There are no current incidents in this location.

Roadworks

ROAD WORKS
Location: The A34 northbound at the junction with the M4 .
Reason: Barrier repairs are planned.
Status: Pending.
Schedule: From 21:00 on 4 Nov 2024 to 06:00 on 5 Nov 2024.
Lanes Closed: All lanes will be closed.
Nearest town: 8.12 miles from Woodway.
ROAD WORKS
Location: The M40 southbound between junctions J8A (Thame) and J8 (Oxford) .
Lane closures: The hard shoulder is closed.
Reason: Barrier repairs.
Status: Currently Active.
Period: expect disruption until 23:00 on 16 Nov 2024.
Nearest town: 14.17 miles from Woodway.
ROAD WORKS
Location: The M40 northbound between junctions J4 (High Wycombe) and J5 (High Wycombe) .
Lane closures: The hard shoulder is closed.
Reason: Barrier repairs.
Status: Currently Active.
Period: expect disruption until 23:59 on 17 Nov 2024.
Nearest town: 18.95 miles from Woodway.
ROAD WORKS
Location: The M40 northbound between junctions J8A (Thame) and J9 (Bicester) .
Lane closures: Lanes 2 and 3 will be closed.
Reason: Barrier repairs are planned.
Status: Pending.
Schedule: From 22:15 on 4 Nov 2024 to 06:00 on 5 Nov 2024.
Lanes Closed: There will be two of three lanes closed.
Nearest town: 19.9 miles from Woodway.
ROAD WORKS
Location: The M40 southbound between junctions J5 (High Wycombe) and J4 (High Wycombe) .
Lane closures: Lanes 1, 2 and 3 will be closed.
Reason: Road repairs are planned.
Status: Pending.
Schedule: Expect disruption everyday between 22:00 and 05:30 from 4 Nov 2024 to 9 Nov 2024.
Lanes Closed: All lanes will be closed.
Nearest town: 15.72 miles from Woodway.
ROAD WORKS
Location: The A404 southbound entry slip from the A4130 .
Reason: Roadworks are planned.
Status: Pending.
Schedule: From 21:00 on 4 Nov 2024 to 06:00 on 5 Nov 2024.
Lanes Closed: All lanes will be closed.
Nearest town: 19.46 miles from Woodway.
ROAD WORKS
Location: The M4 westbound between junctions J10 (Reading) and J12 (Reading) .
Reason: Roadworks scheme.
Status: Currently Active.
Period: from 20:02 on 25 Oct 2024 to 06:00 on 26 Nov 2024.
Nearest town: 16.46 miles from Woodway.
ROAD WORKS
Location: The M4 eastbound between junctions J12 (Reading) and J10 (Reading) .
Reason: Roadworks scheme.
Status: Currently Active.
Period: from 14:12 on 10 Sep 2024 to 06:00 on 31 Mar 2025.
Nearest town: 10.88 miles from Woodway.
ROAD WORKS
Location: The M4 eastbound at junction J10 (Reading) .
Lane closures: Lane one is closed.
Reason: Roadworks.
Status: Currently Active.
Period: expect disruption until 06:00 on 31 Mar 2025.
Lanes Closed: There is one of three lanes closed.
Nearest town: 18.29 miles from Woodway.
ROAD WORKS
Location: The M4 eastbound at junction J12 (Reading) .
Lane closures: Lane one is closed.
Reason: Roadworks.
Status: Currently Active.
Period: expect disruption until 06:00 on 31 Mar 2025.
Lanes Closed: There is one of three lanes closed.
Nearest town: 10.88 miles from Woodway.
ROAD WORKS
Location: The M4 westbound at junction J12 (Reading) .
Lane closures: Lane one is closed.
Reason: Roadworks.
Status: Currently Active.
Period: expect disruption until 06:00 on 31 Mar 2025.
Lanes Closed: There is one of three lanes closed.
Nearest town: 11.04 miles from Woodway.
ROAD WORKS
Location: The M4 westbound between junctions J11 (Basingstoke) and J12 (Reading) .
Lane closures: Lane one is closed.
Reason: Roadworks.
Status: Currently Active.
Period: expect disruption until 06:00 on 31 Mar 2025.
Lanes Closed: There is one of four lanes closed.
Nearest town: 14.56 miles from Woodway.
ROAD WORKS
Location: The M4 westbound between junctions J10 (Reading) and J11 (Basingstoke) .
Lane closures: Lane one is closed.
Reason: Roadworks.
Status: Currently Active.
Period: expect disruption until 06:00 on 31 Mar 2025.
Lanes Closed: There is one of four lanes closed.
Nearest town: 18.26 miles from Woodway.
ROAD WORKS
Location: The M4 eastbound between junctions J11 (Basingstoke) and J10 (Reading) .
Lane closures: Lane one is closed.
Reason: Roadworks.
Status: Currently Active.
Period: expect disruption until 06:00 on 31 Mar 2025.
Lanes Closed: There is one of four lanes closed.
Nearest town: 15.35 miles from Woodway.
ROAD WORKS
Location: The M4 eastbound at junction J11 (Basingstoke) .
Lane closures: Lane one is closed.
Reason: Roadworks.
Status: Currently Active.
Period: expect disruption until 06:00 on 31 Mar 2025.
Lanes Closed: There is one of three lanes closed.
Nearest town: 14.76 miles from Woodway.
ROAD WORKS
Location: The M4 westbound at junction J11 (Basingstoke) .
Lane closures: Lane one is closed.
Reason: Roadworks.
Status: Currently Active.
Period: expect disruption until 06:00 on 31 Mar 2025.
Lanes Closed: There is one of three lanes closed.
Nearest town: 15.18 miles from Woodway.
ROAD WORKS
Location: The M4 eastbound between junctions J12 (Reading) and J11 (Basingstoke) .
Lane closures: Lane one is closed.
Reason: Roadworks.
Status: Currently Active.
Period: expect disruption until 06:00 on 31 Mar 2025.
Lanes Closed: There is one of four lanes closed.
Nearest town: 11.19 miles from Woodway.
ROAD WORKS
Location: The M4 westbound between junctions J11 (Basingstoke) and J12 (Reading) .
Reason: Roadworks scheme.
Status: Currently Active.
Period: from 21:00 on 31 Oct 2024 to 06:00 on 23 Nov 2024.
Nearest town: 11.01 miles from Woodway.
ROAD WORKS
Location: The M4 westbound at junction J12 (Reading) .
Lane closures: The hard shoulder is closed.
Reason: Roadworks.
Status: Currently Active.
Period: expect disruption until 06:00 on 6 Mar 2025.
Nearest town: 11.01 miles from Woodway.
ROAD WORKS
Location: The M4 westbound between junctions J10 (Reading) and J12 (Reading) .
Reason: Roadworks scheme.
Status: Currently Active.
Period: from 23:01 on 15 May 2024 to 06:00 on 31 Mar 2025.
Nearest town: 18.38 miles from Woodway.
ROAD WORKS
Location: The M40 northbound exit slip at junction J5 (High Wycombe) .
Lane closures: Lanes 1 and 2 will be closed.
Reason: Emergency barrier repairs are planned.
Status: Pending.
Schedule: From 22:15 on 9 Nov 2024 to 06:00 on 10 Nov 2024.
Lanes Closed: All lanes will be closed.
