Location: eastbound between the junctions with the A270 Brighton West and the A293 .
Lane Closures : Lane one is closed.
Due to: Horticultural works.
Period : expect disruption until 06:00 on 8 May 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 9.85 miles from Saltdean.

Location: eastbound between the junctions with the A293 and the A2038 .
Lane Closures : Lane one is closed.
Due to: Horticultural works.
Period : expect disruption until 06:00 on 8 May 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 7.94 miles from Saltdean.

Location: westbound between the junctions with the A26 North and the A277 .
Lane Closures : Lane one is closed.
Due to: Horticultural works.
Period : expect disruption until 06:00 on 8 May 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 4.88 miles from Saltdean.

Location: northbound between the A259 and the junction with the A27 .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 22:00 on 8 May 2025 to 06:00 on 14 May 2025.
Nearest town: 4.32 miles from Saltdean.

Location: southbound between the M23 and the junction with the A272 .
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 8 May 2025 to 06:00 on 9 May 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 17.64 miles from Saltdean.

Location: northbound between the A272 and the junction with the M23 .
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 8 May 2025 to 06:00 on 9 May 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 15.7 miles from Saltdean.

Location: northbound between the A2300 and the junction with the M23 .
Lane Closures : Lane two is closed.
Due to: Horticultural works.
Period : expect disruption until 06:00 on 8 May 2025.
Lanes Closed : There is one of three lanes closed.
Nearest town: 14.11 miles from Saltdean.

Location: northbound at the junction with the A2300 .
Lane Closures : Lane two is closed.
Due to: Horticultural works.
Period : expect disruption until 06:00 on 8 May 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 13.61 miles from Saltdean.

Location: southbound between the M23 and the junction with the A2300 .
Lane Closures : Lane two is closed.
Due to: Horticultural works.
Period : expect disruption until 06:00 on 8 May 2025.
Lanes Closed : There is one of three lanes closed.
Nearest town: 16.73 miles from Saltdean.

Location: eastbound between the A27 and the junction with the A269 Bexhill West.
Due to: Horticultural works.
Period : expect disruption until 06:00 on 8 May 2025.
Lanes Closed : All lanes are closed.
Nearest town: 16.92 miles from Saltdean.

Location: westbound between the A277 and the junction with the A2038 .
Due to: Roadworks scheme.
Period : from 20:10 on 6 May 2025 to 06:00 on 17 May 2025.
Nearest town: 4.61 miles from Saltdean.

Location: eastbound entry slip from the A23 .
Due to: Roadworks.
Period : expect disruption until 06:00 on 8 May 2025.
Lanes Closed : All lanes are closed.
Nearest town: 6.72 miles from Saltdean.

Location: eastbound between the A23 and the junction with the A270 Brighton East.
Due to: Roadworks.
Period : expect disruption until 06:00 on 8 May 2025.
Lanes Closed : All lanes are closed.
Nearest town: 6.82 miles from Saltdean.

Location: eastbound at the junction with the A23 .
Lane Closures : Lane two is closed.
Due to: Roadworks.
Period : expect disruption until 20:00 on 22 June 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 6.87 miles from Saltdean.

Location: westbound between the A270 Brighton East and the junction with the A23 .
Lane Closures : Lane two is closed.
Due to: Roadworks.
Period : expect disruption until 20:00 on 16 June 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 5.14 miles from Saltdean.

Location: eastbound between the A2038 and the junction with the A270 Brighton East.
Due to: Roadworks scheme.
Period : from 20:02 on 29 March 2025 to 20:00 on 22 June 2025.
Nearest town: 6.93 miles from Saltdean.

Location: eastbound between the A23 and the junction with the A270 Brighton East.
Lane Closures : Lane two is closed.
Due to: Roadworks.
Period : expect disruption until 20:00 on 22 June 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 6.69 miles from Saltdean.

Location: eastbound between the junctions with the A2038 and the A23 .
Lane Closures : Lane two is closed.
Due to: Roadworks.
Period : expect disruption until 20:00 on 22 June 2025.
Lanes Closed : There is one of three lanes closed.
Nearest town: 6.93 miles from Saltdean.

Location: eastbound between the A293 and the junction with the A23 .
Due to: Roadworks scheme.
Period : from 20:00 on 6 May 2025 to 06:00 on 30 May 2025.
Nearest town: 7.22 miles from Saltdean.

Location: southbound.
Due to: Roadworks scheme.
Period : from 20:00 on 5 May 2025 to 06:00 on 16 May 2025.
Nearest town: 13.56 miles from Saltdean.

