Location: anticlockwise entry slip at junction J19 (Middleton) .
Due to: Gantry construction is planned.
Status : Pending.
Schedule : From 21:00 on 5 November 2024 to 05:00 on 6 November 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 15.68 miles from Walk Mill.
Location: anticlockwise entry slip at junction J19 (Middleton) .
Due to: Gantry construction is planned.
Status : Pending.
Schedule : From 21:00 on 5 November 2024 to 05:00 on 6 November 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 15.68 miles from Walk Mill.
Location: eastbound at junction J18 (M60) .
Due to: Road traffic collision.
Status : Cleared.
Nearest town: 14.92 miles from Walk Mill.
Location: anticlockwise between junctions J19 (Middleton) and J18 (Leeds) .
Lane Closures : Lane one will be closed.
Due to: Gantry construction is planned.
Status : Pending.
Schedule : From 21:00 on 5 November 2024 to 05:00 on 6 November 2024.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 15.41 miles from Walk Mill.
Location: anticlockwise at junction J19 (Middleton) .
Lane Closures : Lane one will be closed.
Due to: Gantry construction is planned.
Status : Pending.
Schedule : From 21:00 on 5 November 2024 to 05:00 on 6 November 2024.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 15.66 miles from Walk Mill.
Location: anticlockwise entry slip at junction J19 (Middleton) .
Lane Closures : Lane one will be closed.
Due to: Gantry construction is planned.
Status : Pending.
Schedule : From 21:00 on 5 November 2024 to 05:00 on 6 November 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 15.64 miles from Walk Mill.
Location: southbound between junction J4 and the M60 .
Due to: Congestion.
Normal traffic conditions are expected between 09:30 and 09:45 on 5 November 2024.
Delay : There are currently delays of 15 minutes against expected traffic.
Nearest town: 18.02 miles from Walk Mill.
Location: anticlockwise entry slip at junction J21 (Oldham) .
Due to: Congestion.
Normal traffic conditions are expected between 09:15 and 09:30 on 5 November 2024.
Nearest town: 16.68 miles from Walk Mill.
Location: anticlockwise exit slip at junction J21 (Oldham) .
Due to: Congestion.
Normal traffic conditions are expected between 09:00 and 09:15 on 5 November 2024.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 16.81 miles from Walk Mill.
Location: southbound exit slip at junction J3 .
Due to: Congestion.
Normal traffic conditions are expected between 09:15 and 09:30 on 5 November 2024.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 17.35 miles from Walk Mill.
Location: northbound exit slip at junction J28 (Leyland) .
Due to: Congestion.
Normal traffic conditions are expected between 08:45 and 09:00 on 5 November 2024.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 19.62 miles from Walk Mill.
Location: northbound at the junction with the M60 .
Due to: Congestion.
Normal traffic conditions are expected between 08:45 and 09:00 on 5 November 2024.
Nearest town: 16.7 miles from Walk Mill.
Location: southbound exit slip at junction J4 (Manchester) .
Due to: Congestion.
Normal traffic conditions are expected between 09:00 and 09:15 on 5 November 2024.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 14.87 miles from Walk Mill.
Location: anticlockwise at junction J14 (St Helens) .
Due to: Congestion.
Normal traffic conditions are expected between 08:45 and 09:00 on 5 November 2024.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 17.63 miles from Walk Mill.
Location: southbound between junction J3 and the M60 .
Due to: Congestion.
Normal traffic conditions are expected between 09:00 and 09:15 on 5 November 2024.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 17.44 miles from Walk Mill.
Location: southbound between the A669 and the junction with the M60 .
Due to: Congestion.
Normal traffic conditions are expected between 08:30 and 08:45 on 5 November 2024.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 16.5 miles from Walk Mill.
Location: clockwise exit slip at junction J18 (Leeds) for M62.
Due to: Congestion.
Normal traffic conditions are expected between 08:45 and 09:00 on 5 November 2024.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 15.11 miles from Walk Mill.
Location: anticlockwise exit slip at junction J21 (Oldham) .
Due to: Congestion.
Normal traffic conditions are expected between 08:30 and 08:45 on 5 November 2024.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 16.81 miles from Walk Mill.
Location: anticlockwise exit slip at junction J21 (Oldham) .
Due to: Congestion.
Normal traffic conditions are expected between 08:30 and 08:45 on 5 November 2024.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 17.01 miles from Walk Mill.
Location: eastbound at junction J18 (M60) .
Due to: Congestion.
Normal traffic conditions are expected between 09:00 and 09:15 on 5 November 2024.
Cause : Road traffic collision.
Nearest town: 15.07 miles from Walk Mill.
Location: southbound between junctions J4 and J1 to A580.
Due to: Congestion.
Normal traffic conditions are expected between 10:15 and 10:30 on 5 November 2024.
Delay : There are currently delays of 30 minutes against expected traffic.
Nearest town: 17.96 miles from Walk Mill.
Location: westbound at junction J19 (Middleton) .
Due to: Congestion.
Normal traffic conditions are expected between 08:30 and 08:45 on 5 November 2024.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 13.61 miles from Walk Mill.
Location: northbound exit slip at junction J28 (Leyland) .
Due to: Congestion.
Normal traffic conditions are expected between 08:15 and 08:30 on 5 November 2024.
Nearest town: 19.62 miles from Walk Mill.
Location: southbound exit slip at junction J3 .
Due to: Congestion.
Normal traffic conditions are expected between 08:15 and 08:30 on 5 November 2024.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 17.35 miles from Walk Mill.
Location: eastbound exit slip at junction J5 (Shadsworth) .
Due to: Congestion.
Normal traffic conditions are expected between 08:30 and 08:45 on 5 November 2024.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 10.08 miles from Walk Mill.
Location: eastbound entry slip at junction J18 (M60) from M60.
Due to: Congestion.
Normal traffic conditions are expected between 09:00 and 09:15 on 5 November 2024.
Nearest town: 15 miles from Walk Mill.
Location: eastbound at junction J18 (M60) .
Due to: Congestion.
Normal traffic conditions are expected between 08:15 and 08:30 on 5 November 2024.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 15.07 miles from Walk Mill.
Location: southbound between junction A666 and the M60 .
Due to: Congestion.
Normal traffic conditions are expected between 09:15 and 09:30 on 5 November 2024.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 17.14 miles from Walk Mill.
Location: southbound between the A56 and junction J1 (Ramsbottom) .
