Location: eastbound between junctions J16 (Swindon) and J14 (Hungerford) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 21:00 on 15 March 2025 to 06:00 on 17 April 2025.
Nearest town: 1.06 miles from Wanborough.

Location: southbound entry slip from the M4 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 15 March 2025 to 05:00 on 16 March 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 18.32 miles from Wanborough.

Location: southbound entry slip at Chieveley Services.
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 21:00 on 15 March 2025 to 05:00 on 16 March 2025.
Nearest town: 18.25 miles from Wanborough.

Location: southbound entry slip at Chieveley Services.
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 15 March 2025 to 05:00 on 16 March 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.25 miles from Wanborough.

Location: eastbound between junctions J17 (Chippenham) and J16 (Swindon) .
Lane Closures : The hard shoulder, lanes 1 and 2 are closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 15 March 2025.
Lanes Closed : There are two of three lanes closed.
Nearest town: 10.25 miles from Wanborough.

Location: westbound between junctions J16 (Swindon) and J17 (Chippenham) .
Lane Closures : The hard shoulder, lanes 1 and 2 are closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 15 March 2025.
Lanes Closed : There are two of three lanes closed.
Nearest town: 8.11 miles from Wanborough.

Location: westbound between junctions J14 (Hungerford) and J15 (Swindon) .
Due to: Roadworks scheme.
Period : from 21:00 on 13 March 2025 to 06:00 on 3 May 2025.
Nearest town: 11.45 miles from Wanborough.

Location: eastbound between junctions J17 (Chippenham) and J16 (Swindon) .
Lane Closures : The hard shoulder is closed.
Due to: Emergency barrier repairs.
Period : expect disruption until 00:00 on 30 July 2025.
Nearest town: 9.65 miles from Wanborough.

Location: eastbound between junctions J16 (Swindon) and J15 (Swindon) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 21 March 2025 to 06:00 on 22 March 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 4.53 miles from Wanborough.

Location: westbound entry slip at junction J15 (Swindon) .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 21 March 2025 to 06:00 on 22 March 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 0.9 miles from Wanborough.

Location: westbound between junctions J15 (Swindon) and J16 (Swindon) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 21:00 on 21 March 2025 to 06:00 on 22 March 2025.
Nearest town: 0.76 miles from Wanborough.

Location: westbound between junctions J15 (Swindon) and J16 (Swindon) .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 21 March 2025 to 06:00 on 22 March 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 0.76 miles from Wanborough.

Location: westbound between junctions J16 (Swindon) and J18 (Bath) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 21:00 on 21 March 2025 to 06:00 on 24 March 2025.
Nearest town: 16.76 miles from Wanborough.

Location: westbound between junctions J17 (Chippenham) and J18 (Bath) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:45 on 21 March 2025 to 22:00 on 22 March 2025.
Schedule : From 21:45 on 23 March 2025 to 06:00 on 24 March 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 17.3 miles from Wanborough.

Location: westbound between junctions J16 (Swindon) and J17 (Chippenham) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 21 March 2025 to 06:00 on 22 March 2025.
Schedule : From 21:00 on 23 March 2025 to 06:00 on 24 March 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 16.76 miles from Wanborough.

Location: southbound between the A343 and the junction with the A303 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 21 March 2025 to 06:00 on 22 March 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.35 miles from Wanborough.

Location: southbound.
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 21:00 on 21 March 2025 to 06:00 on 22 March 2025.
Nearest town: 19.35 miles from Wanborough.

Location: westbound between junctions J17 (Chippenham) and J18 (Bath) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 20 March 2025 to 06:00 on 21 March 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 17.62 miles from Wanborough.

Location: eastbound between junctions J17 (Chippenham) and J16 (Swindon) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 08:00 on 21 March 2025 to 18:00 on 21 March 2025.
Nearest town: 7 miles from Wanborough.

Location: westbound between junctions J15 (Swindon) and J16 (Swindon) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 08:00 on 21 March 2025 to 18:00 on 21 March 2025.
Nearest town: 5.64 miles from Wanborough.

