Green Street (All Directions) at the junction of Jute Lane - The level crossing barriers are now working.
Fault now repaired.
Nearest town: 18.77 miles from Easthall.
Aldermans Hill at the junction with Green Lanes - There will be temporary signals in operation due to a crane in the area.
No restrictions in place.
Nearest town: 19.68 miles from Easthall.
Southgate Circus junction with Chase Side(All Directions) There is a collision at this location.
Traffic is flowing well.
Nearest town: 18.43 miles from Easthall.
Watling Avenue (All Directions) at the junction of Orange Hill Road .
Traffic signals have been restored.
Traffic signals have been restored.
Nearest town: 19.41 miles from Easthall.
Location: The A1M southbound at junction J8 .
Due to: Congestion.
Normal traffic conditions are expected between 11:00 and 11:15 on 26 December 2024.
Nearest town: 4.12 miles from Easthall.
Location: northbound entry slip at junction J12 (Flitwick) .
Due to: Emergency barrier repairs.
Period : from 20:52 on 25 December 2024 to 06:00 on 28 December 2024.
Lanes Closed : There are lane closures.
Nearest town: 11.76 miles from Easthall.
Location: northbound at junction J12 (Flitwick) .
Lane Closures : Lane one is closed.
Due to: Emergency barrier repairs.
Period : from 20:56 on 25 December 2024 to 06:00 on 28 December 2024.
Lanes Closed : There is one of four lanes closed.
Nearest town: 11.66 miles from Easthall.
Location: The A1M northbound between junctions J8 and J9 .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 12:00 on 8 December 2025.
Nearest town: 5.4 miles from Easthall.
Location: The A1M northbound between junctions J8 and J9 .
Lane Closures : The hard shoulder is closed.
Due to: Emergency barrier repairs.
Period : expect disruption until 00:00 on 31 December 2024.
Nearest town: 5.53 miles from Easthall.
Location: clockwise between junctions J26 (Waltham Abbey) and J27 (Stansted) .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 31 March 2025.
Lanes Closed : There is one of four lanes closed.
Nearest town: 19.92 miles from Easthall.
Location: northbound between the junctions with the A4280 and the A1 .
Due to: Roadworks scheme.
Period : from 11:42 on 20 August 2024 to 00:01 on 10 April 2025.
Nearest town: 18.8 miles from Easthall.
Location: clockwise at junction J23 (Hatfield) .
Lane Closures : The hard shoulder and lane 1 are closed.
Due to: Road repairs.
Period : expect disruption until 05:00 on 31 March 2025.
Lanes Closed : There is one of three lanes closed.
Nearest town: 13.6 miles from Easthall.
Location: southbound between junctions J12 (Flitwick) and J11A .
Due to: Roadworks scheme.
Period : from 22:00 on 17 December 2024 to 05:00 on 22 March 2025.
Nearest town: 9.89 miles from Easthall.
Location: anticlockwise between junctions J25 (Enfield) and J23 (Hatfield) .
Lane Closures : Lane one is closed.
Due to: Road repairs.
Period : expect disruption until 05:00 on 31 March 2025.
Lanes Closed : There is one of four lanes closed.
Nearest town: 16.6 miles from Easthall.
Location: anticlockwise exit slip at junction J24 (Potters Bar) .
Lane Closures : Lane one is closed.
Due to: Road repairs.
Period : expect disruption until 05:00 on 31 March 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 14.31 miles from Easthall.
Location: anticlockwise exit slip at junction J23 (Hatfield) .
Lane Closures : Lane one is closed.
Due to: Road repairs.
Period : expect disruption until 05:00 on 31 March 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 13.93 miles from Easthall.
Location: anticlockwise at junction J23 (Hatfield) .
Lane Closures : The hard shoulder and lane 1 are closed.
Due to: Road repairs.
Period : expect disruption until 05:00 on 31 March 2025.
Lanes Closed : There is one of three lanes closed.
Nearest town: 13.93 miles from Easthall.
Location: clockwise between junctions J23 (Hatfield) and J25 (Enfield) .
Lane Closures : Lane one is closed.
Due to: Road repairs.
Period : expect disruption until 05:00 on 31 March 2025.
Lanes Closed : There is one of four lanes closed.
Nearest town: 13.99 miles from Easthall.
Location: clockwise entry slip at junction J23 (Hatfield) .
Lane Closures : The hard shoulder and lane 1 are closed.
Due to: Road repairs.
Period : expect disruption until 05:00 on 31 March 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 13.79 miles from Easthall.
Location: clockwise exit slip at junction J24 (Potters Bar) .
Lane Closures : Lane one is closed.
Due to: Road repairs.
Period : expect disruption until 05:00 on 31 March 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 14.35 miles from Easthall.
