Location: eastbound between junctions J11 (Warrington) and J12 (M60) .
Lane Closures : The hard shoulder and lane 1 are closed.
Due to: Broken down vehicle.
Time To Clear : The event is expected to clear between 00:30 and 00:45 on 26 April 2025.
Normal traffic conditions are expected between 00:30 and 00:45 on 26 April 2025.
Lanes Closed : There is one of three lanes closed.
Nearest town: 11.26 miles from Moss Bank.

Location: eastbound between junctions J7 and J6 (Hale) .
Due to: Road Management.
Time To Clear : The event is expected to clear between 02:45 and 03:00 on 26 April 2025.
Normal traffic conditions are expected between 02:45 and 03:00 on 26 April 2025.
Lanes Closed : There are lane closures.
Nearest town: 18.69 miles from Moss Bank.

Location: southbound exit slip at junction J3 .
Lane Closures : The hard shoulder and lane 1 are closed.
Due to: Vehicle tyre change.
Time To Clear : The event is expected to clear between 20:15 and 20:30 on 25 April 2025.
Normal traffic conditions are expected between 20:15 and 20:30 on 25 April 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 14.98 miles from Moss Bank.

Location: westbound at the junction with the M57 .
Due to: Congestion.
Normal traffic conditions are expected between 21:15 and 21:30 on 25 April 2025.
Nearest town: 8.92 miles from Moss Bank.

Location: northbound between junctions J22 (Newton le Willows) and J23 (Haydock) .
Due to: Congestion.
Normal traffic conditions are expected between 22:00 and 22:15 on 25 April 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 5.53 miles from Moss Bank.

Location: westbound at the junction with the M57 .
Due to: Congestion.
Normal traffic conditions are expected between 19:45 and 20:00 on 25 April 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 8.92 miles from Moss Bank.

Location: clockwise exit slip at junction J10 (Trafford Park) .
Due to: Congestion.
Normal traffic conditions are expected between 20:15 and 20:30 on 25 April 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 15.82 miles from Moss Bank.

Location: westbound at the junction with the M57 .
Due to: Congestion.
Normal traffic conditions are expected between 19:30 and 19:45 on 25 April 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 8.92 miles from Moss Bank.

Location: westbound at the junction with the M57 .
Due to: Congestion.
Normal traffic conditions are expected between 19:00 and 19:15 on 25 April 2025.
Nearest town: 8.92 miles from Moss Bank.

Location: westbound at the junction with the M57 .
Due to: Congestion.
Normal traffic conditions are expected between 18:30 and 18:45 on 25 April 2025.
Nearest town: 8.92 miles from Moss Bank.

Location: northbound exit slip at junction J3 .
Due to: Congestion.
Normal traffic conditions are expected between 18:45 and 19:00 on 25 April 2025.
Nearest town: 15.2 miles from Moss Bank.

Location: northbound entry slip at junction J1 from M60 clockwise.
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 23:59 on 26 April 2025 to 07:00 on 27 April 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 15.86 miles from Moss Bank.

Location: westbound between junctions J12 (M60) and J11 (Warrington) .
Lane Closures : Lane one is closed.
Due to: Emergency Roadside Equipment Maintenance.
Period : expect disruption until 05:00 on 26 April 2025.
Lanes Closed : There is one of four lanes closed.
Nearest town: 12.97 miles from Moss Bank.

Location: eastbound between junctions J11 (Warrington) and J12 (M60) .
Lane Closures : Lane one is closed.
Due to: Emergency Roadside Equipment Maintenance.
Period : expect disruption until 05:00 on 26 April 2025.
Lanes Closed : There is one of three lanes closed.
Nearest town: 13.18 miles from Moss Bank.

Location: northbound between junctions J8 and J9 .
Lane Closures : The hard shoulder is closed.
Due to: Road repairs.
Period : expect disruption until 23:59 on 31 May 2025.
Nearest town: 15.68 miles from Moss Bank.

Location: southbound between the A5038 and the junction with the A567 .
Due to: Roadworks scheme.
Period : from 20:03 on 23 April 2025 to 06:00 on 12 July 2025.
Nearest town: 10.5 miles from Moss Bank.

Location: northbound between junctions J27 (Parbold) and J28 (Leyland) .
Lane Closures : The hard shoulder and lane 1 are closed.
Due to: Horticultural works.
Period : expect disruption until 05:00 on 26 April 2025.
Lanes Closed : There is one of three lanes closed.
Nearest town: 11.61 miles from Moss Bank.

Location: northbound entry slip at junction J21A (Manchester) from M62 westbound.
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 26 April 2025 to 05:00 on 27 April 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 8.49 miles from Moss Bank.

Location: westbound at junction J10 (M6) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 26 April 2025 to 05:00 on 27 April 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 8.65 miles from Moss Bank.