Location: westbound between junctions J13 (Newbury) and J14 (Hungerford) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 20 March 2025 to 06:00 on 21 March 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 17.22 miles from Wanborough.

Location: southbound between the A417 and the junction with the A361 .
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 20:00 on 20 March 2025 to 06:00 on 21 March 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 13.03 miles from Wanborough.

Location: westbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 17 March 2025 to 21 March 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 24 March 2025 to 28 March 2025.
Schedule : From 21:00 on 31 March 2025 to 06:00 on 1 April 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 3 April 2025 to 5 April 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 7.53 miles from Wanborough.

Location: westbound between junctions J14 (Hungerford) and J15 (Swindon) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 06:00 and 20:00 from 25 March 2025 to 27 March 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 3.23 miles from Wanborough.

Location: westbound between junctions J14 (Hungerford) and J15 (Swindon) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 06:00 on 20 March 2025 to 20:00 on 20 March 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 3.77 miles from Wanborough.

Location: westbound between junctions J14 (Hungerford) and J15 (Swindon) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 21 March 2025 to 23 March 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 3.23 miles from Wanborough.

Location: westbound between junctions J14 (Hungerford) and J15 (Swindon) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 06:00 on 19 March 2025 to 20:00 on 19 March 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 4.09 miles from Wanborough.

Location: westbound between junctions J14 (Hungerford) and J15 (Swindon) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 06:00 on 18 March 2025 to 20:00 on 18 March 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 3.89 miles from Wanborough.

Location: eastbound entry slip at junction J15 (Swindon) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 15 March 2025 to 17 March 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 7 April 2025 to 12 April 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 14 April 2025 to 17 April 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 0.78 miles from Wanborough.

Location: eastbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 15 March 2025 to 17 March 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 7 April 2025 to 12 April 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 14 April 2025 to 17 April 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 7.75 miles from Wanborough.

Location: westbound exit slip at junction J15 (Swindon) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 17 March 2025 to 21 March 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 24 March 2025 to 28 March 2025.
Schedule : From 21:00 on 31 March 2025 to 06:00 on 1 April 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 3 April 2025 to 5 April 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 0.76 miles from Wanborough.

Location: westbound exit slip at Membury Services.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 17 March 2025 to 21 March 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 24 March 2025 to 28 March 2025.
Schedule : From 21:00 on 31 March 2025 to 06:00 on 1 April 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 3 April 2025 to 5 April 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 7.93 miles from Wanborough.

Location: eastbound exit slip at Membury Services.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 15 March 2025 to 17 March 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 7 April 2025 to 12 April 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 14 April 2025 to 17 April 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 7.41 miles from Wanborough.

Location: westbound between junctions J14 (Hungerford) and J15 (Swindon) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 14 March 2025 to 06:00 on 15 March 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 17 March 2025 to 21 March 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 24 March 2025 to 28 March 2025.
Schedule : From 21:00 on 31 March 2025 to 06:00 on 1 April 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 11.45 miles from Wanborough.

Location: eastbound between junctions J16 (Swindon) and J14 (Hungerford) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 15 March 2025 to 17 March 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 7 April 2025 to 12 April 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 14 April 2025 to 17 April 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 1.06 miles from Wanborough.

Location: westbound at junction J14 (Hungerford) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 17 March 2025 to 21 March 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 24 March 2025 to 28 March 2025.
Schedule : From 21:00 on 31 March 2025 to 06:00 on 1 April 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 3 April 2025 to 5 April 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 11.75 miles from Wanborough.

Location: eastbound exit slip at junction J14 (Hungerford) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 15 March 2025 to 17 March 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 7 April 2025 to 12 April 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 14 April 2025 to 17 April 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 11.16 miles from Wanborough.

Location: eastbound at junction J16 (Swindon) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 09:00 on 19 March 2025 to 16:00 on 19 March 2025.
Nearest town: 6.29 miles from Wanborough.