Due to: Congestion.
Normal traffic conditions are expected between 09:15 and 09:30 on 5 November 2024.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 9.01 miles from Walk Mill.
Location: The A627M northbound between the junctions with the A664 and the M62 .
Due to: Congestion.
Normal traffic conditions are expected between 08:45 and 09:00 on 5 November 2024.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 12.94 miles from Walk Mill.
Location: southbound at the junction with the A681 .
Due to: Congestion.
Normal traffic conditions are expected between 09:15 and 09:30 on 5 November 2024.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 6.31 miles from Walk Mill.
Location: clockwise between junctions J12 (Warrington) and J17 (Prestwich) .
Due to: Congestion.
Normal traffic conditions are expected between 10:00 and 10:15 on 5 November 2024.
Delay : There are currently delays of 1 hour against expected traffic.
Earlier
Due to: Caused by an earlier accident.
Nearest town: 19.64 miles from Walk Mill.
Location: anticlockwise at junction J17 (Prestwich) .
Due to: Congestion.
Normal traffic conditions are expected between 08:00 and 08:15 on 5 November 2024.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 16.02 miles from Walk Mill.
Location: southbound between junctions J29 (Burnley) and J28 (Leyland) .
Due to: Roadworks.
Period : from 23:29 on 4 November 2024 to 05:00 on 5 November 2024.
Lanes Closed : All lanes are closed.
Nearest town: 18.83 miles from Walk Mill.
Location: southbound between the A56 and junction J1 (Ramsbottom) .
Due to: Roadworks.
Period : from 21:33 on 4 November 2024 to 05:00 on 5 November 2024.
Lanes Closed : All lanes are closed.
Nearest town: 8.06 miles from Walk Mill.
Location: southbound between the A669 and the junction with the M60 .
Lane Closures : Lane one is closed.
Due to: Barrier repairs.
Period : expect disruption until 05:00 on 5 November 2024.
Lanes Closed : There is one of four lanes closed.
Nearest town: 16.44 miles from Walk Mill.
Location: eastbound between junctions J22 (Ripponden) and J24 (Huddersfield) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 5 November 2024 to 05:00 on 6 November 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 12.33 miles from Walk Mill.
Location: northbound between junctions J28 (Leyland) and J30 (Manchester) .
Lane Closures : Lane three is closed.
Due to: Emergency Roadworks.
Period : expect disruption until 05:00 on 5 November 2024.
Lanes Closed : There is one of three lanes closed.
Nearest town: 19.58 miles from Walk Mill.
Location: clockwise exit slip at junction J13 (Swinton) .
Lane Closures : Lane one will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:30 on 5 November 2024 to 05:00 on 6 November 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.92 miles from Walk Mill.
Location: anticlockwise between junctions J16 (Salford) and J14 (St Helens) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 21:00 on 5 November 2024 to 06:00 on 6 November 2024.
Nearest town: 17.32 miles from Walk Mill.
Location: anticlockwise at junction J14 (St Helens) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 5 November 2024 to 06:00 on 6 November 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 17.63 miles from Walk Mill.
Location: anticlockwise between junctions J16 (Salford) and J15 (Bolton) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 5 November 2024 to 06:00 on 6 November 2024.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 17.32 miles from Walk Mill.
Location: anticlockwise exit slip at junction J14 (St Helens) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 5 November 2024 to 06:00 on 6 November 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 17.78 miles from Walk Mill.
Location: westbound between junctions J20 (Rochdale) and J19 (Middleton) .
Lane Closures : Lane one will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 21:00 on 5 November 2024 to 05:00 on 6 November 2024.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 12.58 miles from Walk Mill.
Location: eastbound entry slip at Birch Services.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 23:00 on 5 November 2024 to 05:00 on 6 November 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 13.62 miles from Walk Mill.
Location: eastbound between junctions J19 (Middleton) and J20 (Rochdale) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 23:00 on 5 November 2024 to 05:00 on 6 November 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 12.85 miles from Walk Mill.
Location: eastbound between junctions J18 (M60) and J19 (Middleton) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 23:00 on 5 November 2024 to 05:00 on 6 November 2024.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 14.28 miles from Walk Mill.
Location: westbound at junction J20 (Rochdale) .
Lane Closures : Lane one will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 21:00 on 5 November 2024 to 05:00 on 6 November 2024.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 12.62 miles from Walk Mill.
Location: eastbound exit slip at Birch Services.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 23:00 on 5 November 2024 to 05:00 on 6 November 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 13.84 miles from Walk Mill.
Location: northbound exit slip at junction J31 (Preston) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 20:00 on 5 November 2024 to 06:00 on 6 November 2024.
Schedule : From 20:00 on 13 November 2024 to 06:00 on 14 November 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 17.25 miles from Walk Mill.
Location: anticlockwise exit slip at junction J17 (Prestwich) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 20:00 on 5 November 2024 to 05:00 on 6 November 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 15.81 miles from Walk Mill.
Location: anticlockwise between junctions J18 (Leeds) and J17 (Prestwich) .
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 20:00 on 5 November 2024 to 05:00 on 6 November 2024.
Nearest town: 15.59 miles from Walk Mill.
Location: eastbound between junctions J21 (Milnrow) and J22 (Ripponden) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 20:00 on 5 November 2024 to 05:00 on 6 November 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 12.15 miles from Walk Mill.
Location: eastbound entry slip at junction J21 (Milnrow) .
Lane Closures : Lane one will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 20:00 on 5 November 2024 to 05:00 on 6 November 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 12.01 miles from Walk Mill.
Location: eastbound between junctions J21 (Milnrow) and J22 (Ripponden) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 20:00 on 5 November 2024 to 05:00 on 6 November 2024.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 11.92 miles from Walk Mill.
Location: eastbound between junctions J21 (Milnrow) and J22 (Ripponden) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 17:00 on 5 November 2024.
Nearest town: 12.08 miles from Walk Mill.
Location: eastbound between junctions J22 (Ripponden) and J24 (Huddersfield) .
Lane Closures : Lane one will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 5 November 2024 to 05:00 on 6 November 2024.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 14.54 miles from Walk Mill.
Location: southbound between junction J3 and the M60 .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 21:00 on 5 November 2024 to 06:00 on 7 November 2024.
Nearest town: 17.49 miles from Walk Mill.
Location: southbound between the A680 and the junction with the A681 .