Location: westbound between junctions J11 (Warrington) and J10 (M6) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 26 April 2025 to 05:00 on 27 April 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 9.25 miles from Moss Bank.

Location: northbound entry slip at junction J21A (Manchester) from M62 eastbound.
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 26 April 2025 to 05:00 on 27 April 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 7.72 miles from Moss Bank.

Location: eastbound exit slip at junction J10 (M6) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 26 April 2025 to 05:00 on 27 April 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 7.71 miles from Moss Bank.

Location: eastbound exit slip at junction J10 (M6) .
Lane Closures : Lane one will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 26 April 2025 to 05:00 on 27 April 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 7.58 miles from Moss Bank.

Location: eastbound between junctions J9 (Warrington) and J10 (M6) .
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 26 April 2025 to 05:00 on 27 April 2025.
Nearest town: 6.87 miles from Moss Bank.

Location: eastbound at junction J9 (Warrington) .
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 26 April 2025 to 05:00 on 27 April 2025.
Nearest town: 6.73 miles from Moss Bank.

Location: westbound exit slip at junction J1 (Kirkby) .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 26 April 2025 to 05:00 on 27 April 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 7.48 miles from Moss Bank.

Location: northbound exit slip at junction J22 (Newton le Willows) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 26 April 2025 to 05:00 on 27 April 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 6.87 miles from Moss Bank.

Location: northbound between junctions J21A (Manchester) and J22 (Newton le Willows) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 26 April 2025 to 05:00 on 27 April 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 7.22 miles from Moss Bank.

Location: northbound at junction J21A (Manchester) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 26 April 2025 to 05:00 on 27 April 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 7.61 miles from Moss Bank.

Location: clockwise at junction J10 (Trafford Park) .
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 09:00 on 26 April 2025 to 17:00 on 26 April 2025.
Nearest town: 15.73 miles from Moss Bank.

Location: clockwise entry slip at junction J10 (Trafford Park) .
Lane Closures : Lane one will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 21:30 on 26 April 2025 to 05:00 on 27 April 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 15.71 miles from Moss Bank.

Location: westbound exit slip at junction J5 (Manchester) for Manchester Airport.
Due to: Road repairs.
Period : expect disruption until 05:00 on 26 April 2025.
Lanes Closed : All lanes are closed.
Nearest town: 19.81 miles from Moss Bank.

Location: eastbound between junctions J1 (Kirkby) and J3 (Southport) .
Lane Closures : Lanes 1 and 2 are closed.
Due to: Horticultural works.
Period : expect disruption until 05:00 on 26 April 2025.
Lanes Closed : There are two of three lanes closed.
Nearest town: 7.6 miles from Moss Bank.

Location: eastbound between the M57 and junction J1 (Kirkby) .
Lane Closures : Lanes 1 and 2 are closed.
Due to: Horticultural works.
Period : expect disruption until 05:00 on 26 April 2025.
Lanes Closed : All lanes are closed.
Nearest town: 7.8 miles from Moss Bank.

Location: eastbound exit slip at junction J1 (Kirkby) .
Due to: Horticultural works.
Period : expect disruption until 05:00 on 26 April 2025.
Lanes Closed : All lanes are closed.
Nearest town: 7.69 miles from Moss Bank.

Location: eastbound entry slip at junction J1 (Kirkby) .
Due to: Horticultural works.
Period : expect disruption until 05:00 on 26 April 2025.
Lanes Closed : All lanes are closed.
Nearest town: 7.62 miles from Moss Bank.

Location: southbound between the A41 and the junction with the A494 .
Due to: Roadworks scheme.
Period : from 20:05 on 25 April 2025 to 05:00 on 1 May 2025.
Nearest town: 14.73 miles from Moss Bank.

Location: southbound between the A41 and the junction with the A494 .
Due to: Roadworks.
Period : expect disruption until 05:00 on 28 April 2025.
Lanes Closed : All lanes are closed.
Nearest town: 14.73 miles from Moss Bank.

Location: northbound between the A540 and the junction with the A41 .
Due to: Roadworks scheme.
Period : from 20:05 on 25 April 2025 to 05:00 on 1 May 2025.
Nearest town: 17.24 miles from Moss Bank.

Location: northbound between the A540 and the junction with the A41 .
Due to: Roadworks.
Period : expect disruption until 06:00 on 28 April 2025.
Lanes Closed : All lanes are closed.
Nearest town: 17.24 miles from Moss Bank.

Location: westbound at junction J10 (M6) .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 26 April 2025.
Lanes Closed : There is one of three lanes closed.
Nearest town: 8.36 miles from Moss Bank.

Location: southbound exit slip at junction J21A (Manchester) to M62 West.
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 25 April 2025 to 06:00 on 26 April 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 8.13 miles from Moss Bank.

