Location: northbound between the junctions with the A1027 and the A689 .
Lane Closures : Lane one is closed.
Due to: Broken down vehicle.
Time To Clear : The event is expected to clear between 16:30 and 16:45 on 31 May 2025.
Normal traffic conditions are expected between 16:30 and 16:45 on 31 May 2025.
Lanes Closed : There is one of three lanes closed.
Nearest town: 10.39 miles from Redcar.

Location: eastbound between the junctions with the A172 and the A1053 .
Lane Closures : Lane one is closed.
Due to: Broken down vehicle.
Time To Clear : The event is expected to clear between 15:30 and 15:45 on 31 May 2025.
Normal traffic conditions are expected between 15:30 and 15:45 on 31 May 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 4.38 miles from Redcar.

Location: eastbound at the junction with the A19 .
Due to: Congestion.
Normal traffic conditions are expected between 11:30 and 11:45 on 31 May 2025.
Nearest town: 10.55 miles from Redcar.

Location: westbound entry slip from the A1044 .
Lane Closures : Lane two is closed.
Due to: Emergency Roadside Drains works.
Period : expect disruption until 15:00 on 6 June 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 9.85 miles from Redcar.

Location: northbound exit slip to the A182 .
Lane Closures : Lane two is closed.
Due to: Roadworks.
Period : expect disruption until 20:00 on 16 June 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 18.55 miles from Redcar.

Location: southbound entry slip from the A66 West.
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 1 September 2025 to 6 September 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 8 September 2025 to 13 September 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 13 October 2025 to 18 October 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 20 October 2025 to 25 October 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 8.84 miles from Redcar.

Location: southbound between the A66 and the junction with the A1130 .
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 1 September 2025 to 6 September 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 8 September 2025 to 13 September 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 13 October 2025 to 18 October 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 20 October 2025 to 25 October 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 9.09 miles from Redcar.

Location: eastbound between the junctions with the A172 and the A1053 .
Lane Closures : Lane two will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 1 June 2025 to 4 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 4.8 miles from Redcar.

Location: westbound between the junctions with the A67 and the A167 .
Due to: Roadworks scheme.
Period : from 20:01 on 2 May 2025 to 06:00 on 28 June 2025.
Nearest town: 18.94 miles from Redcar.

Location: northbound between the A182 Easington and the junction with the A1018 .
Due to: Roadworks scheme.
Period : from 20:00 on 30 April 2025 to 06:00 on 23 June 2025.
Nearest town: 18.46 miles from Redcar.

Location: southbound exit slip to the A182 .
Due to: Roadworks scheme.
Period : from 20:00 on 29 May 2025 to 06:00 on 2 July 2025.
Nearest town: 18.99 miles from Redcar.

Location: northbound between the A179 and the junction with the A182 Easington.
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 05:00 from 2 June 2025 to 7 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 13.81 miles from Redcar.

Location: northbound entry slip from the A181 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 05:00 from 2 June 2025 to 7 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 15.26 miles from Redcar.

Location: northbound exit slip to the A181 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 05:00 from 2 June 2025 to 7 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 15.05 miles from Redcar.

Location: westbound between the junctions with the A67 and the A167 .
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 5 June 2025 to 06:00 on 6 June 2025.
Nearest town: 19.58 miles from Redcar.

Location: southbound between the junctions with the A1085 and the A174 .
Lane Closures : Lane two will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 20:00 on 2 June 2025 to 06:00 on 3 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 3.8 miles from Redcar.

Location: northbound at the junction with the A1027 .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 3 June 2025 to 05:00 on 4 June 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 9.87 miles from Redcar.

Location: northbound at the junction with the A1027 .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 05:00 from 5 June 2025 to 7 June 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 9.87 miles from Redcar.

Location: northbound at the junction with the A1027 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 4 June 2025 to 06:00 on 5 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 9.87 miles from Redcar.

Location: southbound at the junction with the A1027 .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 2 June 2025 to 05:00 on 3 June 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 10 miles from Redcar.

Location: southbound at the junction with the A1027 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 5 June 2025 to 06:00 on 6 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 10 miles from Redcar.

Location: southbound at the junction with the A1027 .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 4 June 2025 to 06:00 on 5 June 2025.
Schedule : From 20:00 on 6 June 2025 to 05:00 on 7 June 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 10 miles from Redcar.

Location: The A1M southbound exit slip at junction J60 .
Lane Closures : Lane one will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 2 June 2025 to 5 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 18.34 miles from Redcar.

Location: The A1M northbound between junctions J60 and J61 .
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 08:00 and 16:30 from 2 June 2025 to 6 June 2025.
Nearest town: 18.47 miles from Redcar.

Location: The A1M northbound at junction J60 .
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 08:00 and 16:30 from 2 June 2025 to 6 June 2025.
Nearest town: 18.54 miles from Redcar.

Location: The A1M southbound exit slip at junction J60 .
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 08:00 and 16:30 from 2 June 2025 to 6 June 2025.
Nearest town: 18.34 miles from Redcar.

Location: southbound exit slip to the A182 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 30 May 2025 to 06:00 on 31 May 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 5 June 2025 to 7 June 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 8 June 2025 to 13 June 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 24 June 2025 to 2 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.99 miles from Redcar.

Location: southbound at the junction with the A182 Murton.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 2 June 2025 to 5 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.99 miles from Redcar.

Location: southbound exit slip to the A182 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 06:00 on 13 June 2025 to 20:00 on 24 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 18.99 miles from Redcar.

Location: northbound exit slip to the A182 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 16 June 2025 to 23 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.55 miles from Redcar.

Location: southbound at the junction with the A182 Murton.
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 1 July 2025 to 06:00 on 2 July 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 18.99 miles from Redcar.

