Location: southbound between junctions J1 (Lordshill) and A35 .
Lane Closures : The hard shoulder, lanes 1 and 2 are closed.
Due to: Broken down vehicle.
Time To Clear : The event is expected to clear between 20:30 and 20:45 on 24 April 2025.
Normal traffic conditions are expected between 20:30 and 20:45 on 24 April 2025.
Lanes Closed : There are two of three lanes closed.
Nearest town: 18.15 miles from Pan.

Location: eastbound between junctions J8 (Southampton) and J9 (Fareham) .
Lane Closures : Lane one is closed.
Due to: Broken down vehicle.
Time To Clear : The event is expected to clear between 18:30 and 18:45 on 24 April 2025.
Normal traffic conditions are expected between 18:30 and 18:45 on 24 April 2025.
Lanes Closed : There is one of four lanes closed.
Nearest town: 13.24 miles from Pan.

Location: southbound between junctions J1 (Lordshill) and A35 .
Due to: Congestion.
Normal traffic conditions are expected between 18:00 and 18:15 on 24 April 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 18.11 miles from Pan.

Location: southbound between junctions J1 (Lordshill) and A35 .
Due to: Congestion.
Normal traffic conditions are expected between 17:45 and 18:00 on 24 April 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 18.11 miles from Pan.

Location: northbound at junction J1 (Lordshill) .
Due to: Congestion.
Normal traffic conditions are expected between 17:30 and 17:45 on 24 April 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 18.36 miles from Pan.

Location: southbound between junctions J1 (Lordshill) and A35 .
Due to: Congestion.
Normal traffic conditions are expected between 16:45 and 17:00 on 24 April 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 18.11 miles from Pan.

Location: The A3M southbound exit slip at junction J2 .
Due to: Roadworks.
Period : from 21:14 on 24 April 2025 to 05:30 on 25 April 2025.
Lanes Closed : All lanes are closed.
Nearest town: 19.83 miles from Pan.

Location: eastbound exit slip to the A259 .
Due to: Roadworks.
Period : from 20:28 on 24 April 2025 to 05:00 on 25 April 2025.
Lanes Closed : All lanes are closed.
Nearest town: 18.04 miles from Pan.

Location: eastbound exit slip at junction J7 (Hedge End) .
Due to: Roadworks.
Period : from 20:10 on 24 April 2025 to 06:00 on 25 April 2025.
Lanes Closed : All lanes are closed.
Nearest town: 15.91 miles from Pan.

Due to: Roadworks.
Period : from 20:09 on 24 April 2025 to 06:00 on 25 April 2025.
Lanes Closed : All lanes are closed.
Nearest town: 18.34 miles from Pan.' data-nearesttown='WEST END'>
Location: eastbound exit slip at junction J5 (S'ton Airport) .
Due to: Roadworks.
Period : from 20:09 on 24 April 2025 to 06:00 on 25 April 2025.
Lanes Closed : All lanes are closed.
Nearest town: 18.34 miles from Pan.

Location: eastbound exit slip at junction J8 (Southampton) .
Due to: Roadworks.
Period : from 20:11 on 24 April 2025 to 06:00 on 25 April 2025.
Lanes Closed : All lanes are closed.
Nearest town: 14.57 miles from Pan.

Location: eastbound between junctions J11 (Fareham C) and J12 (Cosham) .
Lane Closures : Lanes 1 and 2 are closed.
Due to: Barrier repairs.
Period : expect disruption until 06:00 on 25 April 2025.
Lanes Closed : There are two of three lanes closed.
Nearest town: 13.85 miles from Pan.

Location: The A3M southbound entry slip at junction J2 .
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 21:30 on 24 April 2025 to 06:00 on 25 April 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.79 miles from Pan.

Location: The A3M southbound exit slip at junction J2 .
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 21:30 on 24 April 2025 to 06:00 on 25 April 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.92 miles from Pan.

Location: westbound between junctions J11 (Fareham C) and J9 (Fareham) .
Due to: Roadworks scheme.
Period : from 20:08 on 23 April 2025 to 06:00 on 1 May 2025.
Nearest town: 13.19 miles from Pan.

Location: eastbound entry slip from the A3023 .
Due to: Roadworks.
Period : expect disruption until 05:00 on 25 April 2025.
Lanes Closed : All lanes are closed.
Nearest town: 17.44 miles from Pan.

Location: eastbound entry slip from the A259 .
Due to: Roadworks.
Period : expect disruption until 05:00 on 25 April 2025.
Lanes Closed : All lanes are closed.
Nearest town: 18.1 miles from Pan.

Location: eastbound entry slip from the A259 .
Due to: Roadworks scheme.
Period : from 21:00 on 22 April 2025 to 06:00 on 25 April 2025.
Nearest town: 18.1 miles from Pan.

