Location: eastbound between the A286 and the junction with the A285 Chichester.
Due to: Congestion.
Normal traffic conditions are expected between 09:45 and 10:00 on 29 April 2025.
Delay : There are currently delays of 15 minutes against expected traffic.
Nearest town: 11.99 miles from Smithbrook.

Location: eastbound between the junctions with the A286 and the A259 Chichester East.
Due to: Congestion.
Normal traffic conditions are expected between 09:15 and 09:30 on 29 April 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 12.31 miles from Smithbrook.

Location: eastbound between the junctions with the A286 and the A259 Chichester East.
Due to: Congestion.
Normal traffic conditions are expected between 08:45 and 09:00 on 29 April 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 12.31 miles from Smithbrook.

Location: westbound between the junctions with the A259 Chichester East and the A286 .
Due to: Congestion.
Normal traffic conditions are expected between 09:30 and 09:45 on 29 April 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 11.73 miles from Smithbrook.

Location: northbound between the A283 and the junction with the A31 .
Due to: Congestion.
Normal traffic conditions are expected between 09:30 and 09:45 on 29 April 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 15.32 miles from Smithbrook.

Location: westbound between the junctions with the A259 Chichester East and the A286 .
Due to: Congestion.
Normal traffic conditions are expected between 08:45 and 09:00 on 29 April 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 12.31 miles from Smithbrook.

Location: eastbound between the junctions with the A286 and the A259 Chichester East.
Due to: Congestion.
Normal traffic conditions are expected between 07:45 and 08:00 on 29 April 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 12.31 miles from Smithbrook.

Location: westbound between the A280 and the junction with the A284 Arundel East.
Due to: Congestion.
Normal traffic conditions are expected between 07:45 and 08:00 on 29 April 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 12.86 miles from Smithbrook.

Location: northbound between the A325 and the junction with the A283 Milford north.
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 29 April 2025 to 06:00 on 30 April 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 7.55 miles from Smithbrook.

Location: northbound between the junctions with the A272 Petersfield North and the A325 .
Lane Closures : Lane one will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 29 April 2025 to 06:00 on 30 April 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 9.98 miles from Smithbrook.

Location: northbound between the junctions with the A272 Petersfield North and the A325 .
Lane Closures : Lane one will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 29 April 2025 to 06:00 on 30 April 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 9.83 miles from Smithbrook.

Location: southbound between the junctions with the A325 and the A272 Petersfield North.
Lane Closures : Lane one will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 29 April 2025 to 06:00 on 30 April 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 9.96 miles from Smithbrook.

Location: southbound entry slip from the A322 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 29 April 2025 to 05:00 on 30 April 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 17.7 miles from Smithbrook.

Location: westbound between the junctions with the A2025 and the A24 South.
Due to: Roadside Drains Works.
Period : expect disruption until 06:00 on 29 April 2025.
Nearest town: 19.6 miles from Smithbrook.

Location: westbound between the junctions with the A24 North and the A280 .
Due to: Roadworks.
Period : expect disruption until 05:00 on 29 April 2025.
Nearest town: 16.7 miles from Smithbrook.

Location: eastbound between the junctions with the A24 South and the A2025 .
Due to: Roadside Drains Works.
Period : expect disruption until 06:00 on 29 April 2025.
Nearest town: 19.47 miles from Smithbrook.

Location: eastbound between the junctions with the A280 and the A24 North.
Due to: Roadworks.
Period : expect disruption until 05:00 on 29 April 2025.
Nearest town: 16.6 miles from Smithbrook.

Location: northbound.
Due to: Roadside Drains Works.
Period : expect disruption until 05:30 on 29 April 2025.
Lanes Closed : All lanes are closed.
Nearest town: 9.69 miles from Smithbrook.

Location: northbound between the A272 Petersfield North and the junction with the A325 .
Lane Closures : Lane one is closed.
Due to: Roadside Drains Works.
Period : expect disruption until 06:00 on 29 April 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 9.84 miles from Smithbrook.

