May 2025 to 06:00 on 13 May 2025.
Nearest town: 17.15 miles from Melton Mowbray.

Location: southbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 8 May 2025 to 06:00 on 9 May 2025.
Schedule : From 20:00 on 12 May 2025 to 06:00 on 13 May 2025.
Nearest town: 17.22 miles from Melton Mowbray.

Location: northbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 8 May 2025 to 06:00 on 9 May 2025.
Schedule : From 20:00 on 12 May 2025 to 06:00 on 13 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 17.17 miles from Melton Mowbray.

Location: northbound between the A6097 and the junction with the A617 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 6 May 2025 to 9 May 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 12 May 2025 to 14 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 17.43 miles from Melton Mowbray.

Location: southbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 8 May 2025 to 06:00 on 9 May 2025.
Schedule : From 20:00 on 12 May 2025 to 06:00 on 13 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 17.22 miles from Melton Mowbray.

Location: westbound between the M1 and the junction with the A6 .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 19:00 and 05:00 from 6 May 2025 to 10 May 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 19.99 miles from Melton Mowbray.

Location: eastbound.
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 19:00 on 6 May 2025 to 05:00 on 7 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.85 miles from Melton Mowbray.

Location: southbound.
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 2 May 2025 to 06:00 on 3 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 15.89 miles from Melton Mowbray.

Location: southbound between the junctions with the A46 and the A52 .
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 2 May 2025 to 06:00 on 3 May 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 8 May 2025 to 10 May 2025.
Schedule : From 20:00 on 13 May 2025 to 06:00 on 14 May 2025.
Schedule : From 20:00 on 16 May 2025 to 06:00 on 17 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 17.31 miles from Melton Mowbray.

Location: northbound between the A52 and the junction with the A46 .
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 8 May 2025 to 10 May 2025.
Schedule : From 20:00 on 19 May 2025 to 06:00 on 20 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 15.77 miles from Melton Mowbray.

Location: southbound.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 16 May 2025 to 06:00 on 17 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.94 miles from Melton Mowbray.

Location: northbound.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 05:59 on 2 July 2025 to 06:00 on 2 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.88 miles from Melton Mowbray.

Location: westbound between the A60 and the junction with the A453 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 12 May 2025 to 15 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 15.68 miles from Melton Mowbray.

Location: westbound between the A60 and the junction with the A453 .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 6 May 2025 to 06:00 on 15 May 2025.
Nearest town: 15.68 miles from Melton Mowbray.

Location: westbound entry slip from the A453 .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 12 May 2025 to 15 May 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 15.94 miles from Melton Mowbray.

Location: westbound entry slip from the A453 .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 6 May 2025 to 10 May 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 15.94 miles from Melton Mowbray.

Location: westbound at the junction with the A453 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 12 May 2025 to 15 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 15.91 miles from Melton Mowbray.

Location: westbound entry slip from the A453 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 12 May 2025 to 15 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 15.92 miles from Melton Mowbray.

Location: northbound at the junction with the A52 .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 6 May 2025 to 06:00 on 15 May 2025.
Nearest town: 15.94 miles from Melton Mowbray.

Location: northbound at the junction with the A52 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 12 May 2025 to 15 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 15.94 miles from Melton Mowbray.

Location: northbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 6 May 2025 to 10 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 15.91 miles from Melton Mowbray.

Location: northbound at the junction with the A52 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 6 May 2025 to 10 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 15.94 miles from Melton Mowbray.

Location: southbound between junctions J24 (E.
Mids Airport) and J23A (Tamworth) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 20:00 on 3 May 2025 to 05:00 on 4 May 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 17.92 miles from Melton Mowbray.

Location: southbound at junction J23A (Tamworth) .
Lane Closures : Lane one will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 20:00 on 3 May 2025 to 05:00 on 4 May 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 17.97 miles from Melton Mowbray.

Location: northbound between junction J14 and the M1 .
Lane Closures : Lane one will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 20:00 on 2 May 2025 to 05:00 on 3 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.7 miles from Melton Mowbray.

Location: southbound between the A617 and the junction with the A606 .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 2 May 2025 to 06:00 on 30 May 2025.
Nearest town: 15.22 miles from Melton Mowbray.

Location: southbound.
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 6 May 2025 to 8 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 11.67 miles from Melton Mowbray.

Location: southbound.
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 2 May 2025 to 06:00 on 3 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 11.89 miles from Melton Mowbray.