Location: eastbound between junctions J3 (Blackburn) and J4 (Blackburn) .
Due to: Roadworks scheme.
Period : from 20:06 on 24 April 2025 to 05:00 on 26 April 2025.
Nearest town: 18.86 miles from Moss Bank.

Location: eastbound between junctions J3 (Blackburn) and J4 (Blackburn) .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 05:00 on 26 April 2025.
Lanes Closed : There is one of three lanes closed.
Nearest town: 18.94 miles from Moss Bank.

Location: eastbound between junctions J3 (Blackburn) and J4 (Blackburn) .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 05:00 on 26 April 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 18.86 miles from Moss Bank.

Location: westbound between junctions J4 (Blackburn) and J3 (Blackburn) .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 05:00 on 26 April 2025.
Lanes Closed : There is one of three lanes closed.
Nearest town: 19.99 miles from Moss Bank.

Location: westbound between junctions J4 (Blackburn) and J3 (Blackburn) .
Due to: Roadworks scheme.
Period : from 20:06 on 24 April 2025 to 05:00 on 26 April 2025.
Nearest town: 19.99 miles from Moss Bank.

Location: westbound between junctions J4 (Blackburn) and J3 (Blackburn) .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 05:00 on 26 April 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 19.47 miles from Moss Bank.

Location: anticlockwise at junction J14 (St Helens) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 23:59 on 26 April 2025 to 08:00 on 27 April 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 16.38 miles from Moss Bank.

Location: anticlockwise between junctions J16 (Salford) and J15 (Bolton) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 23:59 on 26 April 2025 to 08:00 on 27 April 2025.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 16.9 miles from Moss Bank.

Location: northbound entry slip at junction J2 from A580.
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 23:59 on 26 April 2025 to 06:00 on 30 April 2025.
Nearest town: 15.48 miles from Moss Bank.

Location: anticlockwise between junctions J16 (Salford) and J14 (St Helens) .
Due to: Roadworks scheme.
Period : from 20:06 on 25 April 2025 to 06:00 on 2 May 2025.
Nearest town: 16.91 miles from Moss Bank.

Location: eastbound between junctions J12 (Runcorn) and J10 (Northwich) .
Due to: Roadworks scheme.
Period : from 20:15 on 23 April 2025 to 06:00 on 17 June 2025.
Nearest town: 10.9 miles from Moss Bank.

Location: clockwise between junctions J10 (Trafford Park) and J11 (Irlam) .
Due to: Roadworks scheme.
Period : from 20:11 on 22 April 2025 to 06:00 on 2 May 2025.
Nearest town: 15.78 miles from Moss Bank.

Location: southbound between junctions J6 and J5 .
Lane Closures : The hard shoulder is closed.
Due to: Road repairs.
Period : expect disruption until 23:59 on 31 May 2025.
Nearest town: 11.36 miles from Moss Bank.

Location: southbound between junctions J4 (Knowsley) and J2 (Prescot) .
Due to: Roadworks scheme.
Period : from 20:28 on 22 April 2025 to 06:00 on 7 June 2025.
Nearest town: 5.75 miles from Moss Bank.

Location: southbound at junction J8 .
Lane Closures : The hard shoulder is closed.
Due to: Emergency barrier repairs.
Period : expect disruption until 23:59 on 31 May 2025.
Nearest town: 14.98 miles from Moss Bank.

Location: northbound between junctions J1 (Huyton) and J2 (Prescot) .
Due to: Roadworks scheme.
Period : from 20:04 on 23 April 2025 to 05:00 on 17 May 2025.
Nearest town: 5.22 miles from Moss Bank.

Location: westbound at junction J9 (Preston) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 20:00 on 1 August 2025.
Nearest town: 12.74 miles from Moss Bank.

Location: eastbound between junctions J1 (Kirkby) and M6 .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 30 March 2026.
Nearest town: 7.6 miles from Moss Bank.

Location: westbound between junctions M6 and J5 (Skelmersdale) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 30 March 2026.
Nearest town: 4.92 miles from Moss Bank.

Location: eastbound between junctions J5 (Skelmersdale) and M6 .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 30 March 2026.
Nearest town: 4.92 miles from Moss Bank.

Location: eastbound between the M57 and junction J1 (Kirkby) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 30 March 2026.
Nearest town: 8.87 miles from Moss Bank.

Location: westbound between junction J1 (Kirkby) and the M57 .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 30 March 2026.
Nearest town: 7.48 miles from Moss Bank.

Location: westbound between junctions M6 and J1 (Kirkby) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 30 March 2026.
Nearest town: 4.91 miles from Moss Bank.

Location: southbound between junctions J4 (Knowsley) and J1 (Huyton) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 30 March 2026.
Nearest town: 5.53 miles from Moss Bank.

Location: southbound between junctions J5 (St Helens) and J4 (Knowsley) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 30 March 2026.
Nearest town: 6.11 miles from Moss Bank.