Lane Closures : Lane two is closed.
Due to: Horticultural works.
Period : expect disruption until 05:00 on 5 November 2024.
Lanes Closed : There is one of two lanes closed.
Nearest town: 6.67 miles from Walk Mill.
Location: southbound between the A56 and junction J1 (Ramsbottom) .
Due to: Horticultural works.
Period : expect disruption until 05:00 on 5 November 2024.
Lanes Closed : All lanes are closed.
Nearest town: 7.99 miles from Walk Mill.
Location: southbound entry slip from the A681 .
Due to: Horticultural works.
Period : expect disruption until 05:00 on 5 November 2024.
Lanes Closed : All lanes are closed.
Nearest town: 6.42 miles from Walk Mill.
Location: southbound exit slip to the A676 .
Due to: Horticultural works.
Period : expect disruption until 05:00 on 5 November 2024.
Lanes Closed : All lanes are closed.
Nearest town: 7.96 miles from Walk Mill.
Location: southbound between the A681 and the junction with the M66 .
Due to: Horticultural works.
Period : expect disruption until 05:00 on 5 November 2024.
Lanes Closed : All lanes are closed.
Nearest town: 6.32 miles from Walk Mill.
Location: northbound between the M66 and the junction with the A680 .
Lane Closures : Lane two is closed.
Due to: Horticultural works.
Period : expect disruption until 05:00 on 5 November 2024.
Lanes Closed : There is one of two lanes closed.
Nearest town: 7.96 miles from Walk Mill.
Location: northbound entry slip at junction J1 from M60 clockwise.
Due to: Roadworks.
Period : expect disruption until 06:00 on 5 November 2024.
Lanes Closed : All lanes are closed.
Nearest town: 17.98 miles from Walk Mill.
Location: northbound entry slip at junction J1 from M60 anti-clockwise.
Due to: Roadworks.
Period : expect disruption until 06:00 on 5 November 2024.
Lanes Closed : All lanes are closed.
Nearest town: 17.63 miles from Walk Mill.
Location: anticlockwise between junctions J16 (Salford) and J15 (Bolton) .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 5 November 2024.
Lanes Closed : There is one of four lanes closed.
Nearest town: 17.34 miles from Walk Mill.
Location: clockwise between junctions J13 (Swinton) and J15 (Bolton) .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 5 November 2024.
Lanes Closed : There is one of four lanes closed.
Nearest town: 19.43 miles from Walk Mill.
Location: northbound between the M60 and junction J2 for A666.
Due to: Roadworks.
Period : expect disruption until 06:00 on 5 November 2024.
Lanes Closed : All lanes are closed.
Nearest town: 17.67 miles from Walk Mill.
Location: eastbound entry slip at Hartshead Moor Services.
Due to: Roadworks.
Period : expect disruption until 06:00 on 5 November 2024.
Lanes Closed : All lanes are closed.
Nearest town: 19.44 miles from Walk Mill.
Location: northbound at junction J2 .
Due to: Roadworks.
Period : expect disruption until 06:00 on 5 November 2024.
Lanes Closed : All lanes are closed.
Nearest town: 17.59 miles from Walk Mill.
Location: southbound between junctions J2 (Euroway Trading Est.) and J1 (M62) to M62 West.
Due to: Roadworks scheme.
Period : from 20:11 on 4 November 2024 to 06:00 on 6 November 2024.
Nearest town: 19.51 miles from Walk Mill.
Location: southbound exit slip at junction J1 (M62) to M62 West.
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 5 November 2024 to 06:00 on 6 November 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.83 miles from Walk Mill.
Location: southbound between junctions J2 (Euroway Trading Est.) and J1 (M62) .
Lane Closures : Lane two is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 5 November 2024.
Lanes Closed : There is one of two lanes closed.
Nearest town: 19.51 miles from Walk Mill.
Location: southbound between junctions J30 (Manchester) and J29 (Burnley) .
Lane Closures : Lanes 2 and 3 are closed.
Due to: Road repairs.
Period : expect disruption until 06:00 on 5 November 2024.
Lanes Closed : There are two of three lanes closed.
Nearest town: 18 miles from Walk Mill.
Location: southbound exit slip at junction J28 (Leyland) .
Due to: Road repairs.
Period : expect disruption until 06:00 on 5 November 2024.
Lanes Closed : All lanes are closed.
Nearest town: 19.56 miles from Walk Mill.
Location: westbound exit slip at junction J1 (M6) .
Lane Closures : The hard shoulder is closed.
Due to: Road repairs.
Period : expect disruption until 06:00 on 5 November 2024.
Nearest town: 18.31 miles from Walk Mill.
Location: southbound entry slip at junction J29 (Burnley) .
Due to: Road repairs.
Period : expect disruption until 05:00 on 5 November 2024.
Lanes Closed : All lanes are closed.
Nearest town: 18.62 miles from Walk Mill.
Location: southbound entry slip at junction J29 (Burnley) .
Due to: Road repairs.
Period : expect disruption until 06:00 on 5 November 2024.
Lanes Closed : All lanes are closed.
Nearest town: 18.57 miles from Walk Mill.
Location: eastbound between junctions J9 (Burnley) and J10 (Burnley) .
Lane Closures : The hard shoulder is closed.
Due to: Emergency barrier repairs.
Period : expect disruption until 23:59 on 31 January 2025.
Nearest town: 3.52 miles from Walk Mill.
Location: slip road to the M60 eastbound .
Lane Closures : The hard shoulder is closed.
Due to: Planned Roadworks.
Period : expect disruption until 06:00 on 14 November 2024.
Nearest town: 17.6 miles from Walk Mill.
Location: southbound between junctions J2 and J1 .
Lane Closures : The hard shoulder is closed.
Due to: Planned Roadworks.
Period : expect disruption until 06:00 on 14 November 2024.
Nearest town: 17.57 miles from Walk Mill.
Location: southbound at junction J2 .
Lane Closures : The hard shoulder is closed.
Due to: Planned Roadworks.
Period : expect disruption until 06:00 on 14 November 2024.
Nearest town: 17.55 miles from Walk Mill.
Location: westbound between junctions J10 (Burnley) and J9 (Burnley) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 30 March 2026.
Nearest town: 2.7 miles from Walk Mill.
Location: eastbound between junctions J9 (Burnley) and J10 (Burnley) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 30 March 2026.