Nearest town: 15.99 miles from Woodway.
ROAD WORKS
Location: The M40 northbound between junctions J4 (High Wycombe) and J5 (High Wycombe) .
Lane closures: Lanes 1 and 2 will be closed.
Reason: Emergency barrier repairs are planned.
Status: Pending.
Schedule: From 22:15 on 9 Nov 2024 to 06:00 on 10 Nov 2024.
Lanes Closed: There will be two of three lanes closed.
Nearest town: 16.22 miles from Woodway.
ROAD WORKS
Location: The M4 eastbound between junctions J12 (Reading) and J11 (Basingstoke) .
Lane closures: Lanes 1, 2 and 3 will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 5 Nov 2024 to 9 Nov 2024.
Lanes Closed: There will be three of four lanes closed.
Nearest town: 11.57 miles from Woodway.
ROAD WORKS
Location: The M4 eastbound at junction J11 (Basingstoke) .
Lane closures: Lanes 1, 2 and 3 will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 5 Dec 2024 to 7 Dec 2024.
Schedule: From 20:00 on 9 Dec 2024 to 06:00 on 10 Dec 2024.
Lanes Closed: All lanes will be closed.
Nearest town: 14.76 miles from Woodway.
ROAD WORKS
Location: The M4 eastbound between junctions J12 (Reading) and J11 (Basingstoke) .
Lane closures: Lanes 1, 2 and 3 will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 5 Dec 2024 to 7 Dec 2024.
Schedule: From 20:00 on 9 Dec 2024 to 06:00 on 10 Dec 2024.
Lanes Closed: There will be three of four lanes closed.
Nearest town: 13.49 miles from Woodway.
ROAD WORKS
Location: The M4 eastbound between junctions J11 (Basingstoke) and J10 (Reading) .
Lane closures: Lanes 1, 2 and 3 will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: From 20:00 on 21 Nov 2024 to 06:00 on 22 Nov 2024.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 9 Dec 2024 to 11 Dec 2024.
Lanes Closed: There will be three of four lanes closed.
Nearest town: 15.76 miles from Woodway.
ROAD WORKS
Location: The M4 eastbound between junctions J11 (Basingstoke) and J10 (Reading) .
Lane closures: Lanes 1, 2 and 3 will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 28 Nov 2024 to 30 Nov 2024.
Lanes Closed: There will be three of four lanes closed.
Nearest town: 16.65 miles from Woodway.
ROAD WORKS
Location: The M4 eastbound between junctions J11 (Basingstoke) and J10 (Reading) .
Lane closures: Lanes 1, 2 and 3 will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 14 Nov 2024 to 16 Nov 2024.
Lanes Closed: There will be three of four lanes closed.
Nearest town: 15.35 miles from Woodway.
ROAD WORKS
Location: The M4 eastbound at junction J11 (Basingstoke) .
Lane closures: Lanes 1, 2 and 3 will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 14 Nov 2024 to 16 Nov 2024.
Lanes Closed: All lanes will be closed.
Nearest town: 14.76 miles from Woodway.
ROAD WORKS
Location: The M4 eastbound between junctions J12 (Reading) and J11 (Basingstoke) .
Lane closures: Lanes 1, 2 and 3 will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 14 Nov 2024 to 16 Nov 2024.
Lanes Closed: There will be three of four lanes closed.
Nearest town: 13.77 miles from Woodway.
ROAD WORKS
Location: The M4 westbound.
Reason: Roadworks are planned.
Status: Pending.
Schedule: From 21:00 on 10 Nov 2024 to 06:00 on 11 Nov 2024.
Lanes Closed: All lanes will be closed.
Nearest town: 14.7 miles from Woodway.
ROAD WORKS
Location: The M4 westbound between junctions J14 (Hungerford) and J15 (Swindon) .
Reason: Roadworks scheme is planned.
Status: Pending.
Schedule: From 21:00 on 10 Nov 2024 to 06:00 on 11 Nov 2024.
Nearest town: 12.65 miles from Woodway.
ROAD WORKS
Location: The M4 westbound exit slip at Membury Services.
Reason: Roadworks are planned.
Status: Pending.
Schedule: From 21:00 on 10 Nov 2024 to 06:00 on 11 Nov 2024.
Lanes Closed: All lanes will be closed.
Nearest town: 14.47 miles from Woodway.
ROAD WORKS
Location: The M4 westbound between junctions J14 (Hungerford) and J15 (Swindon) .
Reason: Roadworks are planned.
Status: Pending.
Schedule: From 21:00 on 10 Nov 2024 to 06:00 on 11 Nov 2024.
Lanes Closed: All lanes will be closed.
Nearest town: 12.65 miles from Woodway.
ROAD WORKS
Location: The M4 westbound at junction J14 (Hungerford) .
Lane closures: Lanes 1, 2 and 3 will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: From 21:00 on 10 Nov 2024 to 06:00 on 11 Nov 2024.
Lanes Closed: All lanes will be closed.
Nearest town: 12.45 miles from Woodway.
ROAD WORKS
Location: The M4 eastbound entry slip at junction J10 (Reading) .
Reason: Roadworks scheme is planned.
Status: Pending.
Schedule: From 21:00 on 10 Nov 2024 to 05:00 on 12 Nov 2024.
Nearest town: 18.16 miles from Woodway.
ROAD WORKS
Location: The M4 eastbound at junction J10 (Reading) .
Lane closures: Lanes 1, 2 and 3 will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 21:00 and 05:00 from 10 Nov 2024 to 12 Nov 2024.
Lanes Closed: All lanes will be closed.
Nearest town: 18.29 miles from Woodway.
ROAD WORKS
Location: The M4 eastbound entry slip at junction J10 (Reading) .
Lane closures: Lane one will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 21:00 and 05:00 from 10 Nov 2024 to 12 Nov 2024.
Lanes Closed: All lanes will be closed.
Nearest town: 18.44 miles from Woodway.
ROAD WORKS
Location: The M4 eastbound between junctions J10 (Reading) and J8 (High Wycombe) .
Lane closures: Lanes 1 and 2 will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 21:00 and 05:00 from 10 Nov 2024 to 12 Nov 2024.
Lanes Closed: All lanes will be closed.
Nearest town: 18.16 miles from Woodway.
ROAD WORKS
Location: The A34 southbound between the A343 and the junction with the A303 .
Lane closures: Lane two will be closed.
Reason: Barrier repairs are planned.
Status: Pending.
Schedule: From 20:00 on 7 Nov 2024 to 06:00 on 8 Nov 2024.
Lanes Closed: There will be one of two lanes closed.
Nearest town: 14.18 miles from Woodway.
ROAD WORKS
Location: The A34 northbound between the A303 and the junction with the A343 .
Lane closures: Lane two will be closed.
Reason: Barrier repairs are planned.
Status: Pending.
Schedule: From 20:00 on 7 Nov 2024 to 06:00 on 8 Nov 2024.
Lanes Closed: There will be one of two lanes closed.
Nearest town: 15.29 miles from Woodway.
ROAD WORKS