Location: southbound between junctions J7 (Liverpool) and J4 (Knowsley) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 30 March 2026.
Nearest town: 8.86 miles from Moss Bank.

Location: northbound between junctions J4 (Knowsley) and J5 (St Helens) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 30 March 2026.
Nearest town: 5.57 miles from Moss Bank.

Location: northbound between junctions J1 (Huyton) and J4 (Knowsley) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 30 March 2026.
Nearest town: 5.38 miles from Moss Bank.

Location: northbound entry slip at junction J1 (Huyton) from roundabout.
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 30 March 2026.
Nearest town: 5.53 miles from Moss Bank.

Location: northbound between junctions J4 (Knowsley) and J7 (Liverpool) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 30 March 2026.
Nearest town: 6.24 miles from Moss Bank.

Location: southbound between junctions J2 (Prescot) and J1 (Huyton) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 30 March 2026.
Nearest town: 5.25 miles from Moss Bank.

Location: northbound between the junctions with the A540 and the A41 .
Due to: Emergency Roadside Drains works.
Period : expect disruption until 17:00 on 1 May 2025.
Nearest town: 16.81 miles from Moss Bank.

Location: southbound between the junctions with the A41 and the A540 .
Due to: Emergency Roadside Drains works.
Period : expect disruption until 17:00 on 1 May 2025.
Nearest town: 16.59 miles from Moss Bank.

Location: eastbound entry slip at junction J6 (Liverpool) from roundabout.
Lane Closures : The hard shoulder is closed.
Due to: Emergency barrier repairs.
Period : expect disruption until 06:00 on 16 May 2025.
Nearest town: 5.46 miles from Moss Bank.

Location: southbound exit slip at junction J1 (Huyton) to roundabout.
Lane Closures : Lane one is closed.
Due to: Emergency barrier repairs.
Period : expect disruption until 06:00 on 31 October 2026.
Lanes Closed : There is one of two lanes closed.
Nearest town: 5.36 miles from Moss Bank.

Location: northbound entry slip at junction J2 from A580.
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 31 March 2026.
Nearest town: 15.72 miles from Moss Bank.

Location: southbound exit slip at junction J1 to A580.
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 31 March 2026.
Nearest town: 15.29 miles from Moss Bank.

Location: southbound between the M6 and junction J9 .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 31 March 2026.
Nearest town: 18.85 miles from Moss Bank.

Location: northbound between junctions J2 and J9 .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 31 March 2026.
Nearest town: 15.1 miles from Moss Bank.

Location: northbound between junction J9 and the M6 .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 31 March 2026.
Nearest town: 17.63 miles from Moss Bank.

Location: southbound between the M6 and junction J2 .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 31 March 2026.
Nearest town: 18.66 miles from Moss Bank.

Location: westbound exit slip at junction J6 (Liverpool) to roundabout.
Due to: Emergency barrier repairs.
Period : expect disruption until 06:00 on 16 May 2025.
Lanes Closed : All lanes are closed.
Nearest town: 5.33 miles from Moss Bank.

Location: eastbound between junctions J1 (M60/M62) and J2 (Eccles) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 00:00 on 29 June 2025.
Nearest town: 15.63 miles from Moss Bank.

Location: eastbound between junctions J1 (M60/M62) and J2 (Eccles) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 30 June 2025.
Nearest town: 15.63 miles from Moss Bank.

Location: eastbound between junctions J1 (M6) and J2 (Manchester) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 30 March 2026.
Nearest town: 17.47 miles from Moss Bank.

Location: eastbound between junctions J1A (Preston) and J1 (M6) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 30 March 2026.
Nearest town: 17.53 miles from Moss Bank.

Location: eastbound between junctions J3 (Blackburn) and J4 (Blackburn) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 30 March 2026.
Nearest town: 18.94 miles from Moss Bank.

Location: eastbound between junctions J2 (Manchester) and J4 (Blackburn) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 30 March 2026.
Nearest town: 17.82 miles from Moss Bank.

Location: westbound between junctions J4 (Blackburn) and J1A (Preston) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 30 March 2026.
Nearest town: 19.47 miles from Moss Bank.

Location: eastbound between junctions J3 (Blackburn) and J4 (Blackburn) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 30 March 2026.
Nearest town: 19.57 miles from Moss Bank.

Location: northbound at junction J4 .
Lane Closures : The hard shoulder is closed.
Due to: Emergency barrier repairs.
Period : expect disruption until 23:59 on 30 April 2025.
Nearest town: 13.15 miles from Moss Bank.

Location: anticlockwise between junctions J5 (Wythenshawe) and J4 (Chester) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 23:00 on 2 May 2025 to 05:00 on 3 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.75 miles from Moss Bank.

Location: eastbound entry slip at junction J4 (Wythenshawe) .
Lane Closures : Lane one will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:30 and 05:00 from 2 May 2025 to 4 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.88 miles from Moss Bank.