Location: northbound.
Due to: Roadside Drains Works.
Period : expect disruption until 05:30 on 29 April 2025.
Lanes Closed : All lanes are closed.
Nearest town: 9.74 miles from Smithbrook.

Location: westbound between the junctions with the A259 Chichester East and the A286 .
Lane Closures : Lane one is closed.
Due to: Emergency Roadworks.
Period : expect disruption until 06:00 on 29 April 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 12.35 miles from Smithbrook.

Location: eastbound between the junctions with the A286 and the A259 Chichester East.
Lane Closures : Lane one is closed.
Due to: Emergency Roadworks.
Period : expect disruption until 06:00 on 29 April 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 12.4 miles from Smithbrook.

Location: westbound between the junctions with the A259 Chichester East and the A286 .
Lane Closures : Lane one is closed.
Due to: Emergency Roadworks.
Period : expect disruption until 06:00 on 29 April 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 12.43 miles from Smithbrook.

Location: westbound between the A2025 and the junction with the A24 South.
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 5 May 2025 to 7 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.04 miles from Smithbrook.

Location: The A3M northbound exit slip at junction J3 .
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 5 May 2025 to 06:00 on 6 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 16.59 miles from Smithbrook.

Location: The A3M northbound between junctions J4 and J3 .
Lane Closures : Lane one will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 20:00 on 5 May 2025 to 06:00 on 6 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 16.82 miles from Smithbrook.

Location: The A3M southbound at junction J5 .
Lane Closures : Lane two will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 April 2025 to 3 May 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 13 May 2025 to 17 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 17.3 miles from Smithbrook.

Location: eastbound exit slip to the A3M .
Lane Closures : Lane one will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 April 2025 to 3 May 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 13 May 2025 to 17 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 17.8 miles from Smithbrook.

Location: eastbound between the junctions with the A2030 and the A3M .
Lane Closures : Lane one will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 April 2025 to 3 May 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 13 May 2025 to 17 May 2025.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 18.28 miles from Smithbrook.

Location: The A3M southbound between junctions J3 and J5 .
Lane Closures : Lane two will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 April 2025 to 3 May 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 13 May 2025 to 17 May 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 17.13 miles from Smithbrook.

Location: The A3M northbound at junction J5 .
Lane Closures : Lane one will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 April 2025 to 3 May 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 13 May 2025 to 17 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 17.54 miles from Smithbrook.

Location: The A3M southbound between junctions J3 and J4 .
Lane Closures : Lane two will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 April 2025 to 3 May 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 13 May 2025 to 17 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 16.36 miles from Smithbrook.

Location: The A3M northbound between junctions J4 and J3 .
Lane Closures : Lane one will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 April 2025 to 3 May 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 13 May 2025 to 17 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 17.09 miles from Smithbrook.

Location: The A3M northbound between junctions J5 and J4 .
Lane Closures : Lane one will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 April 2025 to 3 May 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 13 May 2025 to 17 May 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 17.3 miles from Smithbrook.

Location: southbound between the junctions with the A272 Petersfield South and the A3M .
Lane Closures : Lane two will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 20:00 on 30 April 2025 to 06:00 on 1 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 11.4 miles from Smithbrook.

Location: northbound between the A3M and the junction with the A272 Petersfield South.
Lane Closures : Lane two will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 20:00 on 30 April 2025 to 06:00 on 1 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 12.52 miles from Smithbrook.

Location: northbound.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 21:30 on 2 May 2025 to 06:00 on 3 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 10.23 miles from Smithbrook.

Location: northbound between the A333 and the junction with the A283 Milford north.
Lane Closures : Lane one will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 2 May 2025 to 06:00 on 3 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 9.41 miles from Smithbrook.

Location: northbound entry slip from the A31 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 1 May 2025 to 06:00 on 2 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 16.09 miles from Smithbrook.

Location: westbound between the junctions with the A29 South and the A285 Halnaker.
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 1 May 2025 to 06:00 on 2 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 10.06 miles from Smithbrook.