Location: eastbound between junctions J9 (Fareham) and J11 (Fareham C) .
Lane Closures : Lane one is closed.
Due to: Road repairs.
Period : expect disruption until 06:00 on 30 April 2026.
Lanes Closed : There is one of four lanes closed.
Nearest town: 12.69 miles from Pan.

Location: eastbound at junction J11 (Fareham C) .
Lane Closures : Lane one is closed.
Due to: Road repairs.
Period : expect disruption until 06:00 on 30 April 2026.
Lanes Closed : There is one of three lanes closed.
Nearest town: 13.18 miles from Pan.

Location: eastbound at junction J12 (Cosham) .
Lane Closures : Lane one will be closed.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 18 June 2025 to 20 June 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 13 August 2025 to 15 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 22 October 2025 to 24 October 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 10 December 2025 to 12 December 2025.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 13.74 miles from Pan.

Location: westbound at junction J12 (Cosham) .
Lane Closures : Lane one will be closed.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 18 June 2025 to 20 June 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 13 August 2025 to 15 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 22 October 2025 to 24 October 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 10 December 2025 to 12 December 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 14.26 miles from Pan.

Location: southbound between the M27 westbound and junction J1 for Tipner.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 8 May 2025 to 10 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 13.95 miles from Pan.

Location: eastbound exit slip at junction J3 (Southampton) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 1 May 2025 to 3 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.5 miles from Pan.

Location: westbound exit slip at junction J3 (Southampton) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 25 April 2025 to 06:00 on 26 April 2025.
Schedule : From 20:00 on 28 April 2025 to 06:00 on 29 April 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 14 May 2025 to 17 May 2025.
Schedule : From 20:00 on 19 May 2025 to 06:00 on 20 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.42 miles from Pan.

Location: eastbound between junctions J2 (Salisbury) and J3 (Southampton) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 1 May 2025 to 06:00 on 3 May 2025.
Nearest town: 19.78 miles from Pan.

Location: eastbound between junctions J2 (Salisbury) and J3 (Southampton) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 1 May 2025 to 3 May 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 19.78 miles from Pan.

Location: westbound between junctions J4 (M3) and J3 (Southampton) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 25 April 2025 to 06:00 on 20 May 2025.
Nearest town: 19.71 miles from Pan.

Location: westbound at junction J3 (Southampton) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 25 April 2025 to 06:00 on 26 April 2025.
Schedule : From 20:00 on 28 April 2025 to 06:00 on 29 April 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 14 May 2025 to 17 May 2025.
Schedule : From 20:00 on 19 May 2025 to 06:00 on 20 May 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 19.42 miles from Pan.

Location: westbound between junctions J4 (M3) and J3 (Southampton) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 25 April 2025 to 06:00 on 26 April 2025.
Schedule : From 20:00 on 28 April 2025 to 06:00 on 29 April 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 14 May 2025 to 17 May 2025.
Schedule : From 20:00 on 19 May 2025 to 06:00 on 20 May 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 19.71 miles from Pan.

Location: westbound between junctions J4 (M3) and J3 (Southampton) .
Lane Closures : Lane one will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 22:00 on 28 April 2025 to 05:00 on 29 April 2025.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 19.68 miles from Pan.

Location: westbound exit slip at Rownhams Services.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 22:00 on 28 April 2025 to 05:00 on 29 April 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.7 miles from Pan.

Location: eastbound exit slip at junction J12 (Cosham) .
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 27 April 2025 to 05:00 on 28 April 2025.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 29 April 2025 to 1 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 13.74 miles from Pan.

Location: northbound exit slip at junction .
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 27 April 2025 to 1 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 13.7 miles from Pan.

Location: eastbound.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 27 April 2025 to 1 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 13.87 miles from Pan.

Location: westbound entry slip at junction J12 (Cosham) .
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 27 April 2025 to 1 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 13.87 miles from Pan.

Location: eastbound at the junction with the A3M .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 25 April 2025 to 06:00 on 26 April 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 16.13 miles from Pan.

Location: eastbound exit slip to the A3M .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 21:30 on 25 April 2025 to 06:00 on 26 April 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 16.13 miles from Pan.

Location: eastbound between the junctions with the A2030 and the A3M .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 25 April 2025 to 06:00 on 26 April 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 15.54 miles from Pan.

Location: The A3M northbound at junction J5 .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 21:30 on 25 April 2025 to 06:00 on 26 April 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 16.39 miles from Pan.

Location: northbound exit slip at junction J1 (Lordshill) .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 25 April 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 18.36 miles from Pan.

Location: eastbound entry slip at junction J10 (Alton) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 1 May 2025 to 3 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 13.34 miles from Pan.

Location: westbound exit slip at junction J10 (Alton) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 29 April 2025 to 1 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 13.18 miles from Pan.

Location: westbound entry slip from the A3023 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 2 May 2025 to 06:00 on 3 May 2025.
Schedule : From 21:00 on 6 May 2025 to 06:00 on 7 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 17.38 miles from Pan.

