Location: eastbound between junctions J16 (Swindon) and J14 (Hungerford) .
Due to: Roadworks scheme.
Period : from 21:00 on 15 March 2025 to 06:00 on 17 April 2025.
Nearest town: 15.42 miles from Kemble Wick.

Location: northbound between the A436 and the junction with the A46 .
Due to: Roadworks scheme.
Period : from 09:14 on 3 February 2025 to 06:00 on 31 October 2025.
Nearest town: 13.41 miles from Kemble Wick.

Location: northbound between the junctions with the A436 and the A46 .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 31 October 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 13.47 miles from Kemble Wick.

Location: northbound between the junctions with the A436 and the A46 .
Due to: Roadworks.
Period : expect disruption until 06:00 on 31 October 2025.
Nearest town: 13.41 miles from Kemble Wick.

Location: southbound between the junctions with the A46 and the A436 .
Due to: Roadworks.
Period : expect disruption until 06:00 on 31 October 2025.
Nearest town: 13.44 miles from Kemble Wick.

Location: eastbound between junctions J17 (Chippenham) and J16 (Swindon) .
Lane Closures : The hard shoulder is closed.
Due to: Emergency barrier repairs.
Period : expect disruption until 00:00 on 30 July 2025.
Nearest town: 8.27 miles from Kemble Wick.

Location: northbound between the A419 and the junction with the A436 .
Due to: Roadworks scheme.
Period : from 17:01 on 2 July 2024 to 06:00 on 17 April 2026.
Nearest town: 11.6 miles from Kemble Wick.

Location: northbound between the junctions with the A419 and the A436 .
Due to: Roadworks.
Period : expect disruption until 06:00 on 17 April 2026.
Nearest town: 11.61 miles from Kemble Wick.

Location: northbound between the junctions with the A419 and the A436 .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 17 April 2026.
Lanes Closed : There is one of two lanes closed.
Nearest town: 11.6 miles from Kemble Wick.

Location: southbound between the A436 and the junction with the A419 .
Due to: Roadworks.
Period : expect disruption until 06:00 on 17 April 2026.
Nearest town: 11.67 miles from Kemble Wick.

Location: southbound between the A436 and the junction with the A419 .
Due to: Roadworks scheme.
Period : from 17:01 on 2 July 2024 to 06:00 on 17 April 2026.
Nearest town: 11.67 miles from Kemble Wick.

Location: southbound between the junctions with the A436 and the A419 .
Due to: Roadworks.
Period : from 17:01 on 2 July 2024 to 06:00 on 17 April 2026.
Nearest town: 11.61 miles from Kemble Wick.

Location: eastbound between junctions J16 (Swindon) and J15 (Swindon) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 21 March 2025 to 06:00 on 22 March 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 12.03 miles from Kemble Wick.

Location: westbound entry slip at junction J15 (Swindon) .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 21 March 2025 to 06:00 on 22 March 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 15.77 miles from Kemble Wick.

Location: westbound between junctions J15 (Swindon) and J16 (Swindon) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 21:00 on 21 March 2025 to 06:00 on 22 March 2025.
Nearest town: 16.01 miles from Kemble Wick.

Location: westbound between junctions J15 (Swindon) and J16 (Swindon) .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 21 March 2025 to 06:00 on 22 March 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 16.01 miles from Kemble Wick.

Location: westbound between junctions J16 (Swindon) and J18 (Bath) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 21:00 on 21 March 2025 to 06:00 on 24 March 2025.
Nearest town: 10.09 miles from Kemble Wick.

Location: westbound between junctions J17 (Chippenham) and J18 (Bath) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:45 on 21 March 2025 to 22:00 on 22 March 2025.
Schedule : From 21:45 on 23 March 2025 to 06:00 on 24 March 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 10.24 miles from Kemble Wick.

Location: westbound between junctions J16 (Swindon) and J17 (Chippenham) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 21 March 2025 to 06:00 on 22 March 2025.
Schedule : From 21:00 on 23 March 2025 to 06:00 on 24 March 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 10.09 miles from Kemble Wick.

Location: westbound between junctions J17 (Chippenham) and J18 (Bath) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 21 March 2025 to 06:00 on 24 March 2025.
Nearest town: 16.39 miles from Kemble Wick.

Location: westbound between junctions J17 (Chippenham) and J18 (Bath) .
Lane Closures : Lane three will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:45 on 21 March 2025 to 06:00 on 24 March 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 16.39 miles from Kemble Wick.

Location: westbound between junctions J17 (Chippenham) and J18 (Bath) .
Lane Closures : Lane three will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 21 March 2025 to 20:45 on 21 March 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 16.39 miles from Kemble Wick.