Location: The A34 northbound between the junctions with the A303 and the A343 .
Lane closures: Lane two will be closed.
Reason: Barrier repairs are planned.
Status: Pending.
Schedule: From 20:00 on 5 Nov 2024 to 06:00 on 6 Nov 2024.
Lanes Closed: There will be one of two lanes closed.
Nearest town: 16.72 miles from Woodway.
ROAD WORKS
Location: The A34 southbound between the A343 and the junction with the A303 .
Lane closures: Lane two will be closed.
Reason: Barrier repairs are planned.
Status: Pending.
Schedule: From 20:00 on 5 Nov 2024 to 06:00 on 6 Nov 2024.
Lanes Closed: There will be one of two lanes closed.
Nearest town: 14.79 miles from Woodway.
ROAD WORKS
Location: The M40 southbound between junctions J8A (Thame) and J6 (Thame) .
Lane closures: Lanes 2 and 3 will be closed.
Reason: Roadside drains works are planned.
Status: Pending.
Schedule: From 21:30 on 7 Nov 2024 to 06:00 on 8 Nov 2024.
Lanes Closed: There will be two of three lanes closed.
Nearest town: 14.17 miles from Woodway.
ROAD WORKS
Location: The M40 northbound between junctions J6 (Thame) and J8A (Thame) .
Lane closures: Lanes 2 and 3 will be closed.
Reason: Roadside drains works are planned.
Status: Pending.
Schedule: From 21:30 on 7 Nov 2024 to 06:00 on 8 Nov 2024.
Lanes Closed: There will be two of three lanes closed.
Nearest town: 14.64 miles from Woodway.
ROAD WORKS
Location: The A34 northbound between the junctions with the A4130 and the A415 .
Lane closures: Lane one will be closed.
Reason: Roadside drains works are planned.
Status: Pending.
Schedule: From 20:30 on 7 Nov 2024 to 06:00 on 8 Nov 2024.
Lanes Closed: There will be one of two lanes closed.
Nearest town: 5.82 miles from Woodway.
ROAD WORKS
Location: The M4 eastbound between junctions J15 (Swindon) and J14 (Hungerford) .
Reason: Roadworks scheme is planned.
Status: Pending.
Schedule: From 20:00 on 7 Nov 2024 to 06:00 on 16 Nov 2024.
Nearest town: 19.52 miles from Woodway.
ROAD WORKS
Location: The M4 eastbound between junctions J15 (Swindon) and J14 (Hungerford) .
Lane closures: Lanes 1 and 2 will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: From 20:00 on 7 Nov 2024 to 06:00 on 8 Nov 2024.
Lanes Closed: There will be two of three lanes closed.
Nearest town: 19.24 miles from Woodway.
ROAD WORKS
Location: The M4 eastbound between junctions J15 (Swindon) and J14 (Hungerford) .
Lane closures: Lanes 1 and 2 will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: From 20:00 on 8 Nov 2024 to 06:00 on 9 Nov 2024.
Lanes Closed: There will be two of three lanes closed.
Nearest town: 19.52 miles from Woodway.
ROAD WORKS
Location: The M4 eastbound between junctions J15 (Swindon) and J14 (Hungerford) .
Lane closures: Lanes 2 and 3 will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: From 20:00 on 15 Nov 2024 to 06:00 on 16 Nov 2024.
Lanes Closed: There will be two of three lanes closed.
Nearest town: 18.85 miles from Woodway.
ROAD WORKS
Location: The M4 westbound at junction J12 (Reading) .
Lane closures: Lanes 2 and 3 will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 21:00 and 06:00 from 4 Nov 2024 to 10 Nov 2024.
Schedule: Expect disruption everyday between 21:00 and 06:00 from 11 Nov 2024 to 16 Nov 2024.
Lanes Closed: There will be two of three lanes closed.
Nearest town: 11.04 miles from Woodway.
ROAD WORKS
Location: The M4 westbound between junctions J11 (Basingstoke) and J12 (Reading) .
Lane closures: Lanes 2 and 3 will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 21:00 and 06:00 from 4 Nov 2024 to 10 Nov 2024.
Schedule: Expect disruption everyday between 21:00 and 06:00 from 11 Nov 2024 to 16 Nov 2024.
Lanes Closed: There will be two of four lanes closed.
Nearest town: 12 miles from Woodway.
ROAD WORKS
Location: The M4 westbound entry slip at junction J12 (Reading) .
Reason: Roadworks are planned.
Status: Pending.
Schedule: From 21:00 on 2 Nov 2024 to 06:00 on 3 Nov 2024.
Schedule: Expect disruption everyday between 21:00 and 06:00 from 4 Nov 2024 to 10 Nov 2024.
Schedule: Expect disruption everyday between 21:00 and 06:00 from 11 Nov 2024 to 17 Nov 2024.
Schedule: Expect disruption everyday between 21:00 and 06:00 from 18 Nov 2024 to 23 Nov 2024.
Lanes Closed: All lanes will be closed.
Nearest town: 10.72 miles from Woodway.
ROAD WORKS
Location: The M4 eastbound entry slip at junction J12 (Reading) .
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 21:00 and 06:00 from 6 Jan 2025 to 12 Jan 2025.
Schedule: Expect disruption everyday between 21:00 and 06:00 from 13 Jan 2025 to 19 Jan 2025.
Schedule: Expect disruption everyday between 21:00 and 06:00 from 20 Jan 2025 to 26 Jan 2025.
Schedule: Expect disruption everyday between 21:00 and 06:00 from 27 Jan 2025 to 31 Jan 2025.
Lanes Closed: All lanes will be closed.
Nearest town: 10.79 miles from Woodway.
ROAD WORKS
Location: The A34 northbound entry slip from the A4130 .
Reason: Roadside drains works are planned.
Status: Pending.
Schedule: From 21:30 on 6 Nov 2024 to 06:00 on 7 Nov 2024.
Lanes Closed: All lanes will be closed.
Nearest town: 5.41 miles from Woodway.
ROAD WORKS
Location: The A34 northbound exit slip to the A4130 .
Reason: Roadside drains works are planned.
Status: Pending.
Schedule: From 21:30 on 6 Nov 2024 to 06:00 on 7 Nov 2024.
Lanes Closed: All lanes will be closed.
Nearest town: 5.21 miles from Woodway.
ROAD WORKS
Location: The M40 northbound between junctions J8A (Thame) and J9 (Bicester) .
Lane closures: Lanes 2 and 3 will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: From 21:30 on 6 Nov 2024 to 06:00 on 7 Nov 2024.
Lanes Closed: There will be two of three lanes closed.
Nearest town: 18.36 miles from Woodway.
ROAD WORKS
Location: The M40 southbound between junctions J8A (Thame) and J5 (High Wycombe) .
Lane closures: Lanes 2 and 3 will be closed.
Reason: Roadside drains works are planned.
Status: Pending.
Schedule: From 21:30 on 6 Nov 2024 to 06:00 on 7 Nov 2024.
Lanes Closed: There will be two of three lanes closed.
Nearest town: 14.53 miles from Woodway.
ROAD WORKS
Location: The M40 northbound between junctions J4 (High Wycombe) and J6 (Thame) .