Location: southbound between the A52 and the junction with the A606 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 2 May 2025 to 06:00 on 3 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 12.27 miles from Melton Mowbray.

Location: northbound.
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 8 May 2025 to 10 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 11.76 miles from Melton Mowbray.

Location: northbound between the junctions with the A606 and the A52 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 12 May 2025 to 14 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 11.31 miles from Melton Mowbray.

Location: northbound.
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 12 May 2025 to 14 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 11.5 miles from Melton Mowbray.

Location: northbound between junctions J21 (Coventry) and J22 (Leicester) .
Lane Closures : Lanes 3 and 4 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 9 May 2025 to 06:00 on 10 May 2025.
Schedule : From 20:00 on 12 May 2025 to 06:00 on 13 May 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 17.18 miles from Melton Mowbray.

Location: northbound between the A606 and the junction with the A6097 .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 8 May 2025 to 06:00 on 23 May 2025.
Nearest town: 11.31 miles from Melton Mowbray.

Location: northbound exit slip to the A6097 .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 19 May 2025 to 21 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 14.16 miles from Melton Mowbray.

Location: northbound entry slip from the A6097 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 21 May 2025 to 23 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 14.44 miles from Melton Mowbray.

Location: northbound exit slip at junction J21A (Leicester) for B5380.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 7 May 2025 to 06:00 on 8 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 16.74 miles from Melton Mowbray.

Location: southbound entry slip at junction J21A (Leicester) from A46/B5380.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 6 May 2025 to 06:00 on 7 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 16.45 miles from Melton Mowbray.

Location: southbound between junctions J22 (Leicester) and J21A (Leicester) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 9 May 2025 to 06:00 on 10 May 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 12 May 2025 to 14 May 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 16.7 miles from Melton Mowbray.

Location: southbound entry slip at junction J21A (Leicester) from B5380.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 6 May 2025 to 06:00 on 7 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 16.56 miles from Melton Mowbray.

Location: southbound between junctions J22 (Leicester) and J21A (Leicester) .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 6 May 2025 to 06:00 on 7 May 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 17.08 miles from Melton Mowbray.

Location: southbound between the junctions with the A50 and the M1 .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 6 May 2025 to 06:00 on 7 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 16.34 miles from Melton Mowbray.

Location: northbound exit slip at junction J21A (Leicester) for A46.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 7 May 2025 to 06:00 on 8 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 16.69 miles from Melton Mowbray.

Location: southbound between the junctions with the A50 and the M1 .
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 6 May 2025 to 06:00 on 7 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 16.09 miles from Melton Mowbray.

Location: northbound entry slip at junction J21 (Coventry) .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 7 May 2025 to 06:00 on 8 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 17.4 miles from Melton Mowbray.

Location: southbound between junctions J22 (Leicester) and J21 (Coventry) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 6 May 2025 to 06:00 on 7 May 2025.
Schedule : From 20:00 on 8 May 2025 to 06:00 on 9 May 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 16.68 miles from Melton Mowbray.

Location: northbound between junctions J21A (Leicester) and J22 (Leicester) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 9 May 2025 to 06:00 on 10 May 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 12 May 2025 to 14 May 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 16.69 miles from Melton Mowbray.

Location: northbound between junctions J20 (Rugby) and J21 (Coventry) .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 2 May 2025 to 06:00 on 3 May 2025.
Schedule : From 20:00 on 7 May 2025 to 06:00 on 8 May 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 17.64 miles from Melton Mowbray.

Location: northbound at junction J21 (Coventry) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 2 May 2025 to 06:00 on 3 May 2025.
Schedule : From 20:00 on 7 May 2025 to 06:00 on 8 May 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 17.52 miles from Melton Mowbray.

Location: northbound between junction J1 (Nuneaton) and the M1 .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 7 May 2025 to 06:00 on 8 May 2025.
Nearest town: 17.68 miles from Melton Mowbray.

Location: southbound between the A617 and the junction with the A6097 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 27 May 2025 to 06:00 on 28 May 2025.
Schedule : From 20:00 on 29 May 2025 to 06:00 on 30 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 15.22 miles from Melton Mowbray.

Location: southbound exit slip to the A6097 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 27 May 2025 to 06:00 on 28 May 2025.
Schedule : From 20:00 on 29 May 2025 to 06:00 on 30 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 15.14 miles from Melton Mowbray.