Nearest town: 3.9 miles from Walk Mill.
Location: eastbound between junctions J6 (Blackburn) and J10 (Burnley) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 30 March 2026.
Nearest town: 8.54 miles from Walk Mill.
Location: eastbound between junctions J1 (M6) and J2 (Manchester) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 30 March 2026.
Nearest town: 18.31 miles from Walk Mill.
Location: eastbound between junctions J1A (Preston) and J1 (M6) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 30 March 2026.
Nearest town: 19.06 miles from Walk Mill.
Location: westbound between junctions J4 (Blackburn) and J3 (Blackburn) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 30 March 2026.
Nearest town: 11.36 miles from Walk Mill.
Location: westbound between junctions J6 (Blackburn) and J4 (Blackburn) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 30 March 2026.
Nearest town: 8.71 miles from Walk Mill.
Location: eastbound between junctions J4 (Blackburn) and J5 (Shadsworth) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 30 March 2026.
Nearest town: 11.15 miles from Walk Mill.
Location: eastbound between junctions J3 (Blackburn) and J4 (Blackburn) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 30 March 2026.
Nearest town: 13.85 miles from Walk Mill.
Location: eastbound between junctions J2 (Manchester) and J4 (Blackburn) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 30 March 2026.
Nearest town: 17.63 miles from Walk Mill.
Location: westbound between junctions J4 (Blackburn) and J1A (Preston) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 30 March 2026.
Nearest town: 12.53 miles from Walk Mill.
Location: westbound between junctions J10 (Burnley) and J6 (Blackburn) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 30 March 2026.
Nearest town: 3.94 miles from Walk Mill.
Location: eastbound between junctions J5 (Shadsworth) and J6 (Blackburn) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 30 March 2026.
Nearest town: 10.03 miles from Walk Mill.
Location: eastbound between junctions J3 (Blackburn) and J4 (Blackburn) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 30 March 2026.
Nearest town: 12.39 miles from Walk Mill.
Location: northbound at junction J4 .
Lane Closures : The hard shoulder is closed.
Due to: Emergency barrier repairs.
Period : expect disruption until 23:59 on 30 April 2025.
Nearest town: 18.05 miles from Walk Mill.
Location: southbound exit slip at junction J1 to A580.
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 31 March 2026.
Nearest town: 17.55 miles from Walk Mill.
Location: northbound entry slip at junction J2 from A580.
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 31 March 2026.
Nearest town: 18.63 miles from Walk Mill.
Location: southbound between the M6 and junction J9 .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 31 March 2026.
Nearest town: 17.84 miles from Walk Mill.
Location: northbound between junctions J2 and J9 .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 31 March 2026.
Nearest town: 17.61 miles from Walk Mill.
Location: northbound between junction J9 and the M6 .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 31 March 2026.
Nearest town: 17.4 miles from Walk Mill.
Location: southbound between the M6 and junction J2 .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 31 March 2026.
Nearest town: 17.7 miles from Walk Mill.
Location: northbound between the M60 and junction J2 .
Lane Closures : The hard shoulder is closed.
Due to: Emergency barrier repairs.
Period : expect disruption until 23:59 on 15 November 2024.
Nearest town: 17.67 miles from Walk Mill.
Location: northbound entry slip at junction J1 from M60 anti-clockwise.
Lane Closures : The hard shoulder is closed.
Due to: Emergency barrier repairs.
Period : expect disruption until 23:59 on 15 November 2024.
Nearest town: 17.63 miles from Walk Mill.
Location: The A627M northbound between the junctions with the M62 and the A664 .
Lane Closures : The hard shoulder is closed.
Due to: Horticultural works.
Period : expect disruption until 05:00 on 1 April 2026.
Nearest town: 12.55 miles from Walk Mill.
Location: The A627M southbound between the M62 and the junction with the A663 .
Lane Closures : The hard shoulder is closed.
Due to: Horticultural works.
Period : expect disruption until 05:00 on 1 April 2026.
Nearest town: 12.65 miles from Walk Mill.
Location: The A627M northbound between the A663 and the junction with the A664 .
Lane Closures : The hard shoulder is closed.
Due to: Horticultural works.
Period : expect disruption until 05:00 on 1 April 2026.
Nearest town: 14.92 miles from Walk Mill.
Location: The A627M northbound between the junctions with the A664 and the M62 .
Lane Closures : The hard shoulder is closed.
Due to: Horticultural works.
Period : expect disruption until 05:00 on 1 April 2026.
Nearest town: 13.18 miles from Walk Mill.
Location: eastbound between junctions J20 (Rochdale) and J21 (Milnrow) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 00:00 on 30 March 2026.
Nearest town: 12.41 miles from Walk Mill.
Location: westbound between junctions J22 (Ripponden) and J21 (Milnrow) .
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 08:00 on 6 November 2024 to 18:00 on 6 November 2024.
Nearest town: 11.9 miles from Walk Mill.
Location: anticlockwise between junctions J14 (St Helens) and J13 (Swinton) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 11 November 2024 to 13 November 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 18.8 miles from Walk Mill.
Location: southbound between junction J3 and the M60 .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 21:00 on 13 November 2024 to 06:00 on 16 November 2024.
Nearest town: 17.49 miles from Walk Mill.
Location: slip road to the M60 eastbound .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 13 November 2024 to 16 November 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 17.6 miles from Walk Mill.
Location: southbound between junctions J2 and J1 .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 13 November 2024 to 16 November 2024.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 17.57 miles from Walk Mill.
Location: southbound at junction J2 from A666 to M60.
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 13 November 2024 to 16 November 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 17.59 miles from Walk Mill.
Location: southbound at junction J2 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 13 November 2024 to 16 November 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 17.55 miles from Walk Mill.
Location: southbound between junctions J3 and J2 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 13 November 2024 to 16 November 2024.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 17.49 miles from Walk Mill.
Location: northbound between junctions J1 (M62) and J3 (Odsal) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 11 November 2024 to 13 November 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 19.42 miles from Walk Mill.
Location: westbound.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 11 November 2024 to 13 November 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 4.72 miles from Walk Mill.
Location: southbound entry slip from the A679 .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 11 November 2024 to 13 November 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 4.76 miles from Walk Mill.
Location: southbound between the M65 and the junction with the A680 .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 11 November 2024 to 13 November 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 4.79 miles from Walk Mill.
Location: southbound.