Lane closures: Lanes 2 and 3 will be closed.
Reason: Roadside drains works are planned.
Status: Pending.
Schedule: From 21:30 on 6 Nov 2024 to 06:00 on 7 Nov 2024.
Lanes Closed: There will be two of three lanes closed.
Nearest town: 16.22 miles from Woodway.
ROAD WORKS
Location: The M40 southbound between junctions J9 (Bicester) and J8A (Thame) .
Lane closures: Lanes 2 and 3 will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: From 21:30 on 6 Nov 2024 to 06:00 on 7 Nov 2024.
Lanes Closed: There will be two of three lanes closed.
Nearest town: 19.93 miles from Woodway.
ROAD WORKS
Location: The M4 westbound entry slip at junction J10 (Reading) .
Lane closures: Lanes 1 and 2 will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 21:00 and 06:00 from 5 Nov 2024 to 7 Nov 2024.
Lanes Closed: All lanes will be closed.
Nearest town: 18.65 miles from Woodway.
ROAD WORKS
Location: The M4 westbound entry slip at junction J10 (Reading) .
Lane closures: Lane one will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 21:00 and 06:00 from 5 Nov 2024 to 7 Nov 2024.
Lanes Closed: All lanes will be closed.
Nearest town: 18.47 miles from Woodway.
ROAD WORKS
Location: The M4 westbound between junctions J13 (Newbury) and J14 (Hungerford) .
Lane closures: Lane one will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: From 20:00 on 5 Nov 2024 to 06:00 on 6 Nov 2024.
Lanes Closed: There will be one of three lanes closed.
Nearest town: 9.04 miles from Woodway.
ROAD WORKS
Location: The M4 westbound between junctions J10 (Reading) and J11 (Basingstoke) .
Reason: Roadworks scheme is planned.
Status: Pending.
Schedule: From 21:00 on 5 Nov 2024 to 06:00 on 7 Nov 2024.
Nearest town: 18.68 miles from Woodway.
ROAD WORKS
Location: The M4 westbound exit slip at junction J11 (Basingstoke) .
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 21:00 and 06:00 from 5 Nov 2024 to 7 Nov 2024.
Lanes Closed: All lanes will be closed.
Nearest town: 15.18 miles from Woodway.
ROAD WORKS
Location: The M4 westbound between junctions J10 (Reading) and J11 (Basingstoke) .
Lane closures: Lanes 1, 2 and 3 will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 21:00 and 06:00 from 5 Nov 2024 to 7 Nov 2024.
Lanes Closed: All lanes will be closed.
Nearest town: 18.68 miles from Woodway.
ROAD WORKS
Location: The M40 southbound between junctions J9 (Bicester) and J8A (Thame) .
Reason: Roadworks are planned.
Status: Pending.
Schedule: From 09:30 on 5 Nov 2024 to 15:30 on 5 Nov 2024.
Nearest town: 17.75 miles from Woodway.
ROAD WORKS
Location: The M40 southbound between junctions J6 (Thame) and J5 (High Wycombe) .
Lane closures: Lanes 2 and 3 will be closed.
Reason: Road repairs are planned.
Status: Pending.
Schedule: Expect disruption everyday between 22:00 and 05:30 from 4 Nov 2024 to 9 Nov 2024.
Lanes Closed: There will be two of three lanes closed.
Nearest town: 15.23 miles from Woodway.
ROAD WORKS
Location: The M40 southbound entry slip at junction J5 (High Wycombe) .
Lane closures: Lanes 1 and 2 will be closed.
Reason: Road repairs are planned.
Status: Pending.
Schedule: Expect disruption everyday between 22:00 and 05:30 from 4 Nov 2024 to 11 Nov 2024.
Lanes Closed: All lanes will be closed.
Nearest town: 15.82 miles from Woodway.
ROAD WORKS
Location: The M4 westbound between junctions J10 (Reading) and J11 (Basingstoke) .
Lane closures: Lanes 1, 2 and 3 will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: From 20:00 on 25 Nov 2024 to 06:00 on 26 Nov 2024.
Lanes Closed: There will be three of four lanes closed.
Nearest town: 17.56 miles from Woodway.
ROAD WORKS
Location: The M4 westbound exit slip at junction J12 (Reading) .
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 21:00 and 06:00 from 20 Nov 2024 to 22 Nov 2024.
Lanes Closed: All lanes will be closed.
Nearest town: 11.04 miles from Woodway.
ROAD WORKS
Location: The A34 northbound exit slip to the A4185 .
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 18 Nov 2024 to 23 Nov 2024.
Schedule: Expect disruption everyday between 21:00 and 06:00 from 25 Nov 2024 to 30 Nov 2024.
Lanes Closed: All lanes will be closed.
Nearest town: 2.95 miles from Woodway.
ROAD WORKS
Location: The A34 northbound exit slip to the A4185 .
Lane closures: Lane one will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 4 Nov 2024 to 9 Nov 2024.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 11 Nov 2024 to 13 Nov 2024.
Lanes Closed: There will be one of two lanes closed.
Nearest town: 2.95 miles from Woodway.
ROAD WORKS
Location: The A34 northbound entry slip from the A4185 .
Lane closures: Lane one will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 18 Nov 2024 to 23 Nov 2024.
Schedule: Expect disruption everyday between 21:00 and 06:00 from 25 Nov 2024 to 30 Nov 2024.
Lanes Closed: All lanes will be closed.
Nearest town: 3.03 miles from Woodway.
ROAD WORKS
Location: The A34 northbound between the M4 and the junction with the A4185 .
Lane closures: Lane one will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 18 Nov 2024 to 23 Nov 2024.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 25 Nov 2024 to 30 Nov 2024.
Lanes Closed: There will be one of two lanes closed.
Nearest town: 2.88 miles from Woodway.
ROAD WORKS
Location: The A34 northbound between the M4 and the junction with the A4185 .
Lane closures: Lane one will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 4 Nov 2024 to 9 Nov 2024.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 11 Nov 2024 to 13 Nov 2024.
Lanes Closed: There will be one of two lanes closed.
Nearest town: 2.88 miles from Woodway.
ROAD WORKS
Location: The M4 eastbound entry slip at junction J12 (Reading) .
Reason: Roadworks scheme is planned.
Status: Pending.
Schedule: From 21:00 on 6 Jan 2025 to 06:00 on 15 Mar 2025.
Nearest town: 10.79 miles from Woodway.
ROAD WORKS
Location: The M4 eastbound between junctions J12 (Reading) and J10 (Reading) .
Reason: Roadworks scheme is planned.
Status: Pending.
Schedule: From 20:00 on 5 Nov 2024 to 06:00 on 11 Dec 2024.
Nearest town: 13.49 miles from Woodway.