Location: northbound exit slip at Leicester Forest East Services.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 7 May 2025 to 06:00 on 8 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 16.96 miles from Melton Mowbray.

Location: southbound entry slip at Leicester Forest East Services.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 22:00 on 6 May 2025 to 06:00 on 7 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 16.92 miles from Melton Mowbray.

Location: northbound entry slip at Leicester Forest East Services.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 22:00 on 7 May 2025 to 06:00 on 8 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 16.91 miles from Melton Mowbray.

Location: northbound between junctions J21 (Coventry) and J22 (Leicester) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 2 May 2025 to 06:00 on 3 May 2025.
Schedule : From 20:00 on 7 May 2025 to 06:00 on 8 May 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 17.21 miles from Melton Mowbray.

Location: southbound exit slip at Leicester Forest East Services.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 6 May 2025 to 06:00 on 7 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 16.88 miles from Melton Mowbray.

Location: southbound between the A607 and the junction with the A606 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 6 May 2025 to 06:00 on 7 May 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 8 May 2025 to 10 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 11.38 miles from Melton Mowbray.

Location: southbound.
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 2 May 2025 to 06:00 on 3 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 15.47 miles from Melton Mowbray.

Location: southbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 6 May 2025 to 06:00 on 7 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 11.44 miles from Melton Mowbray.

Location: southbound exit slip to the A151 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 6 May 2025 to 06:00 on 7 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 11.65 miles from Melton Mowbray.

Location: southbound entry slip from the A151 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 6 May 2025 to 06:00 on 7 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 11.7 miles from Melton Mowbray.

Location: northbound between the A606 and the junction with the A607 .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 7 May 2025 to 06:00 on 10 May 2025.
Nearest town: 11.61 miles from Melton Mowbray.

Location: northbound between the A606 and the junction with the A607 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 7 May 2025 to 10 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 11.61 miles from Melton Mowbray.

Location: northbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 7 May 2025 to 06:00 on 8 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 11.46 miles from Melton Mowbray.

Location: northbound exit slip to the A151 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 7 May 2025 to 06:00 on 8 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 11.65 miles from Melton Mowbray.

Location: northbound.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 14 May 2025 to 06:00 on 15 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 14.47 miles from Melton Mowbray.

Location: southbound between the A6121 and the junction with the A47 .
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 7 May 2025 to 06:00 on 8 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 17.75 miles from Melton Mowbray.

Location: northbound between the A47 and the junction with the A606 .
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 7 May 2025 to 06:00 on 8 May 2025.
Schedule : From 20:00 on 14 May 2025 to 06:00 on 15 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 18.63 miles from Melton Mowbray.

Location: southbound between the A46 and the junction with the A52 .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 1 May 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 19 miles from Melton Mowbray.

Location: northbound between the A607 and the junction with the A52 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 9 May 2025 to 06:00 on 10 May 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 12 May 2025 to 16 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 12.89 miles from Melton Mowbray.

Location: southbound between the M1 and junction J14 .
Due to: Roadworks.
Period : expect disruption until 06:00 on 1 May 2025.
Lanes Closed : All lanes are closed.
Nearest town: 17.93 miles from Melton Mowbray.

Location: southbound between the junctions with the A6 and the A42 .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 1 May 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 18.04 miles from Melton Mowbray.

Location: southbound at junction J23A (Tamworth) .
Lane Closures : Lanes 1 and 2 are closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 1 May 2025.
Lanes Closed : There are two of three lanes closed.
Nearest town: 17.97 miles from Melton Mowbray.

Location: southbound between junctions J24 (E.
Mids Airport) and J23A (Tamworth) .
Lane Closures : Lanes 1 and 2 are closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 1 May 2025.
Lanes Closed : There are two of four lanes closed.
Nearest town: 17.92 miles from Melton Mowbray.

Location: southbound entry slip at junction J23A (Tamworth) .
Due to: Roadworks.
Period : expect disruption until 06:00 on 1 May 2025.
Lanes Closed : All lanes are closed.
Nearest town: 17.93 miles from Melton Mowbray.

Location: southbound exit slip at junction J23A (Tamworth) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 30 April 2025 to 3 May 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 6 May 2025 to 10 May 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 12 May 2025 to 17 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 17.97 miles from Melton Mowbray.