Lane Closures : Lane two will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 11 November 2024 to 13 November 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 18.96 miles from Walk Mill.
Location: southbound.
Lane Closures : Lane one will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 11 November 2024 to 13 November 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.01 miles from Walk Mill.
Location: northbound between the A680 Haslingden North and the junction with the M65 .
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 11 November 2024 to 13 November 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 5.47 miles from Walk Mill.
Location: The A627M southbound between the A664 and the junction with the A663 .
Lane Closures : Lane two will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 11 November 2024 to 13 November 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 14.26 miles from Walk Mill.
Location: The A627M northbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 6 December 2024 to 06:00 on 7 December 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 9 December 2024 to 14 December 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 16 December 2024 to 21 December 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 11.67 miles from Walk Mill.
Location: The A627M northbound.
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 6 December 2024 to 06:00 on 7 December 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 9 December 2024 to 14 December 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 16 December 2024 to 21 December 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 12.55 miles from Walk Mill.
Location: The A627M northbound between the junctions with the M62 and the A664 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 6 January 2025 to 11 January 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 13 January 2025 to 18 January 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 20 January 2025 to 25 January 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 27 January 2025 to 1 February 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 12.55 miles from Walk Mill.
Location: The A627M southbound.
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 6 December 2024 to 06:00 on 29 March 2025.
Nearest town: 11.67 miles from Walk Mill.
Location: The A627M southbound.
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 6 January 2025 to 11 January 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 13 January 2025 to 18 January 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 20 January 2025 to 25 January 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 27 January 2025 to 1 February 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 11.67 miles from Walk Mill.
Location: The A627M southbound between the M62 and the junction with the A663 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 6 January 2025 to 11 January 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 13 January 2025 to 18 January 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 20 January 2025 to 25 January 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 27 January 2025 to 1 February 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 12.65 miles from Walk Mill.
Location: The A627M northbound between the A663 and the junction with the A664 .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 11 November 2024 to 16 November 2024.
Schedule : From 20:00 on 18 November 2024 to 06:00 on 19 November 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 21 November 2024 to 23 November 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 27 November 2024 to 30 November 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 14.73 miles from Walk Mill.
Location: The A627M northbound between the A663 and the junction with the A664 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 6 January 2025 to 11 January 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 13 January 2025 to 18 January 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 20 January 2025 to 25 January 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 27 January 2025 to 1 February 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 14.73 miles from Walk Mill.
Location: The A627M northbound at the junction with the A663 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 11 November 2024 to 16 November 2024.
Schedule : From 20:00 on 18 November 2024 to 06:00 on 19 November 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 21 November 2024 to 23 November 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 27 November 2024 to 30 November 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 14.92 miles from Walk Mill.
Location: The A627M northbound.
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 2 December 2024 to 7 December 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 9 December 2024 to 11 December 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 13.5 miles from Walk Mill.
Location: The A627M northbound entry slip from the A663 .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 11 November 2024 to 16 November 2024.
Schedule : From 20:00 on 18 November 2024 to 06:00 on 19 November 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 21 November 2024 to 23 November 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 27 November 2024 to 30 November 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 14.77 miles from Walk Mill.
Location: The A627M northbound exit slip to the A664 .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 11 November 2024 to 16 November 2024.
Schedule : From 20:00 on 18 November 2024 to 06:00 on 19 November 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 21 November 2024 to 23 November 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 27 November 2024 to 30 November 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 13.71 miles from Walk Mill.
Location: northbound between the junctions with the A669 and the A627M .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 11 November 2024 to 16 November 2024.
Schedule : From 20:00 on 18 November 2024 to 06:00 on 19 November 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 21 November 2024 to 23 November 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 27 November 2024 to 30 November 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 15.1 miles from Walk Mill.
Location: The A627M southbound.
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 6 December 2024 to 06:00 on 7 December 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 9 December 2024 to 11 December 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 13.48 miles from Walk Mill.
Location: westbound exit slip at junction J20 (Rochdale) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 11 December 2024 to 14 December 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 16 December 2024 to 21 December 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 12.51 miles from Walk Mill.
Location: The A627M northbound between the A663 and the junction with the M62 .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 11 November 2024 to 06:00 on 29 March 2025.
Nearest town: 14.77 miles from Walk Mill.
Location: The A627M northbound between the junctions with the A664 and the M62 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 6 January 2025 to 11 January 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 13 January 2025 to 18 January 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 20 January 2025 to 25 January 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 27 January 2025 to 1 February 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 13.18 miles from Walk Mill.
Location: eastbound between junctions J22 (Ripponden) and J24 (Huddersfield) .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 05:00 from 11 November 2024 to 14 November 2024.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 14 November 2024 to 16 November 2024.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 12.19 miles from Walk Mill.
Location: eastbound between junctions J21 (Milnrow) and J22 (Ripponden) .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 05:00 from 11 November 2024 to 14 November 2024.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 14 November 2024 to 16 November 2024.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 12.14 miles from Walk Mill.
Location: eastbound entry slip at junction J22 (Ripponden) .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 05:00 from 11 November 2024 to 14 November 2024.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 14 November 2024 to 16 November 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 12.29 miles from Walk Mill.
Location: clockwise between junctions J13 (Swinton) and J15 (Bolton) before J14 (St Helens) access.
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 21:00 on 12 November 2024 to 06:00 on 27 November 2024.
Nearest town: 19.17 miles from Walk Mill.
Location: clockwise at junction J15 (Bolton) before J14 (St Helens) access.
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 12 November 2024 to 06:00 on 13 November 2024.
Schedule : From 21:00 on 15 November 2024 to 06:00 on 16 November 2024.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 25 November 2024 to 27 November 2024.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 17.98 miles from Walk Mill.
Location: clockwise between junctions J13 (Swinton) and J15 (Bolton) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 12 November 2024 to 06:00 on 13 November 2024.
Schedule : From 21:00 on 15 November 2024 to 06:00 on 16 November 2024.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 25 November 2024 to 27 November 2024.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 19.17 miles from Walk Mill.
Location: southbound exit slip at junction J1 to A580.
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 18 November 2024 to 06:00 on 19 November 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 17.55 miles from Walk Mill.
Location: northbound entry slip at junction J1 from M60 clockwise.
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 11 November 2024 to 13 November 2024.
Schedule : From 21:00 on 15 November 2024 to 06:00 on 16 November 2024.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 25 November 2024 to 27 November 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 17.98 miles from Walk Mill.