Location: southbound entry slip from the A182 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 30 May 2025 to 06:00 on 31 May 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 5 June 2025 to 7 June 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 8 June 2025 to 13 June 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 24 June 2025 to 1 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.72 miles from Redcar.

Location: northbound between the A182 Easington and the junction with the A1018 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 2 June 2025 to 5 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.46 miles from Redcar.

Location: northbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 2 June 2025 to 7 June 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 9 June 2025 to 14 June 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 16 June 2025 to 21 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 9.67 miles from Redcar.

Location: northbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 2 June 2025 to 7 June 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 9 June 2025 to 14 June 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 16 June 2025 to 21 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 9.75 miles from Redcar.

Location: southbound entry slip from the A1130 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 4 August 2025 to 9 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 11 August 2025 to 16 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 18 August 2025 to 22 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 26 August 2025 to 30 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 9.61 miles from Redcar.

Location: southbound exit slip to the A174 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 4 August 2025 to 9 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 11 August 2025 to 16 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 18 August 2025 to 22 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 26 August 2025 to 30 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 10.26 miles from Redcar.

Location: southbound between the A1130 and the junction with the A174 .
Lane Closures : Lane three will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 2 June 2025 to 7 June 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 9 June 2025 to 14 June 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 16 June 2025 to 21 June 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 9.6 miles from Redcar.

Location: northbound between the A174 and the junction with the A1130 .
Lane Closures : Lane three will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 4 August 2025 to 9 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 11 August 2025 to 16 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 18 August 2025 to 22 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 26 August 2025 to 30 August 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 10.32 miles from Redcar.

Location: northbound between the A67 and the junction with the A174 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 2 June 2025 to 7 June 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 9 June 2025 to 14 June 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 16 June 2025 to 21 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 10.64 miles from Redcar.

Location: southbound between the A66 and the junction with the A67 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 4 August 2025 to 9 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 11 August 2025 to 16 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 18 August 2025 to 22 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 26 August 2025 to 30 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 9.33 miles from Redcar.

Location: northbound between the A174 and the junction with the A66 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 2 June 2025 to 7 June 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 9 June 2025 to 14 June 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 16 June 2025 to 21 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 10.45 miles from Redcar.

Location: northbound.
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 23 June 2025 to 28 June 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 30 June 2025 to 5 July 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 1 September 2025 to 6 September 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 8 September 2025 to 13 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 8.84 miles from Redcar.

Location: northbound between the A66 eastbound and the junction with the A1027 .
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 23 June 2025 to 28 June 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 30 June 2025 to 5 July 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 1 September 2025 to 6 September 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 8 September 2025 to 13 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 9.09 miles from Redcar.

Location: southbound exit slip to the A66 .
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 1 September 2025 to 6 September 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 8 September 2025 to 13 September 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 13 October 2025 to 18 October 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 20 October 2025 to 25 October 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 8.88 miles from Redcar.

Location: southbound between the A1046 and the junction with the A66 .
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 1 September 2025 to 6 September 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 8 September 2025 to 13 September 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 13 October 2025 to 18 October 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 20 October 2025 to 25 October 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 8.97 miles from Redcar.

Location: southbound between the A1027 and the junction with the A1046 .
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 1 September 2025 to 6 September 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 8 September 2025 to 13 September 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 13 October 2025 to 18 October 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 20 October 2025 to 25 October 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 9.3 miles from Redcar.

Location: eastbound exit slip to the A19 .
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 23 June 2025 to 28 June 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 30 June 2025 to 5 July 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 1 September 2025 to 6 September 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 8 September 2025 to 13 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 9.21 miles from Redcar.

Location: northbound entry slip from the A66 West.
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 23 June 2025 to 28 June 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 30 June 2025 to 5 July 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 1 September 2025 to 6 September 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 8 September 2025 to 13 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 8.84 miles from Redcar.

Location: eastbound entry slip from the A19 .
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 1 September 2025 to 6 September 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 8 September 2025 to 13 September 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 13 October 2025 to 18 October 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 20 October 2025 to 25 October 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 8.79 miles from Redcar.

Location: westbound exit slip to the A19 .
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 1 September 2025 to 6 September 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 8 September 2025 to 13 September 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 13 October 2025 to 18 October 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 20 October 2025 to 25 October 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 8.73 miles from Redcar.

Location: westbound entry slip from the A19 .
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 1 September 2025 to 6 September 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 8 September 2025 to 13 September 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 13 October 2025 to 18 October 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 20 October 2025 to 25 October 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 8.97 miles from Redcar.

Location: northbound between the A1130 and the junction with the A66 .
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 23 June 2025 to 28 June 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 30 June 2025 to 5 July 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 1 September 2025 to 6 September 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 8 September 2025 to 13 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 9.14 miles from Redcar.

Location: westbound exit slip to the A19 .
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 23 June 2025 to 28 June 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 30 June 2025 to 5 July 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 1 September 2025 to 6 September 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 8 September 2025 to 13 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 8.8 miles from Redcar.

Location: northbound between the junctions with the A174 and the A1085 .
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 20:00 on 30 May 2025 to 06:00 on 31 May 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 1 June 2025 to 4 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 3.9 miles from Redcar.

Location: eastbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 2 June 2025 to 7 June 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 9 June 2025 to 14 June 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 16 June 2025 to 21 June 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 23 June 2025 to 28 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.78 miles from Redcar.

Location: westbound between the junctions with the A67 and the A167 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 30 May 2025 to 06:00 on 31 May 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 2 June 2025 to 7 June 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 9 June 2025 to 14 June 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 16 June 2025 to 21 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.76 miles from Redcar.