Location: anticlockwise between junctions J6 (Sale) and J5 (Wythenshawe) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 23:00 on 2 May 2025 to 05:00 on 3 May 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 19.08 miles from Moss Bank.

Location: eastbound between junctions J5 (Manchester) and J3 (Altrincham) .
Lane Closures : Lane one will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:30 and 05:00 from 2 May 2025 to 4 May 2025.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 19.9 miles from Moss Bank.

Location: anticlockwise entry slip at junction J5 (Wythenshawe) .
Lane Closures : Lane one will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 23:00 on 2 May 2025 to 05:00 on 3 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.94 miles from Moss Bank.

Location: westbound between junctions J7 and J9 (Preston) .
Lane Closures : Lane one will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 21:30 on 2 May 2025 to 05:00 on 3 May 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 13.31 miles from Moss Bank.

Location: westbound entry slip at junction J4 (Skelmersdale) .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 2 May 2025 to 05:00 on 3 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 5.45 miles from Moss Bank.

Location: westbound between junctions J5 (Skelmersdale) and J3 (Southport) .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 2 May 2025 to 05:00 on 3 May 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 4.53 miles from Moss Bank.

Location: westbound exit slip at junction J4 (Skelmersdale) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 2 May 2025 to 05:00 on 3 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 5.3 miles from Moss Bank.

Location: southbound between the M56 and the junction with the M6 .
Lane Closures : Lane two will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 2 May 2025 to 05:00 on 3 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 16.04 miles from Moss Bank.

Location: northbound exit slip at junction J21A (Manchester) to M62 west.
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 23:00 on 2 May 2025 to 05:00 on 3 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 8.54 miles from Moss Bank.

Location: northbound exit slip at junction J21A (Manchester) to M62 east.
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 23:00 on 2 May 2025 to 05:00 on 3 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 7.93 miles from Moss Bank.

Location: southbound entry slip at junction J9 .
Lane Closures : Lane one will be closed.
Due to: Litter clearance is planned.
Status : Pending.
Schedule : From 21:00 on 2 May 2025 to 05:00 on 3 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 17.86 miles from Moss Bank.

Location: northbound between junctions J19 (Northwich) and J20 (Macclesfield) .
Lane Closures : Lane one will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 2 May 2025 to 05:00 on 3 May 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 14.64 miles from Moss Bank.

Location: northbound between junctions J20 (Macclesfield) and J21 (Warrington) .
Lane Closures : Lanes 2, 3 and 4 will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 23:00 on 2 May 2025 to 05:00 on 3 May 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 11.45 miles from Moss Bank.

Location: northbound between junctions J21 (Warrington) and J21A (Manchester) .
Lane Closures : Lanes 1, 2, 3 and 4 will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 23:00 on 2 May 2025 to 05:00 on 3 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 10.77 miles from Moss Bank.

Location: northbound entry slip at junction J21 (Warrington) .
Lane Closures : Lane one will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 23:00 on 2 May 2025 to 05:00 on 3 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 10.52 miles from Moss Bank.

Location: southbound at junction J20A (Chester) .
Lane Closures : Lane one will be closed.
Due to: Litter clearance is planned.
Status : Pending.
Schedule : From 21:30 on 1 May 2025 to 05:00 on 2 May 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 11.79 miles from Moss Bank.

Location: southbound exit slip at junction J20A (Chester) .
Lane Closures : Lane one will be closed.
Due to: Litter clearance is planned.
Status : Pending.
Schedule : From 21:30 on 1 May 2025 to 05:00 on 2 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 12.16 miles from Moss Bank.

Location: southbound between junctions J21 (Warrington) and J20 (Macclesfield) .
Lane Closures : Lane one will be closed.
Due to: Litter clearance is planned.
Status : Pending.
Schedule : From 21:30 on 1 May 2025 to 05:00 on 2 May 2025.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 11.51 miles from Moss Bank.

Location: southbound between junctions J21A (Manchester) and J21 (Warrington) .
Lane Closures : Lane one will be closed.
Due to: Emergency roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 21:30 on 30 April 2025 to 05:00 on 1 May 2025.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 9.52 miles from Moss Bank.

Location: northbound between junctions J21 (Warrington) and J21A (Manchester) .
Lane Closures : Lane one will be closed.
Due to: Emergency roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 21:30 on 29 April 2025 to 05:00 on 30 April 2025.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 10.66 miles from Moss Bank.

Location: northbound exit slip at junction J21A (Manchester) to M62 west.
Lane Closures : Lane one will be closed.
Due to: Emergency roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 21:30 on 28 April 2025 to 05:00 on 29 April 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 8.54 miles from Moss Bank.

Location: northbound between junctions J21 (Warrington) and J21A (Manchester) .
Lane Closures : Lane four will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 28 April 2025 to 05:00 on 29 April 2025.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 8.88 miles from Moss Bank.