Location: The junction of the A42 and the M1 J23A .
Due to: Roadworks.
Period : expect disruption until 06:00 on 1 May 2025.
Lanes Closed : All lanes are closed.
Nearest town: 18.03 miles from Melton Mowbray.

Location: eastbound between the junctions with the A6464 and the A6514 .
Due to: Roadworks.
Period : expect disruption until 06:00 on 1 May 2025.
Nearest town: 17.88 miles from Melton Mowbray.

Location: eastbound between the junctions with the A6464 and the A6514 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 15 May 2025 to 06:00 on 16 May 2025.
Schedule : From 20:00 on 16 May 2025 to 06:00 on 19 May 2025.
Nearest town: 18.29 miles from Melton Mowbray.

Location: westbound between the junctions with the A6005 and the A6514 .
Lane Closures : Lane three is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 1 May 2025.
Lanes Closed : There is one of three lanes closed.
Nearest town: 17.48 miles from Melton Mowbray.

Location: eastbound between the junctions with the A6464 and the A6514 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 05:59 on 18 April 2026 to 06:00 on 18 April 2026.
Nearest town: 17.88 miles from Melton Mowbray.

Location: eastbound between the junctions with the A6464 and the A6514 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 05:59 on 18 April 2026 to 06:00 on 18 April 2026.
Nearest town: 17.88 miles from Melton Mowbray.

Location: eastbound between the junctions with the A6464 and the A6514 .
Due to: Roadworks.
Period : expect disruption until 06:00 on 1 May 2025.
Nearest town: 17.88 miles from Melton Mowbray.

Location: eastbound between the junctions with the A6464 and the A6514 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 15 May 2025 to 06:00 on 16 May 2025.
Schedule : From 20:00 on 16 May 2025 to 06:00 on 19 May 2025.
Nearest town: 18.29 miles from Melton Mowbray.

Location: westbound exit slip to the A6514 .
Lane Closures : Lane two is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 1 May 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 17.58 miles from Melton Mowbray.

Location: westbound between the junctions with the A6514 and the A6464 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 05:59 on 18 April 2026 to 06:00 on 18 April 2026.
Nearest town: 17.79 miles from Melton Mowbray.

Location: westbound between the junctions with the A6514 and the A6464 .
Due to: Roadworks.
Period : expect disruption until 06:00 on 1 May 2025.
Nearest town: 17.79 miles from Melton Mowbray.

Location: westbound between the junctions with the A6514 and the A6464 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 15 May 2025 to 06:00 on 16 May 2025.
Schedule : From 20:00 on 16 May 2025 to 06:00 on 19 May 2025.
Nearest town: 17.79 miles from Melton Mowbray.

Location: westbound between the junctions with the A6011 and the A606 .
Due to: Roadworks.
Period : expect disruption until 06:00 on 1 May 2025.
Nearest town: 13.48 miles from Melton Mowbray.

Location: eastbound between the junctions with the A606 and the A6011 .
Due to: Roadworks.
Period : expect disruption until 06:00 on 1 May 2025.
Nearest town: 13.52 miles from Melton Mowbray.

Location: northbound between the M1 and the junction with the A52 .
Due to: Road repairs.
Period : expect disruption until 05:00 on 1 May 2025.
Nearest town: 16 miles from Melton Mowbray.

Location: northbound between the junctions with the M1 and the A52 .
Due to: Road repairs.
Period : expect disruption until 05:00 on 1 May 2025.
Nearest town: 15.99 miles from Melton Mowbray.

Location: southbound between the junctions with the A52 and the M1 .
Due to: Road repairs.
Period : expect disruption until 05:00 on 1 May 2025.
Nearest town: 15.98 miles from Melton Mowbray.

Location: southbound between the junctions with the A52 and the M1 .
Due to: Road repairs.
Period : expect disruption until 05:00 on 1 May 2025.
Nearest town: 15.98 miles from Melton Mowbray.

Location: northbound between the A151 and the junction with the A607 .
Lane Closures : Lane one will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 14 May 2025 to 06:00 on 15 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 11.65 miles from Melton Mowbray.

Location: southbound between the junctions with the A607 Syston North and the A607 Syston South.
Lane Closures : Lane one will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 20:00 on 2 May 2025 to 05:00 on 3 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 10 miles from Melton Mowbray.

Location: southbound between the A607 Syston South and the junction with the A5630 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 05:00 on 11 May 2025 to 11:00 on 11 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 11 miles from Melton Mowbray.