Location: westbound entry slip from the A1089 .
Due to: Roadworks.
Period : from 21:36 on 21 November 2024 to 05:00 on 22 November 2024.
Lanes Closed : All lanes are closed.
Nearest town: 19.45 miles from Scrapsgate.
Location: northbound.
Due to: Roadworks.
Period : from 20:51 on 21 November 2024 to 05:00 on 22 November 2024.
Lanes Closed : All lanes are closed.
Nearest town: 6.55 miles from Scrapsgate.
From
Location: The M2 westbound between junctions J2 and J1 .
To
Location: westbound between the M2 and the junction with the A227 .
Due to: Roadworks.
Period : from 20:40 on 21 November 2024 to 05:00 on 22 November 2024.
Lanes Closed : All lanes are closed.
Nearest town: 14.4 miles from Scrapsgate.
Location: westbound between the junctions with the A1089 and the A1012 .
Lane Closures : Lane three will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 23:00 on 22 November 2024 to 05:00 on 23 November 2024.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 19.95 miles from Scrapsgate.
Location: westbound between the A1089 and the junction with the A1012 .
Lane Closures : Lane three will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 23:00 on 22 November 2024 to 05:00 on 23 November 2024.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 19.11 miles from Scrapsgate.
Location: northbound between the M2 and the junction with the A2500 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 23:00 on 22 November 2024 to 23:00 on 23 November 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 8.87 miles from Scrapsgate.
Location: southbound between the junctions with the A2500 and the M2 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 23:00 on 22 November 2024 to 23:00 on 23 November 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 8 miles from Scrapsgate.
Location: eastbound between junctions J1 (Rochester) and J2 (Strood) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 22 November 2024 to 06:00 on 23 November 2024.
Nearest town: 15.11 miles from Scrapsgate.
Location: eastbound between junctions J1 (Rochester) and J2 (Strood) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 22 November 2024 to 06:00 on 23 November 2024.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 14.76 miles from Scrapsgate.
Location: eastbound at junction J1 (Rochester) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 22 November 2024 to 06:00 on 23 November 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 15.11 miles from Scrapsgate.
Location: westbound between the A28 and the junction with the M2 .
Lane Closures : Lane two is closed.
Due to: Horticultural works.
Period : expect disruption until 06:00 on 22 November 2024.
Lanes Closed : There is one of two lanes closed.
Nearest town: 16.27 miles from Scrapsgate.
Location: eastbound between the M2 and the junction with the A28 .
Lane Closures : Lane two is closed.
Due to: Horticultural works.
Period : expect disruption until 06:00 on 22 November 2024.
Lanes Closed : There is one of two lanes closed.
Nearest town: 13.43 miles from Scrapsgate.
Location: eastbound at junction J3 (Maidstone) .
Lane Closures : Lane one will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 22 November 2024 to 06:00 on 23 November 2024.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 13.78 miles from Scrapsgate.
Location: eastbound exit slip at junction J3 (Maidstone) .
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 22 November 2024 to 06:00 on 23 November 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 13.78 miles from Scrapsgate.
Location: northbound between the junctions with the A126 Grays and the A13 .
Lane Closures : Lane two is closed.
Due to: Horticultural works.
Period : expect disruption until 05:30 on 22 November 2024.
Lanes Closed : There is one of two lanes closed.
Nearest town: 18.98 miles from Scrapsgate.
Location: northbound between the junctions with the A126 Grays and the A13 .
Due to: Horticultural works.
Period : expect disruption until 05:30 on 22 November 2024.
Lanes Closed : All lanes are closed.
Nearest town: 19.28 miles from Scrapsgate.
Location: eastbound entry slip from the A1089 .
Due to: Horticultural works.
Period : expect disruption until 05:30 on 22 November 2024.
Lanes Closed : All lanes are closed.
Nearest town: 19.33 miles from Scrapsgate.
Location: eastbound between junctions J4 (West Malling) and J5 (Aylesford) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 22 November 2024 to 06:00 on 23 November 2024.
Schedule : From 20:00 on 26 November 2024 to 06:00 on 27 November 2024.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 17.6 miles from Scrapsgate.
Location: eastbound exit slip to the A1089 .
Lane Closures : Lane one will be closed.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 23:00 on 22 November 2024 to 06:00 on 23 November 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.29 miles from Scrapsgate.
Location: westbound exit slip to the A1089 .