Location: southbound at junction J21A (Manchester) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 28 April 2025 to 05:00 on 29 April 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 8.3 miles from Moss Bank.

Location: southbound between junctions J3 (Huyton) and J2 (Prescot) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 09:00 on 2 May 2025 to 17:00 on 2 May 2025.
Nearest town: 5.15 miles from Moss Bank.

Location: westbound between junctions M6 and J5 (Skelmersdale) .
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 09:00 on 2 May 2025 to 18:00 on 2 May 2025.
Nearest town: 4.71 miles from Moss Bank.

Location: westbound between the A550 and the junction with the M53 .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 1 May 2025 to 3 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 14.65 miles from Moss Bank.

Location: southbound between junctions J4 (Heswall) and J5 (Bebington) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 1 May 2025 to 3 May 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 15.06 miles from Moss Bank.

Location: southbound between junctions J4 (Heswall) and J5 (Bebington) .
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 1 May 2025 to 3 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 14.91 miles from Moss Bank.

Location: southbound exit slip at junction J6 (Eastham) .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 1 May 2025 to 3 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 14.26 miles from Moss Bank.

Location: northbound entry slip at junction J7 (Overpool) .
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 1 May 2025 to 3 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 14.01 miles from Moss Bank.

Location: southbound between junctions J5 (Bebington) and J7 (Overpool) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 1 May 2025 to 3 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 14.52 miles from Moss Bank.

Location: northbound at junction J5 (Bebington) .
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 1 May 2025 to 3 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 14.34 miles from Moss Bank.

Location: northbound between junctions J8 (Overpool) and J6 (Eastham) .
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 1 May 2025 to 3 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 13.86 miles from Moss Bank.

Location: southbound entry slip at junction J5 (Bebington) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 1 May 2025 to 3 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 14.42 miles from Moss Bank.

Location: northbound between junctions J6 (Eastham) and J5 (Bebington) .
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 1 May 2025 to 3 May 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 14.25 miles from Moss Bank.

Location: southbound entry slip at junction J6 (Eastham) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 1 May 2025 to 3 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 14.15 miles from Moss Bank.

Location: southbound exit slip at junction J7 (Overpool) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 1 May 2025 to 3 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 14.16 miles from Moss Bank.

Location: eastbound between the M53 and the junction with the A550 .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 1 May 2025 to 3 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 14.48 miles from Moss Bank.

Location: eastbound between junctions J3 (Southport) and J5 (Skelmersdale) .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 1 May 2025 to 05:00 on 2 May 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 6 miles from Moss Bank.

Location: eastbound entry slip at junction J4 (Skelmersdale) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 1 May 2025 to 05:00 on 2 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 5.47 miles from Moss Bank.

Location: eastbound entry slip at junction J3 (Southport) .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 1 May 2025 to 05:00 on 2 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 6.02 miles from Moss Bank.

Location: eastbound exit slip at junction J4 (Skelmersdale) .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 1 May 2025 to 05:00 on 2 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 5.61 miles from Moss Bank.

Location: eastbound entry slip at junction J6 (Liverpool) from roundabout.
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 1 May 2025 to 4 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 5.46 miles from Moss Bank.

Location: northbound between the junctions with the A5038 and the M58 .
Lane Closures : Lane three will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 30 April 2025 to 05:00 on 1 May 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 9.07 miles from Moss Bank.

Location: northbound between junctions J6 (Kirkby) and J7 (Liverpool) .
Lane Closures : Lane three will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 30 April 2025 to 05:00 on 1 May 2025.
Lanes Closed : There will be one of five lanes closed.
Nearest town: 8.78 miles from Moss Bank.

Location: northbound between junctions J6 (Kirkby) and J7 (Liverpool) .
Lane Closures : Lane three will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 30 April 2025 to 05:00 on 1 May 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 8.55 miles from Moss Bank.

Location: westbound at the junction with the M57 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 30 April 2025 to 05:00 on 1 May 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 8.9 miles from Moss Bank.

Location: eastbound.
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 30 April 2025 to 05:00 on 1 May 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 8.92 miles from Moss Bank.

Location: southbound between the junctions with the A540 and the A494 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 16 May 2025 to 06:00 on 17 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 17.4 miles from Moss Bank.

Location: northbound between the A494 and the junction with the A540 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 16 May 2025 to 06:00 on 17 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.83 miles from Moss Bank.

Location: clockwise entry slip at junction J5 (Wythenshawe) .
Lane Closures : Lane one will be closed.
Due to: Road marking works are planned.
Status : Pending.
Schedule : From 20:00 on 27 April 2025 to 06:00 on 28 April 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.84 miles from Moss Bank.

Location: clockwise at junction J6 (Sale) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Road marking works are planned.
Status : Pending.
Schedule : From 20:00 on 27 April 2025 to 06:00 on 28 April 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 18.52 miles from Moss Bank.