Location: northbound entry slip at junction J1 from M60 anti-clockwise.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 11 November 2024 to 13 November 2024.
Schedule : From 21:00 on 15 November 2024 to 06:00 on 16 November 2024.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 25 November 2024 to 27 November 2024.
Nearest town: 17.63 miles from Walk Mill.
Location: southbound exit slip at junction J1 to A580.
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 18 November 2024 to 06:00 on 19 November 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 17.53 miles from Walk Mill.
Location: northbound between the M60 and junction J4 .
Lane Closures : Lanes 1, 2, 3 and 4 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 11 November 2024 to 13 November 2024.
Schedule : From 21:00 on 15 November 2024 to 06:00 on 16 November 2024.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 25 November 2024 to 27 November 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 17.65 miles from Walk Mill.
Location: northbound exit slip at junction J4 .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 11 November 2024 to 13 November 2024.
Schedule : From 21:00 on 15 November 2024 to 06:00 on 16 November 2024.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 25 November 2024 to 27 November 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 18.03 miles from Walk Mill.
Location: southbound exit slip at junction J3 .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 11 November 2024 to 06:00 on 19 November 2024.
Nearest town: 17.44 miles from Walk Mill.
Location: southbound exit slip at junction J3 .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 18 November 2024 to 06:00 on 19 November 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 17.44 miles from Walk Mill.
Location: northbound between junctions J1 from M60 anti-clockwise and J3 .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 21:00 on 11 November 2024 to 06:00 on 27 November 2024.
Nearest town: 17.63 miles from Walk Mill.
Location: northbound exit slip at junction J3 .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 18 November 2024 to 06:00 on 19 November 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 17.19 miles from Walk Mill.
Location: southbound between junctions J4 and J2 .
Lane Closures : Lane three will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 11 November 2024 to 06:00 on 12 November 2024.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 17.56 miles from Walk Mill.
Location: southbound between junctions J4 and J2 .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 18 November 2024 to 06:00 on 19 November 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 17.56 miles from Walk Mill.
Location: eastbound at junction J25 (Brighouse) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 20:00 on 10 November 2024 to 05:00 on 11 November 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 19.36 miles from Walk Mill.
Location: eastbound between junctions J24 (Huddersfield) and J25 (Brighouse) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 20:00 on 10 November 2024 to 05:00 on 11 November 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 18.31 miles from Walk Mill.
Location: westbound between the M6 northbound and junction J1 (Preston) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 20:00 on 10 November 2024 to 05:00 on 11 November 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 19.87 miles from Walk Mill.
Location: southbound between junctions J31 (Preston) and J29 (Burnley) .
Lane Closures : Lane four will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 20:00 on 10 November 2024 to 05:00 on 11 November 2024.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 17.46 miles from Walk Mill.
Location: northbound between junctions J31A (Preston) and J32 (Blackpool) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 20:00 on 10 November 2024 to 05:00 on 11 November 2024.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 19.17 miles from Walk Mill.
Location: clockwise between junctions J22 (Oldham) and J23 (Aston under Lyne) .
Lane Closures : Lanes 3 and 4 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 9 November 2024 to 06:00 on 10 November 2024.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 18.57 miles from Walk Mill.
Location: anticlockwise between junctions J23 (Aston under Lyne) and J21 (Oldham) .
Lane Closures : Lanes 3 and 4 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 9 November 2024 to 06:00 on 10 November 2024.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 19.72 miles from Walk Mill.
Location: southbound between junctions J30 (Manchester) and J28 (Leyland) .
Lane Closures : Lane three will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 23:00 on 9 November 2024 to 05:00 on 10 November 2024.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 17.87 miles from Walk Mill.
Location: northbound entry slip at junction J28 (Leyland) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 9 November 2024 to 05:00 on 10 November 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.6 miles from Walk Mill.
Location: northbound entry slip at junction J29 (Burnley) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 9 November 2024 to 05:00 on 10 November 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 18.41 miles from Walk Mill.
Location: northbound between junctions J28 (Leyland) and J30 (Manchester) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 9 November 2024 to 05:00 on 10 November 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 19.58 miles from Walk Mill.
Location: northbound entry slip at junction J1 from M60 clockwise.
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:30 on 8 November 2024 to 06:00 on 9 November 2024.
Schedule : From 23:59 on 9 November 2024 to 06:00 on 10 November 2024.
Schedule : From 21:00 on 10 November 2024 to 06:00 on 11 November 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 17.98 miles from Walk Mill.
Location: clockwise entry slip at junction J13 (Swinton) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 22:30 on 8 November 2024 to 06:00 on 11 November 2024.
Nearest town: 19.57 miles from Walk Mill.
Location: clockwise entry slip at junction J13 (Swinton) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:30 on 8 November 2024 to 06:00 on 9 November 2024.
Schedule : From 23:59 on 9 November 2024 to 06:00 on 10 November 2024.
Schedule : From 21:00 on 10 November 2024 to 06:00 on 11 November 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 19.57 miles from Walk Mill.
Location: eastbound between junctions J24 (Huddersfield) and J25 (Brighouse) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 8 November 2024 to 06:00 on 9 November 2024.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 16.78 miles from Walk Mill.
Location: southbound between junctions J31 (Preston) and J29 (Burnley) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 05:00 from 5 November 2024 to 8 November 2024.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 17.32 miles from Walk Mill.
Location: southbound between junctions J31 (Preston) and J29 (Burnley) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 8 November 2024 to 05:00 on 9 November 2024.
Schedule : From 20:00 on 11 November 2024 to 05:00 on 12 November 2024.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 17.37 miles from Walk Mill.
Location: southbound entry slip at junction J31 (Preston) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 05:00 from 5 November 2024 to 8 November 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 17.14 miles from Walk Mill.
Location: northbound exit slip at junction J31 (Preston) .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 6 November 2024 to 05:00 on 7 November 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 17.25 miles from Walk Mill.
Location: westbound between junctions J24 (Huddersfield) and J22 (Ripponden) .
Lane Closures : Lane one is closed.
Due to: Horticultural works.
Period : expect disruption until 05:00 on 6 November 2024.
Lanes Closed : There is one of three lanes closed.
Nearest town: 13.17 miles from Walk Mill.
Location: southbound between the A680 and the junction with the A681 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 7 November 2024 to 9 November 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 5.55 miles from Walk Mill.