Location: northbound between junctions J8 (Hemel Hstead) and J14 (Milton Keynes) .
Due to: Roadworks scheme.
Period : from 22:00 on 5 December 2024 to 05:00 on 30 September 2025.
Nearest town: 6.79 miles from Easthall.
Location: southbound at the junction with the M1 .
Lane Closures : Lane three is closed.
Due to: Road repairs.
Period : expect disruption until 23:59 on 1 January 2025.
Lanes Closed : There is one of three lanes closed.
Nearest town: 9.72 miles from Easthall.
Location: southbound exit slip at junction J11A .
Due to: Road repairs.
Period : expect disruption until 23:59 on 1 January 2025.
Nearest town: 9.7 miles from Easthall.
Location: northbound.
Due to: Roadworks scheme.
Period : from 05:00 on 28 April 2024 to 00:01 on 10 April 2025.
Nearest town: 15.8 miles from Easthall.
Location: northbound between the A5135 and the junction with the M25 .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 22:00 on 30 December 2024 to 05:00 on 31 December 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 15.81 miles from Easthall.
Location: southbound between the junctions with the M25 and the A5135 .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 22:00 on 30 December 2024 to 05:00 on 31 December 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 15 miles from Easthall.
Location: northbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 06:00 on 11 January 2025 to 20:00 on 12 January 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.88 miles from Easthall.
Location: northbound between the junctions with the A603 and the A421 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 06:00 on 11 January 2025 to 20:00 on 12 January 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 18.39 miles from Easthall.
Location: northbound between the junctions with the A603 and the A421 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 06:00 on 11 January 2025 to 20:00 on 12 January 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.82 miles from Easthall.
Location: southbound between junctions J10 (Luton Airport) and J8 (Hemel Hstead) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 10 February 2025 to 16 February 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 6.74 miles from Easthall.
Location: southbound exit slip at junction J10 (Luton Airport) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 10 February 2025 to 16 February 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 6.8 miles from Easthall.
Location: southbound exit slip at junction J12 (Flitwick) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 4 February 2025 to 8 February 2025.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 18 February 2025 to 22 February 2025.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 17 March 2025 to 22 March 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 11.95 miles from Easthall.
Location: southbound between junctions J13 (Milton Keynes) and J12 (Flitwick) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 4 February 2025 to 8 February 2025.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 18 February 2025 to 22 February 2025.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 17 March 2025 to 22 March 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 17.2 miles from Easthall.
Location: southbound at junction J10 (Luton Airport) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 13 January 2025 to 18 January 2025.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 20 January 2025 to 25 January 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 6.8 miles from Easthall.
Location: southbound between junctions J11A and J10 (Luton Airport) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 10 February 2025 to 16 February 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 9.89 miles from Easthall.
Location: southbound between junctions J11 (Luton) and J10 (Luton Airport) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 13 January 2025 to 18 January 2025.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 20 January 2025 to 25 January 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 7.97 miles from Easthall.
Location: southbound between junctions J11 (Luton) and J10 (Luton Airport) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 8 January 2025 to 10 January 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 7.97 miles from Easthall.
Location: southbound between junctions J14 (Milton Keynes) and J13 (Milton Keynes) .
Lane Closures : Lanes 2, 3 and 4 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 4 February 2025 to 8 February 2025.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 18 February 2025 to 22 February 2025.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 17 March 2025 to 22 March 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 18.86 miles from Easthall.
Location: southbound entry slip at junction J11 (Luton) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 10 February 2025 to 16 February 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 8.41 miles from Easthall.
Location: southbound exit slip at junction J11 (Luton) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 10 February 2025 to 16 February 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 8.47 miles from Easthall.
Location: southbound exit slip at junction J9 (Dunstable A5) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 10 February 2025 to 16 February 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 7.46 miles from Easthall.
Location: southbound between junctions J12 (Flitwick) and J11A .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 10 February 2025 to 16 February 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 10.31 miles from Easthall.
Location: southbound entry slip at junction J11A .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 10 February 2025 to 16 February 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 9.6 miles from Easthall.
Location: southbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 4 February 2025 to 8 February 2025.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 18 February 2025 to 22 February 2025.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 17 March 2025 to 22 March 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 10.7 miles from Easthall.
Location: southbound exit slip at junction J11A .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 4 February 2025 to 8 February 2025.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 18 February 2025 to 22 February 2025.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 17 March 2025 to 22 March 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 9.89 miles from Easthall.
Location: southbound between junctions J12 (Flitwick) and J11A .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 4 February 2025 to 8 February 2025.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 18 February 2025 to 22 February 2025.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 17 March 2025 to 22 March 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 11.6 miles from Easthall.