Location: northbound entry slip from the A2300 .
Due to: Roadworks scheme.
Period : from 20:00 on 5 May 2025 to 06:00 on 16 May 2025.
Nearest town: 13.3 miles from Saltdean.

Location: westbound between the A277 and the junction with the A2038 .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 10 May 2025 to 06:00 on 12 May 2025.
Nearest town: 4.61 miles from Saltdean.

Location: southbound at the junction with the A2300 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 12 May 2025 to 14 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 13.51 miles from Saltdean.

Location: southbound exit slip to the A2300 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 12 May 2025 to 14 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 13.51 miles from Saltdean.

Location: southbound between the M23 and the junction with the A2300 .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 12 May 2025 to 14 May 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 15.09 miles from Saltdean.

Location: eastbound between the junctions with the A24 South and the A2025 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 12 May 2025 to 06:00 on 16 May 2025.
Nearest town: 14.61 miles from Saltdean.

Location: westbound between the junctions with the A280 and the A284 Arundel East.
Lane Closures : Lane two will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 20:00 on 12 May 2025 to 06:00 on 13 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.17 miles from Saltdean.

Location: northbound between the junctions with the A272 and the M23 .
Lane Closures : Lane three will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 12 May 2025 to 06:00 on 13 May 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 19.27 miles from Saltdean.

Location: westbound between the junctions with the A2025 and the A24 South.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 12 May 2025 to 06:00 on 16 May 2025.
Nearest town: 14.59 miles from Saltdean.

Location: westbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 10 May 2025 to 12 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 5.91 miles from Saltdean.

Location: westbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 10 May 2025 to 12 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 4.55 miles from Saltdean.

Location: westbound between the A277 and the junction with the A23 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 10 May 2025 to 12 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 4.61 miles from Saltdean.

Location: westbound between the junctions with the A277 and the A23 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 10 May 2025 to 12 May 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 4.64 miles from Saltdean.

Location: westbound between the A270 Brighton East and the junction with the A2038 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 10 May 2025 to 12 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 4.68 miles from Saltdean.

Location: eastbound between the A23 and the junction with the A270 Brighton East.
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 10 May 2025 to 12 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 6.81 miles from Saltdean.

Location: eastbound between the junctions with the A277 and the A26 North.
Due to: Road marking works are planned.
Status : Pending.
Schedule : From 20:00 on 9 May 2025 to 06:00 on 10 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 4.66 miles from Saltdean.

Location: eastbound between the junctions with the A23 and the A277 .
Lane Closures : Lane two will be closed.
Due to: Road marking works are planned.
Status : Pending.
Schedule : From 20:00 on 9 May 2025 to 06:00 on 10 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 4.49 miles from Saltdean.

Location: southbound between the M23 and the junction with the A272 .
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 9 May 2025 to 06:00 on 10 May 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 19.68 miles from Saltdean.

Location: northbound between the A272 and the junction with the M23 .
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 9 May 2025 to 06:00 on 10 May 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 17.05 miles from Saltdean.

Location: southbound between the A27 and the junction with the A259 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 06:00 from 8 May 2025 to 10 May 2025.
Schedule : Expect disruption everyday between 22:00 and 06:00 from 12 May 2025 to 14 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 5.54 miles from Saltdean.

Location: northbound between the A259 and the junction with the A27 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 06:00 from 8 May 2025 to 10 May 2025.
Schedule : Expect disruption everyday between 22:00 and 06:00 from 12 May 2025 to 14 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 4.32 miles from Saltdean.

Location: The junction of the A26 and the A27 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 06:00 from 8 May 2025 to 10 May 2025.
Schedule : Expect disruption everyday between 22:00 and 06:00 from 12 May 2025 to 14 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 5.51 miles from Saltdean.

Location: eastbound between the junctions with the A27 and the A269 Bexhill West.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 09:30 and 15:30 from 8 May 2025 to 9 May 2025.
Nearest town: 19.92 miles from Saltdean.

Location: westbound between the junctions with the A269 Bexhill West and the A27 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 09:30 and 15:30 from 8 May 2025 to 9 May 2025.
Nearest town: 19.94 miles from Saltdean.

Location: eastbound between the A27 and the junction with the A269 Bexhill West.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 8 May 2025 to 10 May 2025.
Nearest town: 19.89 miles from Saltdean.

Location: westbound.
Due to: Roadworks.
Period : expect disruption until 06:00 on 8 May 2025.
Lanes Closed : All lanes are closed.
Nearest town: 5.91 miles from Saltdean.