Location: northbound exit slip to the A681 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 7 November 2024 to 9 November 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 6.37 miles from Walk Mill.
Location: northbound between the A680 and the junction with the A680 Haslingden North .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 21:00 on 7 November 2024 to 05:00 on 9 November 2024.
Nearest town: 6.53 miles from Walk Mill.
Location: northbound between the M66 and the junction with the A680 Haslingden South .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 7 November 2024 to 9 November 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 6.96 miles from Walk Mill.
Location: northbound between the A680 Haslingden South and the junction with the A680 Haslingden North .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 7 November 2024 to 9 November 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 6.34 miles from Walk Mill.
Location: northbound entry slip from the A680 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 7 November 2024 to 9 November 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 6.53 miles from Walk Mill.
Location: The A627M southbound between the M62 and the junction with the A664 .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 7 November 2024 to 06:00 on 8 November 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 12.65 miles from Walk Mill.
Location: The A627M southbound exit slip to the A664 .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 7 November 2024 to 06:00 on 8 November 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 13.22 miles from Walk Mill.
Location: westbound between junctions J26 (M606 Bradford) and J25 (Brighouse) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 7 November 2024 to 06:00 on 8 November 2024.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 19.75 miles from Walk Mill.
Location: eastbound entry slip at Hartshead Moor Services.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 7 November 2024 to 06:00 on 8 November 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 19.44 miles from Walk Mill.
Location: westbound between junctions J21 (Milnrow) and J20 (Rochdale) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 7 November 2024 to 06:00 on 8 November 2024.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 12.48 miles from Walk Mill.
Location: The A627M northbound between the A627 and the junction with the A664 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 7 November 2024 to 06:00 on 8 November 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 14.17 miles from Walk Mill.
Location: The A627M northbound entry slip from the A664 .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 7 November 2024 to 06:00 on 8 November 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 13.44 miles from Walk Mill.
Location: The A627M northbound between the A664 and the junction with the M62 .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 7 November 2024 to 06:00 on 8 November 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 13.64 miles from Walk Mill.
Location: westbound exit slip at junction J20 (Rochdale) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 7 November 2024 to 06:00 on 8 November 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 12.51 miles from Walk Mill.
Location: southbound exit slip at junction J1 (M62) to M62 West.
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 7 November 2024 to 06:00 on 8 November 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.83 miles from Walk Mill.
Location: eastbound between junctions J25 (Brighouse) and J26 (M606 Bradford) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 7 November 2024 to 06:00 on 8 November 2024.
Nearest town: 19.72 miles from Walk Mill.
Location: eastbound between junctions J25 (Brighouse) and J26 (M606 Bradford) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 7 November 2024 to 06:00 on 8 November 2024.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 19.72 miles from Walk Mill.
Location: westbound at junction J5 (Shadsworth) .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 08:00 on 7 November 2024 to 17:00 on 8 November 2024.
Nearest town: 9.94 miles from Walk Mill.
Location: westbound entry slip at junction J5 (Shadsworth) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 23:45 on 6 November 2024 to 05:00 on 7 November 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 9.89 miles from Walk Mill.
Location: westbound between junctions J5 (Shadsworth) and J4 (Blackburn) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 23:45 on 6 November 2024 to 05:00 on 7 November 2024.
Nearest town: 9.89 miles from Walk Mill.
Location: westbound between junctions J5 (Shadsworth) and J4 (Blackburn) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 23:45 on 6 November 2024 to 05:00 on 7 November 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 9.89 miles from Walk Mill.
Location: The A627M southbound exit slip to the A627 .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 6 November 2024 to 06:00 on 7 November 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 14.51 miles from Walk Mill.
Location: eastbound between junctions J21 (Milnrow) and J22 (Ripponden) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 6 November 2024 to 05:00 on 7 November 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 12.08 miles from Walk Mill.
Location: eastbound between junctions J21 (Milnrow) and J22 (Ripponden) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 6 November 2024 to 05:00 on 7 November 2024.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 11.92 miles from Walk Mill.
Location: anticlockwise exit slip at junction J17 (Prestwich) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 6 November 2024 to 06:00 on 7 November 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 15.81 miles from Walk Mill.
Location: anticlockwise entry slip at junction J18 (Leeds) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 6 November 2024 to 06:00 on 7 November 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 15.13 miles from Walk Mill.
Location: anticlockwise exit slip at junction J18 (Leeds) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 6 November 2024 to 06:00 on 7 November 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 15.23 miles from Walk Mill.
Location: anticlockwise exit slip at junction J18 (Leeds) to roundabout.
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 6 November 2024 to 06:00 on 7 November 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 15.17 miles from Walk Mill.
Location: westbound between junctions J19 (Middleton) and J18 (M60) .
Lane Closures : Lanes 2, 3 and 4 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 6 November 2024 to 06:00 on 7 November 2024.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 14.01 miles from Walk Mill.
Location: eastbound between junctions J22 (Ripponden) and J24 (Huddersfield) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 6 November 2024 to 05:00 on 7 November 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 12.95 miles from Walk Mill.
Location: eastbound between junctions J20 (Rochdale) and J22 (Ripponden) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 12 November 2024 to 05:00 on 13 November 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 12.44 miles from Walk Mill.
Location: eastbound between junctions J21 (Milnrow) and J22 (Ripponden) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 12 November 2024 to 05:00 on 13 November 2024.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 11.92 miles from Walk Mill.
Location: southbound exit slip to the A681 .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 5 November 2024 to 7 November 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 6.63 miles from Walk Mill.
Location: southbound between the A680 and the junction with the A681 .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 5 November 2024 to 7 November 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 5.5 miles from Walk Mill.
Location: southbound between the junctions with the A679 and the A680 .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 5 November 2024 to 7 November 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 5.37 miles from Walk Mill.
Location: southbound.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 5 November 2024 to 7 November 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 6.65 miles from Walk Mill.
Location: northbound between the M66 and the junction with the A680 Haslingden North .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 5 November 2024 to 7 November 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 6.88 miles from Walk Mill.
Location: westbound at junction J25 (Brighouse) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 12 November 2024 to 14 November 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 19.67 miles from Walk Mill.
Location: westbound between junctions J26 (M606 Bradford) and J25 (Brighouse) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 11 November 2024 to 06:00 on 14 November 2024.
Nearest town: 19.47 miles from Walk Mill.