Lane Closures : Lane one will be closed.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 23:00 on 22 November 2024 to 06:00 on 23 November 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.11 miles from Scrapsgate.
Location: southbound between the junctions with the A13 and the A126 Grays.
Lane Closures : Lane one will be closed.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 23:00 on 22 November 2024 to 06:00 on 23 November 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.23 miles from Scrapsgate.
Location: southbound between the A2500 and the junction with the M2 .
Due to: Emergency roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 22 November 2024 to 06:00 on 23 November 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 6.31 miles from Scrapsgate.
Location: northbound between the M2 and the junction with the A2500 .
Lane Closures : Lane two will be closed.
Due to: Emergency roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 22 November 2024 to 06:00 on 23 November 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 9.1 miles from Scrapsgate.
Location: westbound between junctions J10 (Ashford) and J8 (Maidstone) .
Due to: Roadworks scheme.
Period : from 20:05 on 21 November 2024 to 06:00 on 29 November 2024.
Nearest town: 19.59 miles from Scrapsgate.
Location: westbound between junctions J7 (Maidstone) and J4 (West Malling) .
Due to: Roadworks.
Period : from 15:08 on 6 November 2024 to 06:00 on 30 November 2024.
Nearest town: 14.05 miles from Scrapsgate.
Location: westbound exit slip at junction J5 (Aylesford) .
Due to: Roadworks scheme.
Period : from 15:07 on 6 November 2024 to 06:00 on 30 November 2024.
Nearest town: 15.93 miles from Scrapsgate.
Location: eastbound between junctions J4 (West Malling) and J5 (Aylesford) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 22 November 2024 to 06:00 on 27 November 2024.
Nearest town: 17.87 miles from Scrapsgate.
Location: southbound.
Due to: Roadworks.
Period : expect disruption until 20:00 on 7 March 2025.
Lanes Closed : All lanes are closed.
Nearest town: 4.76 miles from Scrapsgate.
Location: westbound at junction J6 (Maidstone) .
Due to: Roadworks.
Period : from 03:09 on 28 July 2024 to 06:00 on 28 November 2024.
Lanes Closed : All lanes are closed.
Nearest town: 15.07 miles from Scrapsgate.
Location: southbound between the A250 Queenborough and the junction with the A2 .
Due to: Roadworks scheme.
Period : from 20:04 on 2 January 2024 to 06:00 on 15 January 2025.
Nearest town: 1.91 miles from Scrapsgate.
Location: The junction of the A249 and the A2500 .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 15 January 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 1.88 miles from Scrapsgate.
Location: southbound.
Due to: Roadworks.
Period : expect disruption until 06:00 on 15 January 2025.
Lanes Closed : All lanes are closed.
Nearest town: 4.76 miles from Scrapsgate.
Location: southbound between the A250 Queenborough and the junction with the A2 .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 15 January 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 1.91 miles from Scrapsgate.
Location: northbound between the A2 and the junction with the A2500 .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 15 January 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Lanes Closed : There is one of two lanes closed.
Nearest town: 6.17 miles from Scrapsgate.
Location: westbound between junctions J4 (Gillingham) and J3 (Maidstone) .
Lane Closures : Lane one will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 20:00 on 28 November 2024 to 06:00 on 29 November 2024.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 11.56 miles from Scrapsgate.
Location: eastbound between junctions J8 (Maidstone) and J9 (Ashford) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 28 November 2024 to 30 November 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 2 December 2024 to 4 December 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 15.59 miles from Scrapsgate.
Location: westbound entry slip at junction J4 (Gillingham) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 20:00 on 28 November 2024 to 06:00 on 29 November 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 11.06 miles from Scrapsgate.
Location: westbound between junctions J5 (Maidstone) and J4 (Gillingham) .
Lane Closures : Lane one will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 20:00 on 28 November 2024 to 06:00 on 29 November 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 10.5 miles from Scrapsgate.
Location: eastbound between the junctions with the A28 and the A2050 Canterbury South.
Lane Closures : Lane one will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 28 November 2024 to 06:00 on 29 November 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 16.75 miles from Scrapsgate.
Location: eastbound between junctions J8 (Maidstone) and J10 (Ashford) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 25 November 2024 to 29 November 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 16.87 miles from Scrapsgate.
Location: westbound between junctions J9 (Ashford) and J8 (Maidstone) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 24 November 2024 to 06:00 on 25 November 2024.
Schedule : From 20:00 on 28 November 2024 to 06:00 on 29 November 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 14.64 miles from Scrapsgate.