Location: southbound between the M57 and the junction with the A5090 .
Lane Closures : Lane two will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 09:30 and 15:30 from 28 April 2025 to 2 May 2025.
Schedule : Expect disruption everyday between 09:30 and 15:30 from 5 May 2025 to 9 May 2025.
Schedule : Expect disruption everyday between 09:30 and 15:30 from 12 May 2025 to 15 May 2025.
Schedule : From 09:30 on 16 May 2025 to 15:15 on 16 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 9.44 miles from Moss Bank.

Location: northbound between the A5090 and the junction with the M58 .
Lane Closures : Lane two will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 09:30 and 15:30 from 28 April 2025 to 2 May 2025.
Schedule : Expect disruption everyday between 09:30 and 15:30 from 5 May 2025 to 9 May 2025.
Schedule : Expect disruption everyday between 09:30 and 15:30 from 12 May 2025 to 15 May 2025.
Schedule : From 09:30 on 16 May 2025 to 15:15 on 16 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 9.92 miles from Moss Bank.

Location: southbound between junctions J19 (Northwich) and J18 (Holmes Chapel) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Emergency roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 21:30 on 28 April 2025 to 05:00 on 29 April 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 18.7 miles from Moss Bank.

Location: southbound at junction J20A (Chester) .
Lane Closures : Lane three will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 28 April 2025 to 05:00 on 29 April 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 11.79 miles from Moss Bank.

Location: southbound between junctions J21 (Warrington) and J20 (Macclesfield) .
Lane Closures : Lanes 3 and 4 will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 28 April 2025 to 05:00 on 29 April 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 11.54 miles from Moss Bank.

Location: northbound at junction J20 (Macclesfield) .
Lane Closures : Lane three will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 28 April 2025 to 05:00 on 29 April 2025.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 12.43 miles from Moss Bank.

Location: northbound at junction J20 (Macclesfield) .
Lane Closures : Lane three will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 28 April 2025 to 05:00 on 29 April 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 12.67 miles from Moss Bank.

Location: northbound between junctions J3 (Tranmere) and J2 (West Kirby) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 08:00 on 1 May 2025 to 17:00 on 1 May 2025.
Nearest town: 15.31 miles from Moss Bank.

Location: northbound at junction J2 (West Kirby) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 08:00 on 1 May 2025 to 17:00 on 1 May 2025.
Nearest town: 15.21 miles from Moss Bank.

Location: northbound between junctions J3 (Tranmere) and J2 (West Kirby) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 08:00 on 1 May 2025 to 17:00 on 1 May 2025.
Nearest town: 15.31 miles from Moss Bank.

Location: northbound between junctions J6 and J8 .
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 08:00 on 1 May 2025 to 18:00 on 1 May 2025.
Nearest town: 12.19 miles from Moss Bank.

Location: clockwise between junctions J6 (Sale) and J8 (Carrington) through lane.
Due to: Litter clearance is planned.
Status : Pending.
Schedule : From 21:30 on 30 April 2025 to 05:00 on 1 May 2025.
Nearest town: 17.04 miles from Moss Bank.

Location: clockwise at junction J8 (Carrington) .
Due to: Litter clearance is planned.
Status : Pending.
Schedule : From 21:30 on 30 April 2025 to 05:00 on 1 May 2025.
Nearest town: 16.83 miles from Moss Bank.

Location: anticlockwise between junctions J8 (Carrington) and J6 (Sale) through lane.
Due to: Litter clearance is planned.
Status : Pending.
Schedule : From 21:30 on 30 April 2025 to 05:00 on 1 May 2025.
Nearest town: 16.56 miles from Moss Bank.

Location: anticlockwise exit slip at junction J7 (Altrincham) .
Lane Closures : Lane one will be closed.
Due to: Litter clearance is planned.
Status : Pending.
Schedule : From 21:30 on 30 April 2025 to 05:00 on 1 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 17.33 miles from Moss Bank.

Location: anticlockwise exit slip at junction J8 (Carrington) .
Due to: Litter clearance is planned.
Status : Pending.
Schedule : From 21:30 on 30 April 2025 to 05:00 on 1 May 2025.
Nearest town: 16.56 miles from Moss Bank.

Location: eastbound between junctions J1 (Kirkby) and J4 (Skelmersdale) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 30 April 2025 to 05:00 on 1 May 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 6.59 miles from Moss Bank.

Location: westbound between junctions J4 (Skelmersdale) and J1 (Kirkby) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 30 April 2025 to 05:00 on 1 May 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 5.89 miles from Moss Bank.

Location: eastbound entry slip at junction J2 (Manchester) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Litter clearance is planned.
Status : Pending.
Schedule : From 21:00 on 30 April 2025 to 05:00 on 1 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 17.97 miles from Moss Bank.