Traffic in Nearby Villages

Woodway


Let's Get Social

Get in touch with us or stay up to date with our latest news and updates.

Follow us on Facebook See Traffic Update on Twitter See our Pinterest Images View our Blog

Live Email Traffic Alerts

Get live email alerts whenever there is a traffic incident or roadworks on the on the roads you travel that may cause congestion or jams.

Sign up for free alerts

LEGAL NOTICE

Please remember that it is against the law to use your mobile phone, tablet or any electronic device without a hands-free kit whilst driving. If you're caught by the police using any device that can send or receive data whilst driving or riding a motorcyle you'll get an automatic fixed penalty notice, 6 points on your licence and a fine of £200. A court could also disqualify you from driving.

Elsewhere on the web:

National Highways TrafficNational Highways England

Official source of traffic updates.

Transport for LondonTransport for London (TFL)

Transport for London's (TfL) portal for transportation in London.

Traffic WalesTraffic Wales

The Welsh government's traffic information service for Wales.

Traffic ScotlandTraffic Scotland

Live traffic conditions and news for Scotland's road network.

Advertise on Traffic UpdateYOUR AD HERE

Advertise to millions of motorists, holidaymakers and commuters.

Location: northbound at the junction with the M4 .

Due to: Barrier repairs are planned.

Status : Pending.

Schedule : From 21:00 on 4 November 2024 to 06:00 on 5 November 2024.

Lanes Closed : All lanes will be closed.
Nearest town: 8.12 miles from Woodway.

51.45--1.32

Location: southbound between junctions J8A (Thame) and J8 (Oxford) .

Lane Closures : The hard shoulder is closed.

Due to: Barrier repairs.



Period : expect disruption until 23:00 on 16 November 2024.
Nearest town: 14.17 miles from Woodway.

51.74--1.09

Location: northbound between junctions J4 (High Wycombe) and J5 (High Wycombe) .

Lane Closures : The hard shoulder is closed.

Due to: Barrier repairs.



Period : expect disruption until 23:59 on 17 November 2024.
Nearest town: 18.95 miles from Woodway.

51.62--0.81

Location: northbound between junctions J8A (Thame) and J9 (Bicester) .

Lane Closures : Lanes 2 and 3 will be closed.

Due to: Barrier repairs are planned.

Status : Pending.

Schedule : From 22:15 on 4 November 2024 to 06:00 on 5 November 2024.

Lanes Closed : There will be two of three lanes closed.
Nearest town: 19.9 miles from Woodway.

51.83--1.12

Location: southbound between junctions J5 (High Wycombe) and J4 (High Wycombe) .

Lane Closures : Lanes 1, 2 and 3 will be closed.

Due to: Road repairs are planned.

Status : Pending.

Schedule : Expect disruption everyday between 22:00 and 05:30 from 4 November 2024 to 9 November 2024.

Lanes Closed : All lanes will be closed.
Nearest town: 15.72 miles from Woodway.

51.66--0.92

Location: southbound entry slip from the A4130 .

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 21:00 on 4 November 2024 to 06:00 on 5 November 2024.

Lanes Closed : All lanes will be closed.
Nearest town: 19.46 miles from Woodway.

51.53--0.79

Location: westbound between junctions J10 (Reading) and J12 (Reading) .

Due to: Roadworks scheme.



Period : from 20:02 on 25 October 2024 to 06:00 on 26 November 2024.
Nearest town: 16.46 miles from Woodway.

51.42--0.92

Location: eastbound between junctions J12 (Reading) and J10 (Reading) .

Due to: Roadworks scheme.



Period : from 14:12 on 10 September 2024 to 06:00 on 31 March 2025.
Nearest town: 10.88 miles from Woodway.

51.44--1.06

Location: eastbound at junction J10 (Reading) .

Lane Closures : Lane one is closed.

Due to: Roadworks.



Period : expect disruption until 06:00 on 31 March 2025.

Lanes Closed : There is one of three lanes closed.
Nearest town: 18.29 miles from Woodway.

51.43--0.86

Location: eastbound at junction J12 (Reading) .

Lane Closures : Lane one is closed.

Due to: Roadworks.



Period : expect disruption until 06:00 on 31 March 2025.

Lanes Closed : There is one of three lanes closed.
Nearest town: 10.88 miles from Woodway.

51.44--1.06

Location: westbound at junction J12 (Reading) .

Lane Closures : Lane one is closed.

Due to: Roadworks.



Period : expect disruption until 06:00 on 31 March 2025.

Lanes Closed : There is one of three lanes closed.
Nearest town: 11.04 miles from Woodway.

51.44--1.06

Location: westbound between junctions J11 (Basingstoke) and J12 (Reading) .

Lane Closures : Lane one is closed.

Due to: Roadworks.



Period : expect disruption until 06:00 on 31 March 2025.

Lanes Closed : There is one of four lanes closed.
Nearest town: 14.56 miles from Woodway.

51.41--0.98

Location: westbound between junctions J10 (Reading) and J11 (Basingstoke) .

Lane Closures : Lane one is closed.

Due to: Roadworks.



Period : expect disruption until 06:00 on 31 March 2025.

Lanes Closed : There is one of four lanes closed.
Nearest town: 18.26 miles from Woodway.

51.43--0.86

Location: eastbound between junctions J11 (Basingstoke) and J10 (Reading) .

Lane Closures : Lane one is closed.

Due to: Roadworks.



Period : expect disruption until 06:00 on 31 March 2025.

Lanes Closed : There is one of four lanes closed.
Nearest town: 15.35 miles from Woodway.

51.41--0.96

Location: eastbound at junction J11 (Basingstoke) .

Lane Closures : Lane one is closed.

Due to: Roadworks.



Period : expect disruption until 06:00 on 31 March 2025.

Lanes Closed : There is one of three lanes closed.
Nearest town: 14.76 miles from Woodway.

51.41--0.98

Location: westbound at junction J11 (Basingstoke) .

Lane Closures : Lane one is closed.

Due to: Roadworks.



Period : expect disruption until 06:00 on 31 March 2025.

Lanes Closed : There is one of three lanes closed.
Nearest town: 15.18 miles from Woodway.