Location: westbound between the junctions with the A277 and the A23 .
Lane Closures : Lane two is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 8 May 2025.
Lanes Closed : There is one of three lanes closed.
Nearest town: 4.64 miles from Saltdean.

Location: westbound between the A277 and the junction with the A23 .
Lane Closures : Lane two is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 8 May 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 4.61 miles from Saltdean.

Location: westbound between the A270 Brighton East and the junction with the A23 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 10 May 2025 to 06:00 on 17 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 5.44 miles from Saltdean.

Location: westbound.
Due to: Roadworks.
Period : expect disruption until 06:00 on 8 May 2025.
Lanes Closed : All lanes are closed.
Nearest town: 4.55 miles from Saltdean.

Location: eastbound between the A23 and the junction with the A270 Brighton East.
Lane Closures : Lane two is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 8 May 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 6.81 miles from Saltdean.

Location: westbound between the A270 Brighton East and the junction with the A2038 .
Due to: Roadworks.
Period : expect disruption until 06:00 on 8 May 2025.
Lanes Closed : All lanes are closed.
Nearest town: 4.68 miles from Saltdean.

Location: westbound between the junctions with the A23 and the A2038 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 10 May 2025 to 06:00 on 17 May 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 6.79 miles from Saltdean.

Location: westbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 27 May 2025 to 4 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 5.91 miles from Saltdean.

Location: eastbound entry slip from the A2038 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 27 May 2025 to 30 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 7.22 miles from Saltdean.

Location: westbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 27 May 2025 to 4 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 4.55 miles from Saltdean.

Location: westbound between the junctions with the A277 and the A23 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 27 May 2025 to 4 June 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 4.64 miles from Saltdean.

Location: westbound between the A277 and the junction with the A23 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 27 May 2025 to 4 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 4.61 miles from Saltdean.

Location: eastbound exit slip to the A23 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 27 May 2025 to 30 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 6.72 miles from Saltdean.

Location: westbound between the A270 Brighton East and the junction with the A2038 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 27 May 2025 to 4 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 4.68 miles from Saltdean.

Location: eastbound between the A293 and the junction with the A23 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 27 May 2025 to 30 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 6.87 miles from Saltdean.

Location: eastbound between the A23 and the junction with the A270 Brighton East.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 27 May 2025 to 30 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 7.08 miles from Saltdean.

Location: westbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 16 May 2025 to 18 May 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 19 May 2025 to 21 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 5.91 miles from Saltdean.

Location: eastbound between the A293 and the junction with the A23 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 10 May 2025 to 17 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 7.22 miles from Saltdean.

Location: westbound between the junctions with the A277 and the A23 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 16 May 2025 to 18 May 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 19 May 2025 to 21 May 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 4.64 miles from Saltdean.

Location: westbound between the A277 and the junction with the A23 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 16 May 2025 to 18 May 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 19 May 2025 to 21 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 4.61 miles from Saltdean.

Location: eastbound between the A23 and the junction with the A270 Brighton East.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 10 May 2025 to 17 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 6.72 miles from Saltdean.

Location: westbound between the A270 Brighton East and the junction with the A2038 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 16 May 2025 to 18 May 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 19 May 2025 to 21 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 4.68 miles from Saltdean.

Location: eastbound exit slip to the A23 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 10 May 2025 to 17 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 6.87 miles from Saltdean.

Location: eastbound entry slip from the A2038 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 10 May 2025 to 17 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 7.08 miles from Saltdean.

Location: eastbound between the A293 and the junction with the A23 .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 10 May 2025 to 06:00 on 17 May 2025.
Nearest town: 7.22 miles from Saltdean.

Location: westbound between the A277 and the junction with the A2038 .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 16 May 2025 to 06:00 on 21 May 2025.
Nearest town: 4.61 miles from Saltdean.

Location: southbound.
Due to: Roadworks.
Period : expect disruption until 06:00 on 8 May 2025.
Nearest town: 13.56 miles from Saltdean.

Location: southbound.
Due to: Roadworks.
Period : expect disruption until 06:00 on 8 May 2025.
Nearest town: 13.28 miles from Saltdean.

Location: northbound exit slip to the A2300 .
Due to: Roadworks.
Period : expect disruption until 06:00 on 8 May 2025.
Nearest town: 13.21 miles from Saltdean.

Location: northbound entry slip from the A2300 .
Due to: Roadworks.
Period : expect disruption until 06:00 on 8 May 2025.
Nearest town: 13.3 miles from Saltdean.

Location: westbound between the A277 and the junction with the A2038 .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 27 May 2025 to 06:00 on 4 June 2025.
Nearest town: 4.61 miles from Saltdean.