Location: westbound at the junction with the A29 South.
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 1 May 2025 to 06:00 on 2 May 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 10.06 miles from Smithbrook.

Location: westbound between the junctions with the A29 North and the A29 South.
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 1 May 2025 to 06:00 on 2 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 10.03 miles from Smithbrook.

Location: eastbound between the A285 Halnaker and the junction with the A29 North.
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 1 May 2025 to 06:00 on 2 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 9.89 miles from Smithbrook.

Location: northbound.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 21:30 on 30 April 2025 to 06:00 on 1 May 2025.
Schedule : From 21:00 on 1 May 2025 to 06:00 on 2 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 7.56 miles from Smithbrook.

Location: northbound.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 21:30 on 30 April 2025 to 06:00 on 1 May 2025.
Schedule : From 21:00 on 1 May 2025 to 06:00 on 2 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 7.6 miles from Smithbrook.

Location: northbound.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 21:30 on 30 April 2025 to 06:00 on 1 May 2025.
Schedule : From 21:00 on 1 May 2025 to 06:00 on 2 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 7.55 miles from Smithbrook.

Location: northbound between the A325 and the junction with the A333 .
Lane Closures : Lane one will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 30 April 2025 to 2 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 8.39 miles from Smithbrook.

Location: northbound.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 21:30 on 30 April 2025 to 06:00 on 1 May 2025.
Schedule : From 21:00 on 1 May 2025 to 06:00 on 2 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 7.47 miles from Smithbrook.

Location: westbound between the junctions with the A284 Arundel West and the A29 North.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 29 April 2025 to 1 May 2025.
Nearest town: 10.98 miles from Smithbrook.

Location: eastbound between the junctions with the A29 North and the A284 Arundel West .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 29 April 2025 to 1 May 2025.
Nearest town: 10.93 miles from Smithbrook.

Location: westbound between the A24 North and the junction with the A280 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 April 2025 to 2 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 16.11 miles from Smithbrook.

Location: eastbound exit slip to the A280 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 April 2025 to 2 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 14.95 miles from Smithbrook.

Location: eastbound entry slip from the A280 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 28 April 2025 to 2 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 15.13 miles from Smithbrook.

Location: westbound entry slip from the A3023 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 2 May 2025 to 06:00 on 3 May 2025.
Schedule : From 21:00 on 6 May 2025 to 06:00 on 7 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 16.53 miles from Smithbrook.

Location: westbound exit slip to the A3023 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 30 April 2025 to 2 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 16.37 miles from Smithbrook.

Location: westbound exit slip to the A259 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 30 April 2025 to 2 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 15.63 miles from Smithbrook.

Location: westbound entry slip from the A259 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 30 April 2025 to 2 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 15.83 miles from Smithbrook.

Location: westbound exit slip to the A3M .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 2 May 2025 to 06:00 on 3 May 2025.
Schedule : From 21:00 on 6 May 2025 to 06:00 on 7 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 17.15 miles from Smithbrook.

Location: westbound between the A3023 and the junction with the A3M .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 21:00 on 30 April 2025 to 06:00 on 7 May 2025.
Nearest town: 16.53 miles from Smithbrook.

Location: westbound exit slip to the A2030 .
Lane Closures : Lane one will be closed.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 20 June 2025 to 06:00 on 21 June 2025.
Schedule : From 20:00 on 23 June 2025 to 06:00 on 24 June 2025.
Schedule : From 20:00 on 15 August 2025 to 06:00 on 16 August 2025.
Schedule : From 20:00 on 18 August 2025 to 06:00 on 19 August 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 18.82 miles from Smithbrook.

Location: westbound at junction J12 (Cosham) .
Lane Closures : Lane one will be closed.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 18 June 2025 to 20 June 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 13 August 2025 to 15 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 22 October 2025 to 24 October 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 10 December 2025 to 12 December 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 19.79 miles from Smithbrook.