Location: westbound entry slip at junction J15 (Swindon) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 09:00 on 20 March 2025 to 16:00 on 20 March 2025.
Nearest town: 0.9 miles from Wanborough.

Location: northbound exit slip to the A420 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 09:00 on 20 March 2025 to 15:00 on 20 March 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 2.58 miles from Wanborough.

Location: eastbound between junctions J14 (Hungerford) and J13 (Newbury) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 17 March 2025 to 06:00 on 19 March 2025.
Nearest town: 13.46 miles from Wanborough.

Location: eastbound between junctions J14 (Hungerford) and J13 (Newbury) .
Lane Closures : Lane three will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 17 March 2025 to 06:00 on 18 March 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 13.46 miles from Wanborough.

Location: eastbound between junctions J14 (Hungerford) and J13 (Newbury) .
Lane Closures : Lane three will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 18 March 2025 to 06:00 on 19 March 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 15.29 miles from Wanborough.

Location: westbound between junctions J13 (Newbury) and J14 (Hungerford) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 17 March 2025 to 06:00 on 19 March 2025.
Nearest town: 18.3 miles from Wanborough.

Location: westbound between junctions J13 (Newbury) and J14 (Hungerford) .
Lane Closures : Lane three will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 17 March 2025 to 06:00 on 18 March 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 15.71 miles from Wanborough.

Location: westbound between junctions J13 (Newbury) and J14 (Hungerford) .
Lane Closures : Lane three will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 18 March 2025 to 06:00 on 19 March 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 18.3 miles from Wanborough.

Location: southbound entry slip from the A4130 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 19 March 2025 to 21 March 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.54 miles from Wanborough.

Location: southbound between the A415 and the junction with the M4 .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 21:00 on 19 March 2025 to 06:00 on 21 March 2025.
Nearest town: 18.46 miles from Wanborough.

Location: southbound between the A415 and the junction with the M4 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 19 March 2025 to 21 March 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.46 miles from Wanborough.

Location: southbound exit slip to the A4185 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 19 March 2025 to 21 March 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.21 miles from Wanborough.

Location: eastbound between junctions J18 (Bath) and J17 (Chippenham) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 08:00 on 19 March 2025 to 18:00 on 19 March 2025.
Nearest town: 18.67 miles from Wanborough.

Location: northbound between the M4 and the junction with the A4185 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 18 March 2025 to 06:00 on 19 March 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 17.78 miles from Wanborough.

Location: westbound between junctions J16 (Swindon) and J17 (Chippenham) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 08:00 on 18 March 2025 to 18:00 on 18 March 2025.
Nearest town: 16.58 miles from Wanborough.

Location: northbound exit slip to the A343 .
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 22:30 on 17 March 2025 to 06:00 on 18 March 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.44 miles from Wanborough.

Location: northbound exit slip to the A343 .
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 22:30 on 17 March 2025 to 06:00 on 18 March 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.4 miles from Wanborough.

Location: northbound entry slip from the A343 .
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 22:30 on 17 March 2025 to 06:00 on 18 March 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.44 miles from Wanborough.

Location: northbound between the A303 and the junction with the A343 .
Lane Closures : Lane one will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 22:30 on 17 March 2025 to 06:00 on 18 March 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.77 miles from Wanborough.

Location: eastbound between junctions J17 (Chippenham) and J16 (Swindon) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 17 March 2025 to 19 March 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 11.49 miles from Wanborough.

Location: westbound between junctions J16 (Swindon) and J17 (Chippenham) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 17 March 2025 to 19 March 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 7.24 miles from Wanborough.

Location: eastbound between junctions J16 (Swindon) and J15 (Swindon) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 08:00 on 17 March 2025 to 18:00 on 17 March 2025.
Nearest town: 1.58 miles from Wanborough.

Location: eastbound between junctions J16 (Swindon) and J15 (Swindon) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 09:00 and 16:00 from 17 March 2025 to 19 March 2025.
Nearest town: 3.37 miles from Wanborough.