Location: westbound between junctions J17 (Chippenham) and J18 (Bath) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 20 March 2025 to 06:00 on 21 March 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 10.36 miles from Kemble Wick.

Location: eastbound between junctions J18 (Bath) and J17 (Chippenham) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 20 March 2025 to 06:00 on 21 March 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 11.84 miles from Kemble Wick.

Location: southbound between junctions J12 (Gloucester) and J13 (Stroud) .
Lane Closures : Lane three will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 17 March 2025 to 06:00 on 18 March 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 14.58 miles from Kemble Wick.

Location: northbound between junctions J13 (Stroud) and J12 (Gloucester) .
Lane Closures : Lane three will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 17 March 2025 to 06:00 on 18 March 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 14.51 miles from Kemble Wick.

Location: eastbound between junctions J17 (Chippenham) and J16 (Swindon) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 08:00 on 21 March 2025 to 18:00 on 21 March 2025.
Nearest town: 9.66 miles from Kemble Wick.

Location: westbound between junctions J15 (Swindon) and J16 (Swindon) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 08:00 on 21 March 2025 to 18:00 on 21 March 2025.
Nearest town: 11.07 miles from Kemble Wick.

Location: southbound between junctions J12 (Gloucester) and J13 (Stroud) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 19 March 2025 to 06:00 on 20 March 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 14.45 miles from Kemble Wick.

Location: southbound between the A417 and the junction with the A361 .
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 20:00 on 20 March 2025 to 06:00 on 21 March 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 5.82 miles from Kemble Wick.

Location: westbound between junctions J14 (Hungerford) and J15 (Swindon) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 06:00 and 20:00 from 25 March 2025 to 27 March 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 19.07 miles from Kemble Wick.

Location: westbound between junctions J14 (Hungerford) and J15 (Swindon) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 06:00 on 20 March 2025 to 20:00 on 20 March 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 19.6 miles from Kemble Wick.

Location: westbound between junctions J14 (Hungerford) and J15 (Swindon) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 21 March 2025 to 23 March 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 19.07 miles from Kemble Wick.

Location: westbound between junctions J14 (Hungerford) and J15 (Swindon) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 06:00 on 19 March 2025 to 20:00 on 19 March 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 19.91 miles from Kemble Wick.

Location: westbound between junctions J14 (Hungerford) and J15 (Swindon) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 06:00 on 18 March 2025 to 20:00 on 18 March 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 19.72 miles from Kemble Wick.

Location: eastbound entry slip at junction J15 (Swindon) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 16 March 2025 to 06:00 on 17 March 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 7 April 2025 to 12 April 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 14 April 2025 to 17 April 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 15.79 miles from Kemble Wick.

Location: westbound exit slip at junction J15 (Swindon) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 17 March 2025 to 21 March 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 24 March 2025 to 28 March 2025.
Schedule : From 21:00 on 31 March 2025 to 06:00 on 1 April 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 3 April 2025 to 5 April 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 16.01 miles from Kemble Wick.

Location: eastbound between junctions J16 (Swindon) and J14 (Hungerford) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 16 March 2025 to 06:00 on 17 March 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 7 April 2025 to 12 April 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 14 April 2025 to 17 April 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 15.42 miles from Kemble Wick.

Location: eastbound at junction J16 (Swindon) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 09:00 on 19 March 2025 to 16:00 on 19 March 2025.
Nearest town: 10.44 miles from Kemble Wick.

Location: westbound between junctions J17 (Chippenham) and J18 (Bath) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 09:00 on 19 March 2025 to 16:00 on 19 March 2025.
Nearest town: 12.49 miles from Kemble Wick.

Location: southbound between junctions J11A (Gloucester) and J12 (Gloucester) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 18 March 2025 to 06:00 on 19 March 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 14.38 miles from Kemble Wick.

Location: westbound entry slip at junction J15 (Swindon) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 09:00 on 20 March 2025 to 16:00 on 20 March 2025.
Nearest town: 15.77 miles from Kemble Wick.

Location: northbound exit slip to the A420 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 09:00 on 20 March 2025 to 15:00 on 20 March 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 14.03 miles from Kemble Wick.

Location: northbound between junctions J13 (Stroud) and J12 (Gloucester) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 19 March 2025 to 06:00 on 20 March 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 14.48 miles from Kemble Wick.

Location: northbound between junctions J12 (Gloucester) and J11A (Gloucester) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 19 March 2025 to 21 March 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 14.9 miles from Kemble Wick.

Location: northbound entry slip at junction J11A (Gloucester) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 19 March 2025 to 21 March 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 15.33 miles from Kemble Wick.

Location: southbound entry slip at junction J11 (Cheltenham) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 19 March 2025 to 21 March 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 17.03 miles from Kemble Wick.

Location: northbound between junctions J11A (Gloucester) and J11 (Cheltenham) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 19 March 2025 to 21 March 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 15.25 miles from Kemble Wick.