Location: westbound between junctions J10 (Ashford) and J8 (Maidstone) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 25 November 2024 to 06:00 on 26 November 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 19.59 miles from Scrapsgate.
Location: westbound between junctions J9 (Ashford) and J8 (Maidstone) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 27 November 2024 to 06:00 on 28 November 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 15.64 miles from Scrapsgate.
Location: westbound between the A1089 and the junction with the A1012 .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 22:00 on 26 November 2024 to 05:00 on 27 November 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 19.11 miles from Scrapsgate.
Location: westbound between the A2050 Canterbury South and the junction with the A28 .
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 26 November 2024 to 06:00 on 27 November 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 18.46 miles from Scrapsgate.
Location: eastbound between the A2050 Canterbury West and the junction with the A2050 Canterbury South.
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 26 November 2024 to 06:00 on 27 November 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 15.64 miles from Scrapsgate.
Location: westbound between the A227 and the junction with the A2260 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 26 November 2024 to 06:00 on 27 November 2024.
Nearest town: 19.48 miles from Scrapsgate.
Location: westbound between the A1089 and the junction with the A1012 .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 25 November 2024 to 05:00 on 26 November 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 19.11 miles from Scrapsgate.
Location: eastbound between junctions J4 (West Malling) and J5 (Aylesford) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 25 November 2024 to 06:00 on 26 November 2024.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 17.52 miles from Scrapsgate.
Location: eastbound entry slip at junction J4 (West Malling) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 25 November 2024 to 06:00 on 26 November 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 17.8 miles from Scrapsgate.
Location: westbound between the A260 and the junction with the A28 .
Lane Closures : Lane one will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 25 November 2024 to 06:00 on 26 November 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.32 miles from Scrapsgate.
Location: eastbound between the M2 and the junction with the A28 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 25 November 2024 to 06:00 on 26 November 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 13.21 miles from Scrapsgate.
Location: westbound between junctions J9 (Ashford) and J8 (Maidstone) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 05:00 from 22 November 2024 to 25 November 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 19.23 miles from Scrapsgate.
Location: westbound exit slip at junction J7 (Maidstone) .
Lane Closures : Lane one will be closed.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 05:00 from 22 November 2024 to 24 November 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 14.23 miles from Scrapsgate.
Location: eastbound.
Lane Closures : Lane one will be closed.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 05:00 from 22 November 2024 to 24 November 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 14.35 miles from Scrapsgate.
Location: eastbound at junction J4 (West Malling) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 22 November 2024 to 06:00 on 23 November 2024.
Schedule : From 20:00 on 26 November 2024 to 06:00 on 27 November 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 17.87 miles from Scrapsgate.
Location: westbound between junctions J7 (Maidstone) and J4 (West Malling) .
Lane Closures : Lanes 1, 2, 3 and 4 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 25 November 2024 to 30 November 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 14.46 miles from Scrapsgate.
Location: westbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 23 November 2024 to 06:00 on 24 November 2024.
Schedule : From 20:00 on 30 November 2024 to 06:00 on 1 December 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 14.56 miles from Scrapsgate.
Location: southbound exit slip to the A126 .
Due to: Emergency roadworks.
Period : expect disruption until 17:00 on 23 December 2024.
Lanes Closed : All lanes are closed.
Nearest town: 19.13 miles from Scrapsgate.
Location: westbound at junction J6 (Maidstone) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 25 November 2024 to 30 November 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 14.84 miles from Scrapsgate.
Location: westbound entry slip at junction J5 (Aylesford) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 25 November 2024 to 30 November 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 16.2 miles from Scrapsgate.
Location: westbound between junctions J6 (Maidstone) and J6 (Maidstone) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 22 November 2024 to 24 November 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 15 miles from Scrapsgate.
Location: westbound entry slip at junction J7 (Maidstone) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 25 November 2024 to 30 November 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 14.34 miles from Scrapsgate.
Location: westbound entry slip at junction J6 (Maidstone) .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 4 June 2025 to 06:00 on 5 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 15.14 miles from Scrapsgate.
Location: westbound between junctions J6 (Maidstone) and J6 (Maidstone) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 4 June 2025 to 06:00 on 5 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 14.78 miles from Scrapsgate.
Location: westbound between junctions J7 (Maidstone) and J6 (Maidstone) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 4 June 2025 to 06:00 on 5 June 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 14.66 miles from Scrapsgate.