Location: westbound at junction J25 (Brighouse) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 11 November 2024 to 06:00 on 12 November 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 19.67 miles from Walk Mill.
Location: westbound between junctions J26 (M606 Bradford) and J25 (Brighouse) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 11 November 2024 to 06:00 on 12 November 2024.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 19.47 miles from Walk Mill.
Location: westbound between junctions J26 (M606 Bradford) and J25 (Brighouse) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 12 November 2024 to 14 November 2024.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 19.47 miles from Walk Mill.
Location: westbound between the M6 northbound and junction J1 (Preston) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 20:00 on 12 November 2024 to 06:00 on 13 November 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 19.87 miles from Walk Mill.
Location: northbound between junctions J29 (Burnley) and J32 (Blackpool) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 20:00 on 6 November 2024 to 06:00 on 7 November 2024.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 17.63 miles from Walk Mill.
Location: northbound between junctions J29 (Burnley) and J31 (Preston) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 20:00 on 5 November 2024 to 06:00 on 6 November 2024.
Schedule : From 20:00 on 13 November 2024 to 06:00 on 14 November 2024.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 17.64 miles from Walk Mill.
Location: northbound at junction J32 (Blackpool) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 20:00 on 12 November 2024 to 06:00 on 13 November 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 19.87 miles from Walk Mill.
Location: northbound between junctions J31 (Preston) and J32 (Blackpool) .
Lane Closures : Lane one will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 20:00 on 7 November 2024 to 06:00 on 8 November 2024.
Schedule : From 20:00 on 15 November 2024 to 06:00 on 16 November 2024.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 17.74 miles from Walk Mill.
Location: northbound between junctions J29 (Burnley) and J32 (Blackpool) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 20:00 on 14 November 2024 to 06:00 on 15 November 2024.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 17.91 miles from Walk Mill.
Location: northbound between junctions J31A (Preston) and J32 (Blackpool) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 20:00 on 12 November 2024 to 06:00 on 13 November 2024.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 19.22 miles from Walk Mill.
Location: westbound between junctions J25 (Brighouse) and J24 (Huddersfield) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 5 November 2024 to 06:00 on 6 November 2024.
Schedule : From 20:00 on 6 November 2024 to 05:00 on 7 November 2024.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 18.03 miles from Walk Mill.
Location: eastbound exit slip at junction J26 (M606 Bradford) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 5 November 2024 to 9 November 2024.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 11 November 2024 to 16 November 2024.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 18 November 2024 to 23 November 2024.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 25 November 2024 to 29 November 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.91 miles from Walk Mill.
Location: northbound entry slip at junction J1 (M62) from roundabout.
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 5 November 2024 to 9 November 2024.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 11 November 2024 to 16 November 2024.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 18 November 2024 to 23 November 2024.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 25 November 2024 to 29 November 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.94 miles from Walk Mill.
Location: anticlockwise at junction J14 (St Helens) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 00:30 on 8 November 2024 to 06:00 on 8 November 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 17.63 miles from Walk Mill.
Location: anticlockwise between junctions J16 (Salford) and J15 (Bolton) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 00:30 on 8 November 2024 to 06:00 on 8 November 2024.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 17.4 miles from Walk Mill.
Location: northbound entry slip at junction J1 from M60 anti-clockwise.
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 00:30 on 8 November 2024 to 06:00 on 8 November 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 17.63 miles from Walk Mill.
Location: eastbound between junctions J19 (Middleton) and J20 (Rochdale) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 00:30 on 8 November 2024 to 06:00 on 8 November 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 12.85 miles from Walk Mill.
Location: eastbound at junction J19 (Middleton) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 00:30 on 8 November 2024 to 06:00 on 8 November 2024.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 13.15 miles from Walk Mill.
Location: eastbound between junctions J19 (Middleton) and J20 (Rochdale) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 18 November 2024 to 06:00 on 19 November 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 12.76 miles from Walk Mill.
Location: westbound entry slip at junction J19 (Middleton) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 20 November 2024 to 06:00 on 21 November 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 13.2 miles from Walk Mill.
Location: eastbound between junctions J18 (M60) and J19 (Middleton) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 12 November 2024 to 06:00 on 13 November 2024.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 14.64 miles from Walk Mill.
Location: westbound entry slip at junction J20 (Rochdale) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 8 November 2024 to 06:00 on 9 November 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 12.65 miles from Walk Mill.
Location: westbound between junctions J20 (Rochdale) and J19 (Middleton) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 8 November 2024 to 06:00 on 9 November 2024.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 12.58 miles from Walk Mill.
Location: westbound at junction J20 (Rochdale) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 8 November 2024 to 06:00 on 9 November 2024.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 12.63 miles from Walk Mill.
Location: eastbound between junctions J18 (M60) and J19 (Middleton) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 23:59 on 11 November 2024 to 06:00 on 12 November 2024.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 14.64 miles from Walk Mill.
Location: eastbound between junctions J19 (Middleton) and J20 (Rochdale) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 23:59 on 6 November 2024 to 06:00 on 7 November 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 12.85 miles from Walk Mill.
Location: eastbound at junction J19 (Middleton) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 23:59 on 6 November 2024 to 06:00 on 7 November 2024.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 13.15 miles from Walk Mill.
Location: eastbound between junctions J18 (M60) and J19 (Middleton) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 13 November 2024 to 06:00 on 14 November 2024.
Schedule : From 23:59 on 14 November 2024 to 06:00 on 15 November 2024.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 14.18 miles from Walk Mill.
Location: westbound entry slip at Birch Services.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 23:59 on 11 November 2024 to 06:00 on 12 November 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 13.81 miles from Walk Mill.
Location: westbound exit slip at Birch Services.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 23:59 on 11 November 2024 to 06:00 on 12 November 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 13.61 miles from Walk Mill.
Location: eastbound exit slip at junction J19 (Middleton) .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 23:59 on 14 November 2024 to 06:00 on 15 November 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 13.28 miles from Walk Mill.
Location: westbound at junction J18 (M60) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 21 November 2024 to 06:00 on 22 November 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 14.9 miles from Walk Mill.
Location: westbound at junction J18 (M60) .
Lane Closures : Lanes 1 and 2 are closed.
Due to: Planned Roadworks.
Period : expect disruption until 06:00 on 12 November 2024.
Lanes Closed : There are two of three lanes closed.
Nearest town: 14.9 miles from Walk Mill.