51.41--0.97

Location: eastbound between junctions J12 (Reading) and J11 (Basingstoke) .

Lane Closures : Lane one is closed.

Due to: Roadworks.



Period : expect disruption until 06:00 on 31 March 2025.

Lanes Closed : There is one of four lanes closed.
Nearest town: 11.19 miles from Woodway.

51.44--1.06

Location: westbound between junctions J11 (Basingstoke) and J12 (Reading) .

Due to: Roadworks scheme.



Period : from 21:00 on 31 October 2024 to 06:00 on 23 November 2024.
Nearest town: 11.01 miles from Woodway.

51.44--1.06

Location: westbound at junction J12 (Reading) .

Lane Closures : The hard shoulder is closed.

Due to: Roadworks.



Period : expect disruption until 06:00 on 6 March 2025.
Nearest town: 11.01 miles from Woodway.

51.44--1.06

Location: westbound between junctions J10 (Reading) and J12 (Reading) .

Due to: Roadworks scheme.



Period : from 23:01 on 15 May 2024 to 06:00 on 31 March 2025.
Nearest town: 18.38 miles from Woodway.

51.43--0.86

Location: northbound exit slip at junction J5 (High Wycombe) .

Lane Closures : Lanes 1 and 2 will be closed.

Due to: Emergency barrier repairs are planned.

Status : Pending.

Schedule : From 22:15 on 9 November 2024 to 06:00 on 10 November 2024.

Lanes Closed : All lanes will be closed.
Nearest town: 15.99 miles from Woodway.

51.66--0.91

Location: northbound between junctions J4 (High Wycombe) and J5 (High Wycombe) .

Lane Closures : Lanes 1 and 2 will be closed.

Due to: Emergency barrier repairs are planned.

Status : Pending.

Schedule : From 22:15 on 9 November 2024 to 06:00 on 10 November 2024.

Lanes Closed : There will be two of three lanes closed.
Nearest town: 16.22 miles from Woodway.

51.65--0.89

Location: eastbound between junctions J12 (Reading) and J11 (Basingstoke) .

Lane Closures : Lanes 1, 2 and 3 will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 5 November 2024 to 9 November 2024.

Lanes Closed : There will be three of four lanes closed.
Nearest town: 11.57 miles from Woodway.

51.43--1.05

Location: eastbound at junction J11 (Basingstoke) .

Lane Closures : Lanes 1, 2 and 3 will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 5 December 2024 to 7 December 2024.

Schedule : From 20:00 on 9 December 2024 to 06:00 on 10 December 2024.

Lanes Closed : All lanes will be closed.
Nearest town: 14.76 miles from Woodway.

51.41--0.98

Location: eastbound between junctions J12 (Reading) and J11 (Basingstoke) .

Lane Closures : Lanes 1, 2 and 3 will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 5 December 2024 to 7 December 2024.

Schedule : From 20:00 on 9 December 2024 to 06:00 on 10 December 2024.

Lanes Closed : There will be three of four lanes closed.
Nearest town: 13.49 miles from Woodway.

51.42--1.01

Location: eastbound between junctions J11 (Basingstoke) and J10 (Reading) .

Lane Closures : Lanes 1, 2 and 3 will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 20:00 on 21 November 2024 to 06:00 on 22 November 2024.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 9 December 2024 to 11 December 2024.

Lanes Closed : There will be three of four lanes closed.
Nearest town: 15.76 miles from Woodway.

51.42--0.94

Location: eastbound between junctions J11 (Basingstoke) and J10 (Reading) .

Lane Closures : Lanes 1, 2 and 3 will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 28 November 2024 to 30 November 2024.

Lanes Closed : There will be three of four lanes closed.
Nearest town: 16.65 miles from Woodway.

51.42--0.91

Location: eastbound between junctions J11 (Basingstoke) and J10 (Reading) .

Lane Closures : Lanes 1, 2 and 3 will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 14 November 2024 to 16 November 2024.

Lanes Closed : There will be three of four lanes closed.
Nearest town: 15.35 miles from Woodway.

51.41--0.96

Location: eastbound at junction J11 (Basingstoke) .

Lane Closures : Lanes 1, 2 and 3 will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 14 November 2024 to 16 November 2024.

Lanes Closed : All lanes will be closed.
Nearest town: 14.76 miles from Woodway.

51.41--0.98

Location: eastbound between junctions J12 (Reading) and J11 (Basingstoke) .

Lane Closures : Lanes 1, 2 and 3 will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 14 November 2024 to 16 November 2024.

Lanes Closed : There will be three of four lanes closed.
Nearest town: 13.77 miles from Woodway.

51.42--1

Location: westbound.

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 21:00 on 10 November 2024 to 06:00 on 11 November 2024.

Lanes Closed : All lanes will be closed.
Nearest town: 14.7 miles from Woodway.

51.48--1.56

Location: westbound between junctions J14 (Hungerford) and J15 (Swindon) .

Due to: Roadworks scheme is planned.

Status : Pending.

Schedule : From 21:00 on 10 November 2024 to 06:00 on 11 November 2024.
Nearest town: 12.65 miles from Woodway.

51.45--1.48

Location: westbound exit slip at Membury Services.

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 21:00 on 10 November 2024 to 06:00 on 11 November 2024.

Lanes Closed : All lanes will be closed.
Nearest town: 14.47 miles from Woodway.

51.48--1.55

Location: westbound between junctions J14 (Hungerford) and J15 (Swindon) .

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 21:00 on 10 November 2024 to 06:00 on 11 November 2024.

Lanes Closed : All lanes will be closed.
Nearest town: 12.65 miles from Woodway.

51.45--1.48

Location: westbound at junction J14 (Hungerford) .

Lane Closures : Lanes 1, 2 and 3 will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 21:00 on 10 November 2024 to 06:00 on 11 November 2024.

Lanes Closed : All lanes will be closed.
Nearest town: 12.45 miles from Woodway.

51.45--1.48

Location: eastbound entry slip at junction J10 (Reading) .

Due to: Roadworks scheme is planned.

Status : Pending.

Schedule : From 21:00 on 10 November 2024 to 05:00 on 12 November 2024.
Nearest town: 18.16 miles from Woodway.

51.43--0.86

Location: eastbound at junction J10 (Reading) .

Lane Closures : Lanes 1, 2 and 3 will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 21:00 and 05:00 from 10 November 2024 to 12 November 2024.

Lanes Closed : All lanes will be closed.
Nearest town: 18.29 miles from Woodway.

51.43--0.86

Location: eastbound entry slip at junction J10 (Reading) .

Lane Closures : Lane one will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 21:00 and 05:00 from 10 November 2024 to 12 November 2024.

Lanes Closed : All lanes will be closed.
Nearest town: 18.44 miles from Woodway.

51.43--0.86

Location: eastbound between junctions J10 (Reading) and J8 (High Wycombe) .