Location: westbound exit slip to the A3023 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 28 April 2025 to 2 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 17.54 miles from Pan.

Location: westbound exit slip to the A259 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 28 April 2025 to 2 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.3 miles from Pan.

Location: westbound entry slip from the A259 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 28 April 2025 to 2 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.1 miles from Pan.

Location: westbound exit slip to the A3M .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 2 May 2025 to 06:00 on 3 May 2025.
Schedule : From 21:00 on 6 May 2025 to 06:00 on 7 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 16.78 miles from Pan.

Location: westbound between the A3023 and the junction with the A3M .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 21:00 on 28 April 2025 to 06:00 on 7 May 2025.
Nearest town: 17.38 miles from Pan.

Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 5 May 2025 to 14 May 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 13.87 miles from Pan.' data-nearesttown='WEST END'>
Location: westbound between junctions J9 (Fareham) and J5 (S'ton Airport) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 5 May 2025 to 14 May 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 13.87 miles from Pan.

Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:01 on 17 May 2025 to 20:02 on 17 May 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 15 miles from Pan.' data-nearesttown='WEST END'>
Location: westbound between junctions J8 (Southampton) and J5 (S'ton Airport) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:01 on 17 May 2025 to 20:02 on 17 May 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 15 miles from Pan.

Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 21:00 on 5 May 2025 to 20:02 on 17 May 2025.
Nearest town: 13.87 miles from Pan.' data-nearesttown='WEST END'>
Location: westbound between junctions J9 (Fareham) and J5 (S'ton Airport) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 21:00 on 5 May 2025 to 20:02 on 17 May 2025.
Nearest town: 13.87 miles from Pan.

Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 5 May 2025 to 14 May 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 18.13 miles from Pan.' data-nearesttown='WEST END'>
Location: westbound at junction J5 (S'ton Airport) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 5 May 2025 to 14 May 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 18.13 miles from Pan.

Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 25 April 2025 to 06:00 on 26 April 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 17.24 miles from Pan.' data-nearesttown='WEST END'>
Location: westbound between junctions J7 (Hedge End) and J5 (S'ton Airport) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 25 April 2025 to 06:00 on 26 April 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 17.24 miles from Pan.

Location: westbound exit slip to the A2030 .
Lane Closures : Lane one will be closed.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 20 June 2025 to 06:00 on 21 June 2025.
Schedule : From 20:00 on 23 June 2025 to 06:00 on 24 June 2025.
Schedule : From 20:00 on 15 August 2025 to 06:00 on 16 August 2025.
Schedule : From 20:00 on 18 August 2025 to 06:00 on 19 August 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 15.12 miles from Pan.

Location: eastbound between junctions J11 (Fareham C) and J12 (Cosham) .
Lane Closures : Lane one will be closed.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 18 June 2025 to 20 June 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 13 August 2025 to 15 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 22 October 2025 to 24 October 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 10 December 2025 to 12 December 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 13.79 miles from Pan.

Lane Closures : Lane four will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 06:00 on 4 May 2025 to 23:00 on 10 January 2026.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 13.87 miles from Pan.' data-nearesttown='WEST END'>
Location: westbound between junctions J9 (Fareham) and J5 (S'ton Airport) .
Lane Closures : Lane four will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 06:00 on 4 May 2025 to 23:00 on 10 January 2026.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 13.87 miles from Pan.

Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 23:00 on 28 January 2026 to 23:00 on 6 March 2026.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 13.87 miles from Pan.' data-nearesttown='WEST END'>
Location: westbound between junctions J9 (Fareham) and J5 (S'ton Airport) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 23:00 on 28 January 2026 to 23:00 on 6 March 2026.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 13.87 miles from Pan.

Lane Closures : Lane four will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 06:00 on 4 May 2025 to 23:00 on 10 January 2026.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 18.35 miles from Pan.' data-nearesttown='WEST END'>
Location: westbound between junctions J5 (S'ton Airport) and J4 (M3) .
Lane Closures : Lane four will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 06:00 on 4 May 2025 to 23:00 on 10 January 2026.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 18.35 miles from Pan.

Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 23:00 on 28 January 2026 to 23:00 on 6 March 2026.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 18.35 miles from Pan.' data-nearesttown='WEST END'>
Location: westbound between junctions J5 (S'ton Airport) and J4 (M3) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 23:00 on 28 January 2026 to 23:00 on 6 March 2026.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 18.35 miles from Pan.

Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 23:00 on 28 January 2026 to 23:00 on 6 March 2026.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 18.13 miles from Pan.' data-nearesttown='WEST END'>
Location: westbound at junction J5 (S'ton Airport) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 23:00 on 28 January 2026 to 23:00 on 6 March 2026.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 18.13 miles from Pan.

Location: westbound between junctions J9 (Fareham) and J4 (M3) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 06:00 on 4 May 2025 to 23:00 on 6 March 2026.
Nearest town: 13.87 miles from Pan.