Location: southbound between junctions J10 (Cheltenham) and J11 (Cheltenham) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 19 March 2025 to 21 March 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 17.96 miles from Kemble Wick.

Location: southbound between junctions J11 (Cheltenham) and J11A (Gloucester) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 19 March 2025 to 21 March 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 17.36 miles from Kemble Wick.

Location: northbound at the junction with the M5 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 19 March 2025 to 21 March 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 15.1 miles from Kemble Wick.

Location: northbound between the junctions with the A46 and the M5 .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 19 March 2025 to 21 March 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 14.75 miles from Kemble Wick.

Location: northbound exit slip at junction J11 (Cheltenham) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 19 March 2025 to 21 March 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 16.89 miles from Kemble Wick.

Location: southbound exit slip at junction J11A (Gloucester) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 19 March 2025 to 21 March 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 15.5 miles from Kemble Wick.

Location: eastbound between junctions J18 (Bath) and J17 (Chippenham) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 08:00 on 19 March 2025 to 18:00 on 19 March 2025.
Nearest town: 10.96 miles from Kemble Wick.

Location: northbound between junctions J13 (Stroud) and J12 (Gloucester) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 18 March 2025 to 06:00 on 19 March 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 14.48 miles from Kemble Wick.

Location: southbound exit slip at junction J10 (Cheltenham) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 18 March 2025 to 06:00 on 19 March 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.69 miles from Kemble Wick.

Location: northbound at junction J12 (Gloucester) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 09:00 on 17 March 2025 to 15:00 on 17 March 2025.
Nearest town: 14.9 miles from Kemble Wick.

Location: southbound between the M4 and the junction with the A420 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 17 March 2025 to 06:00 on 18 March 2025.
Nearest town: 17.49 miles from Kemble Wick.

Location: westbound between junctions J16 (Swindon) and J17 (Chippenham) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 08:00 on 18 March 2025 to 18:00 on 18 March 2025.
Nearest town: 10.05 miles from Kemble Wick.

Location: eastbound exit slip to the M5 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 17 March 2025 to 06:00 on 18 March 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 17.12 miles from Kemble Wick.

Location: southbound exit slip at junction J11 (Cheltenham) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 17 March 2025 to 06:00 on 18 March 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 17.22 miles from Kemble Wick.

Location: northbound exit slip at junction J11 (Cheltenham) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 17 March 2025 to 06:00 on 18 March 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 16.97 miles from Kemble Wick.

Location: eastbound between junctions J17 (Chippenham) and J16 (Swindon) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 17 March 2025 to 19 March 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 8.02 miles from Kemble Wick.

Location: westbound between junctions J16 (Swindon) and J17 (Chippenham) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 17 March 2025 to 19 March 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 9.43 miles from Kemble Wick.

Location: southbound between the junctions with the M4 and the A420 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 17 March 2025 to 06:00 on 18 March 2025.
Nearest town: 17.97 miles from Kemble Wick.

Location: northbound between the junctions with the A420 and the M4 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 17 March 2025 to 06:00 on 18 March 2025.
Nearest town: 19.08 miles from Kemble Wick.

Location: northbound between junctions J10 (Cheltenham) and J9 (Tewkesbury) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 17 March 2025 to 06:00 on 18 March 2025.
Nearest town: 19.62 miles from Kemble Wick.

Location: northbound between junctions J11 (Cheltenham) and J9 (Tewkesbury) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 17 March 2025 to 06:00 on 18 March 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 18.84 miles from Kemble Wick.

Location: northbound entry slip at junction J10 (Cheltenham) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 17 March 2025 to 06:00 on 18 March 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.62 miles from Kemble Wick.

Location: eastbound between junctions J16 (Swindon) and J15 (Swindon) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 08:00 on 17 March 2025 to 18:00 on 17 March 2025.
Nearest town: 14.82 miles from Kemble Wick.

Location: eastbound between junctions J16 (Swindon) and J15 (Swindon) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 09:00 and 16:00 from 17 March 2025 to 19 March 2025.
Nearest town: 12.95 miles from Kemble Wick.

Location: westbound between junctions J17 (Chippenham) and J18 (Bath) .
Lane Closures : Lane three will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 17 March 2025 to 22 March 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 24 March 2025 to 29 March 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 31 March 2025 to 5 April 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 7 April 2025 to 12 April 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 14.81 miles from Kemble Wick.

Location: eastbound between junctions J18 (Bath) and J17 (Chippenham) .
Lane Closures : Lane three will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 17 March 2025 to 22 March 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 24 March 2025 to 29 March 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 31 March 2025 to 5 April 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 7 April 2025 to 12 April 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 15.11 miles from Kemble Wick.