Location: southbound exit slip at Toddington Services.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 4 February 2025 to 8 February 2025.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 18 February 2025 to 22 February 2025.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 17 March 2025 to 22 March 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 10.85 miles from Easthall.
Location: southbound at junction J13 (Milton Keynes) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 4 February 2025 to 8 February 2025.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 18 February 2025 to 22 February 2025.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 17 March 2025 to 22 March 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 17.58 miles from Easthall.
Location: northbound between junctions J11A and J12 (Flitwick) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 29 September 2025 to 05:00 on 30 September 2025.
Nearest town: 10.62 miles from Easthall.
Location: northbound between junctions J12 (Flitwick) and J13 (Milton Keynes) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 05:00 on 1 February 2025 to 22:00 on 29 September 2025.
Nearest town: 12.03 miles from Easthall.
Location: northbound between junctions J11A and J12 (Flitwick) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 05:00 on 1 February 2025 to 22:00 on 29 September 2025.
Nearest town: 10.62 miles from Easthall.
Location: northbound between junctions J8 (Hemel Hstead) and J9 (Dunstable A5) .
Lane Closures : Lanes 1, 2, 3 and 4 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 27 January 2025 to 1 February 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 7.76 miles from Easthall.
Location: northbound entry slip at junction J11 (Luton) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 27 January 2025 to 1 February 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 8.47 miles from Easthall.
Location: northbound between junctions J8 (Hemel Hstead) and J9 (Dunstable A5) .
Lane Closures : Lanes 2, 3 and 4 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 27 January 2025 to 1 February 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 8.15 miles from Easthall.
Location: northbound at junction J11 (Luton) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 05:00 on 1 February 2025 to 22:00 on 29 September 2025.
Nearest town: 8.42 miles from Easthall.
Location: northbound at junction J11 (Luton) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 29 September 2025 to 05:00 on 30 September 2025.
Nearest town: 8.42 miles from Easthall.
Location: northbound between junctions J10 (Luton Airport) and J11 (Luton) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 29 September 2025 to 05:00 on 30 September 2025.
Nearest town: 6.98 miles from Easthall.
Location: northbound between junctions J10 (Luton Airport) and J11 (Luton) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 05:00 on 1 February 2025 to 22:00 on 29 September 2025.
Nearest town: 6.98 miles from Easthall.
Location: northbound between junctions J13 (Milton Keynes) and J14 (Milton Keynes) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 29 September 2025 to 05:00 on 30 September 2025.
Nearest town: 17.59 miles from Easthall.
Location: northbound between junctions J12 (Flitwick) and J13 (Milton Keynes) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 29 September 2025 to 05:00 on 30 September 2025.
Nearest town: 12.03 miles from Easthall.
Location: northbound between junctions J9 (Dunstable A5) and J10 (Luton Airport) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 27 January 2025 to 1 February 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 7.64 miles from Easthall.
Location: northbound exit slip at junction J10 (Luton Airport) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 27 January 2025 to 1 February 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 6.79 miles from Easthall.
Location: northbound at junction J10 (Luton Airport) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 29 September 2025 to 05:00 on 30 September 2025.
Nearest town: 6.79 miles from Easthall.
Location: northbound at junction J10 (Luton Airport) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 05:00 on 1 February 2025 to 22:00 on 29 September 2025.
Nearest town: 6.78 miles from Easthall.
Location: northbound exit slip at junction J11 (Luton) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 27 January 2025 to 1 February 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 8.42 miles from Easthall.
Location: northbound exit slip at junction J11A .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 27 January 2025 to 1 February 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 9.51 miles from Easthall.
Location: northbound between junctions J10 (Luton Airport) and J12 (Flitwick) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 27 January 2025 to 1 February 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 6.81 miles from Easthall.
Location: northbound between junctions J11A and J12 (Flitwick) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 29 September 2025 to 05:00 on 30 September 2025.
Nearest town: 9.9 miles from Easthall.
Location: northbound at junction J11A .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 29 September 2025 to 05:00 on 30 September 2025.
Nearest town: 9.51 miles from Easthall.
Location: northbound between junctions J11 (Luton) and J11A .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 29 September 2025 to 05:00 on 30 September 2025.
Nearest town: 8.54 miles from Easthall.
Location: northbound between junctions J11A and J12 (Flitwick) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 05:00 on 1 February 2025 to 22:00 on 29 September 2025.
Nearest town: 9.9 miles from Easthall.
Location: northbound at junction J11A .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 05:00 on 1 February 2025 to 22:00 on 29 September 2025.
Nearest town: 9.51 miles from Easthall.
Location: northbound between junctions J11 (Luton) and J11A .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 05:00 on 1 February 2025 to 22:00 on 29 September 2025.
Nearest town: 8.54 miles from Easthall.