Lane Closures : Lanes 1 and 2 will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 21:00 and 05:00 from 10 November 2024 to 12 November 2024.

Lanes Closed : All lanes will be closed.
Nearest town: 18.16 miles from Woodway.

51.43--0.86

Location: southbound between the A343 and the junction with the A303 .

Lane Closures : Lane two will be closed.

Due to: Barrier repairs are planned.

Status : Pending.

Schedule : From 20:00 on 7 November 2024 to 06:00 on 8 November 2024.

Lanes Closed : There will be one of two lanes closed.
Nearest town: 14.18 miles from Woodway.

51.36--1.35

Location: northbound between the A303 and the junction with the A343 .

Lane Closures : Lane two will be closed.

Due to: Barrier repairs are planned.

Status : Pending.

Schedule : From 20:00 on 7 November 2024 to 06:00 on 8 November 2024.

Lanes Closed : There will be one of two lanes closed.
Nearest town: 15.29 miles from Woodway.

51.34--1.34

Location: northbound between the junctions with the A303 and the A343 .

Lane Closures : Lane two will be closed.

Due to: Barrier repairs are planned.

Status : Pending.

Schedule : From 20:00 on 5 November 2024 to 06:00 on 6 November 2024.

Lanes Closed : There will be one of two lanes closed.
Nearest town: 16.72 miles from Woodway.

51.32--1.34

Location: southbound between the A343 and the junction with the A303 .

Lane Closures : Lane two will be closed.

Due to: Barrier repairs are planned.

Status : Pending.

Schedule : From 20:00 on 5 November 2024 to 06:00 on 6 November 2024.

Lanes Closed : There will be one of two lanes closed.
Nearest town: 14.79 miles from Woodway.

51.35--1.34

Location: southbound between junctions J8A (Thame) and J6 (Thame) .

Lane Closures : Lanes 2 and 3 will be closed.

Due to: Roadside drains works are planned.

Status : Pending.

Schedule : From 21:30 on 7 November 2024 to 06:00 on 8 November 2024.

Lanes Closed : There will be two of three lanes closed.
Nearest town: 14.17 miles from Woodway.

51.73--1.06

Location: northbound between junctions J6 (Thame) and J8A (Thame) .

Lane Closures : Lanes 2 and 3 will be closed.

Due to: Roadside drains works are planned.

Status : Pending.

Schedule : From 21:30 on 7 November 2024 to 06:00 on 8 November 2024.

Lanes Closed : There will be two of three lanes closed.
Nearest town: 14.64 miles from Woodway.

51.7--0.99

Location: northbound between the junctions with the A4130 and the A415 .

Lane Closures : Lane one will be closed.

Due to: Roadside drains works are planned.

Status : Pending.

Schedule : From 20:30 on 7 November 2024 to 06:00 on 8 November 2024.

Lanes Closed : There will be one of two lanes closed.
Nearest town: 5.82 miles from Woodway.

51.62--1.31

Location: eastbound between junctions J15 (Swindon) and J14 (Hungerford) .

Due to: Roadworks scheme is planned.

Status : Pending.

Schedule : From 20:00 on 7 November 2024 to 06:00 on 16 November 2024.
Nearest town: 19.52 miles from Woodway.

51.53--1.69

Location: eastbound between junctions J15 (Swindon) and J14 (Hungerford) .

Lane Closures : Lanes 1 and 2 will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 20:00 on 7 November 2024 to 06:00 on 8 November 2024.

Lanes Closed : There will be two of three lanes closed.
Nearest town: 19.24 miles from Woodway.

51.53--1.68

Location: eastbound between junctions J15 (Swindon) and J14 (Hungerford) .

Lane Closures : Lanes 1 and 2 will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 20:00 on 8 November 2024 to 06:00 on 9 November 2024.

Lanes Closed : There will be two of three lanes closed.
Nearest town: 19.52 miles from Woodway.

51.53--1.69

Location: eastbound between junctions J15 (Swindon) and J14 (Hungerford) .

Lane Closures : Lanes 2 and 3 will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 20:00 on 15 November 2024 to 06:00 on 16 November 2024.

Lanes Closed : There will be two of three lanes closed.
Nearest town: 18.85 miles from Woodway.

51.52--1.67

Location: westbound at junction J12 (Reading) .

Lane Closures : Lanes 2 and 3 will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 21:00 and 06:00 from 4 November 2024 to 10 November 2024.

Schedule : Expect disruption everyday between 21:00 and 06:00 from 11 November 2024 to 16 November 2024.

Lanes Closed : There will be two of three lanes closed.
Nearest town: 11.04 miles from Woodway.

51.44--1.06

Location: westbound between junctions J11 (Basingstoke) and J12 (Reading) .

Lane Closures : Lanes 2 and 3 will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 21:00 and 06:00 from 4 November 2024 to 10 November 2024.

Schedule : Expect disruption everyday between 21:00 and 06:00 from 11 November 2024 to 16 November 2024.

Lanes Closed : There will be two of four lanes closed.
Nearest town: 12 miles from Woodway.

51.43--1.04

Location: westbound entry slip at junction J12 (Reading) .

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 21:00 on 2 November 2024 to 06:00 on 3 November 2024.

Schedule : Expect disruption everyday between 21:00 and 06:00 from 4 November 2024 to 10 November 2024.

Schedule : Expect disruption everyday between 21:00 and 06:00 from 11 November 2024 to 17 November 2024.

Schedule : Expect disruption everyday between 21:00 and 06:00 from 18 November 2024 to 23 November 2024.

Lanes Closed : All lanes will be closed.
Nearest town: 10.72 miles from Woodway.

51.44--1.07

Location: eastbound entry slip at junction J12 (Reading) .

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 21:00 and 06:00 from 6 January 2025 to 12 January 2025.

Schedule : Expect disruption everyday between 21:00 and 06:00 from 13 January 2025 to 19 January 2025.

Schedule : Expect disruption everyday between 21:00 and 06:00 from 20 January 2025 to 26 January 2025.

Schedule : Expect disruption everyday between 21:00 and 06:00 from 27 January 2025 to 31 January 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 10.79 miles from Woodway.

51.44--1.06

Location: northbound entry slip from the A4130 .

Due to: Roadside drains works are planned.

Status : Pending.

Schedule : From 21:30 on 6 November 2024 to 06:00 on 7 November 2024.

Lanes Closed : All lanes will be closed.
Nearest town: 5.41 miles from Woodway.

51.62--1.3

Location: northbound exit slip to the A4130 .

Due to: Roadside drains works are planned.

Status : Pending.

Schedule : From 21:30 on 6 November 2024 to 06:00 on 7 November 2024.

Lanes Closed : All lanes will be closed.
Nearest town: 5.21 miles from Woodway.

51.62--1.3

Location: northbound between junctions J8A (Thame) and J9 (Bicester) .

Lane Closures : Lanes 2 and 3 will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 21:30 on 6 November 2024 to 06:00 on 7 November 2024.

Lanes Closed : There will be two of three lanes closed.
Nearest town: 18.36 miles from Woodway.

51.8--1.09

Location: southbound between junctions J8A (Thame) and J5 (High Wycombe) .

Lane Closures : Lanes 2 and 3 will be closed.

Due to: Roadside drains works are planned.

Status : Pending.

Schedule : From 21:30 on 6 November 2024 to 06:00 on 7 November 2024.

Lanes Closed : There will be two of three lanes closed.
Nearest town: 14.53 miles from Woodway.

51.68--0.97

Location: northbound between junctions J4 (High Wycombe) and J6 (Thame) .

Lane Closures : Lanes 2 and 3 will be closed.

Due to: Roadside drains works are planned.

Status : Pending.

Schedule : From 21:30 on 6 November 2024 to 06:00 on 7 November 2024.

Lanes Closed : There will be two of three lanes closed.
Nearest town: 16.22 miles from Woodway.

51.65--0.89

Location: southbound between junctions J9 (Bicester) and J8A (Thame) .

Lane Closures : Lanes 2 and 3 will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 21:30 on 6 November 2024 to 06:00 on 7 November 2024.

Lanes Closed : There will be two of three lanes closed.
Nearest town: 19.93 miles from Woodway.

51.83--1.12

Location: westbound entry slip at junction J10 (Reading) .

Lane Closures : Lanes 1 and 2 will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 21:00 and 06:00 from 5 November 2024 to 7 November 2024.

Lanes Closed : All lanes will be closed.
Nearest town: 18.65 miles from Woodway.

51.43--0.85

Location: westbound entry slip at junction J10 (Reading) .

Lane Closures : Lane one will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 21:00 and 06:00 from 5 November 2024 to 7 November 2024.

Lanes Closed : All lanes will be closed.
Nearest town: 18.47 miles from Woodway.

51.43--0.85

Location: westbound between junctions J13 (Newbury) and J14 (Hungerford) .

Lane Closures : Lane one will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 20:00 on 5 November 2024 to 06:00 on 6 November 2024.

Lanes Closed : There will be one of three lanes closed.
Nearest town: 9.04 miles from Woodway.

51.45--1.38

Location: westbound between junctions J10 (Reading) and J11 (Basingstoke) .

Due to: Roadworks scheme is planned.

Status : Pending.

Schedule : From 21:00 on 5 November 2024 to 06:00 on 7 November 2024.
Nearest town: 18.68 miles from Woodway.

51.44--0.85

Location: westbound exit slip at junction J11 (Basingstoke) .

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 21:00 and 06:00 from 5 November 2024 to 7 November 2024.

Lanes Closed : All lanes will be closed.
Nearest town: 15.18 miles from Woodway.

51.41--0.97

Location: westbound between junctions J10 (Reading) and J11 (Basingstoke) .

Lane Closures : Lanes 1, 2 and 3 will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 21:00 and 06:00 from 5 November 2024 to 7 November 2024.

Lanes Closed : All lanes will be closed.
Nearest town: 18.68 miles from Woodway.

51.44--0.85

Location: southbound between junctions J9 (Bicester) and J8A (Thame) .

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 09:30 on 5 November 2024 to 15:30 on 5 November 2024.
Nearest town: 17.75 miles from Woodway.

51.79--1.09

Location: southbound between junctions J6 (Thame) and J5 (High Wycombe) .

Lane Closures : Lanes 2 and 3 will be closed.

Due to: Road repairs are planned.

Status : Pending.

Schedule : Expect disruption everyday between 22:00 and 05:30 from 4 November 2024 to 9 November 2024.

Lanes Closed : There will be two of three lanes closed.
Nearest town: 15.23 miles from Woodway.

51.66--0.93

Location: southbound entry slip at junction J5 (High Wycombe) .

Lane Closures : Lanes 1 and 2 will be closed.

Due to: Road repairs are planned.

Status : Pending.

Schedule : Expect disruption everyday between 22:00 and 05:30 from 4 November 2024 to 11 November 2024.

Lanes Closed : All lanes will be closed.
Nearest town: 15.82 miles from Woodway.

51.66--0.91

Location: westbound between junctions J10 (Reading) and J11 (Basingstoke) .

Lane Closures : Lanes 1, 2 and 3 will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 20:00 on 25 November 2024 to 06:00 on 26 November 2024.

Lanes Closed : There will be three of four lanes closed.
Nearest town: 17.56 miles from Woodway.

51.42--0.88

Location: westbound exit slip at junction J12 (Reading) .

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 21:00 and 06:00 from 20 November 2024 to 22 November 2024.

Lanes Closed : All lanes will be closed.
Nearest town: 11.04 miles from Woodway.

51.44--1.06

Location: northbound exit slip to the A4185 .

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 18 November 2024 to 23 November 2024.

Schedule : Expect disruption everyday between 21:00 and 06:00 from 25 November 2024 to 30 November 2024.

Lanes Closed : All lanes will be closed.
Nearest town: 2.95 miles from Woodway.

51.57--1.3

Location: northbound exit slip to the A4185 .

Lane Closures : Lane one will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 4 November 2024 to 9 November 2024.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 11 November 2024 to 13 November 2024.

Lanes Closed : There will be one of two lanes closed.
Nearest town: 2.95 miles from Woodway.

51.57--1.3

Location: northbound entry slip from the A4185 .

Lane Closures : Lane one will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 18 November 2024 to 23 November 2024.

Schedule : Expect disruption everyday between 21:00 and 06:00 from 25 November 2024 to 30 November 2024.

Lanes Closed : All lanes will be closed.
Nearest town: 3.03 miles from Woodway.

51.57--1.3

Location: northbound between the M4 and the junction with the A4185 .

Lane Closures : Lane one will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 18 November 2024 to 23 November 2024.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 25 November 2024 to 30 November 2024.

Lanes Closed : There will be one of two lanes closed.
Nearest town: 2.88 miles from Woodway.

51.56--1.3

Location: northbound between the M4 and the junction with the A4185 .

Lane Closures : Lane one will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 4 November 2024 to 9 November 2024.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 11 November 2024 to 13 November 2024.

Lanes Closed : There will be one of two lanes closed.
Nearest town: 2.88 miles from Woodway.

51.56--1.3

Location: eastbound entry slip at junction J12 (Reading) .

Due to: Roadworks scheme is planned.

Status : Pending.

Schedule : From 21:00 on 6 January 2025 to 06:00 on 15 March 2025.
Nearest town: 10.79 miles from Woodway.

51.44--1.06

Location: eastbound between junctions J12 (Reading) and J10 (Reading) .

Due to: Roadworks scheme is planned.

Status : Pending.

Schedule : From 20:00 on 5 November 2024 to 06:00 on 11 December 2024.
Nearest town: 13.49 miles from Woodway.

51.42--1.01