Location: anticlockwise entry slip at junction J6 (Sale) .
Lane Closures : Lane one will be closed.
Due to: Litter clearance is planned.
Status : Pending.
Schedule : From 21:00 on 30 April 2025 to 05:00 on 1 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.6 miles from Moss Bank.

Location: northbound between junctions J26 (Wigan) and J27 (Parbold) .
Lane Closures : Lane one will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 30 April 2025 to 2 May 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 5.55 miles from Moss Bank.

Location: anticlockwise between junctions J12 (Warrington) and J11 (Irlam) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 30 April 2025 to 06:00 on 1 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 14.99 miles from Moss Bank.

Location: anticlockwise between junctions J12 (Warrington) and J10 (Trafford Park) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 30 April 2025 to 06:00 on 1 May 2025.
Nearest town: 14.99 miles from Moss Bank.

Location: anticlockwise between junctions J11 (Irlam) and J10 (Trafford Park) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 30 April 2025 to 06:00 on 1 May 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 15.05 miles from Moss Bank.

Location: westbound exit slip at junction J6 (Liverpool) to M57 north.
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 7 May 2025 to 05:00 on 17 May 2025.
Nearest town: 5.33 miles from Moss Bank.

Location: westbound exit slip at junction J6 (Liverpool) to M57 north.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 05:00 from 7 May 2025 to 10 May 2025.
Schedule : Expect disruption everyday between 20:00 and 05:00 from 12 May 2025 to 17 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 5.7 miles from Moss Bank.

Location: westbound at junction J6 (Liverpool) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 05:00 from 7 May 2025 to 10 May 2025.
Schedule : Expect disruption everyday between 20:00 and 05:00 from 12 May 2025 to 17 May 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 5.33 miles from Moss Bank.

Location: northbound at junction J1 (Huyton) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 05:00 from 7 May 2025 to 10 May 2025.
Schedule : Expect disruption everyday between 20:00 and 05:00 from 12 May 2025 to 17 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 5.79 miles from Moss Bank.

Location: northbound between junctions J1 (Huyton) and J2 (Prescot) .
Lane Closures : Lanes 1 and 2 are closed.
Due to: Roadworks.
Period : expect disruption until 05:00 on 26 April 2025.
Lanes Closed : There are two of three lanes closed.
Nearest town: 5.22 miles from Moss Bank.

Location: northbound between junctions J1 (Huyton) and J2 (Prescot) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 05:00 from 7 May 2025 to 10 May 2025.
Schedule : Expect disruption everyday between 20:00 and 05:00 from 12 May 2025 to 17 May 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 5.16 miles from Moss Bank.

Location: eastbound between junctions J3 (Blackburn) and J4 (Blackburn) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 28 April 2025 to 30 April 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 19.1 miles from Moss Bank.

Location: westbound between junctions J4 (Blackburn) and J3 (Blackburn) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 28 April 2025 to 30 April 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 19.69 miles from Moss Bank.

Location: westbound between junctions J4 (Blackburn) and J3 (Blackburn) .
Lane Closures : Lane two will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 28 April 2025 to 30 April 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.47 miles from Moss Bank.

Location: westbound between junctions J10 (Northwich) and J11 (Runcorn) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 May 2025 to 31 May 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 11.17 miles from Moss Bank.

Location: westbound between junctions J10 (Northwich) and J11 (Runcorn) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 20:00 on 2 June 2025 to 06:00 on 3 June 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 26 June 2025 to 28 June 2025.
Schedule : From 22:00 on 2 July 2025 to 06:00 on 3 July 2025.
Schedule : From 20:00 on 3 July 2025 to 06:00 on 4 July 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 11.17 miles from Moss Bank.

Location: westbound between junctions J9 (Preston) and J10 (Northwich) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 19 May 2025 to 21 May 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 3 June 2025 to 7 June 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 9 June 2025 to 14 June 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 16 June 2025 to 18 June 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 11.75 miles from Moss Bank.

Location: westbound entry slip at junction J10 (Northwich) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 19 May 2025 to 23 May 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 27 May 2025 to 29 May 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 3 June 2025 to 7 June 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 9 June 2025 to 14 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 11.51 miles from Moss Bank.

Location: westbound between junctions J10 (Northwich) and J11 (Runcorn) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 19 May 2025 to 21 May 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 3 June 2025 to 7 June 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 9 June 2025 to 14 June 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 16 June 2025 to 18 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 11.5 miles from Moss Bank.

Location: westbound between junctions J9 (Preston) and J11 (Runcorn) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 21 May 2025 to 23 May 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 18 June 2025 to 21 June 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 23 June 2025 to 26 June 2025.
Schedule : From 20:00 on 4 July 2025 to 06:00 on 5 July 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 11.75 miles from Moss Bank.

Location: westbound between junctions J9 (Preston) and J11 (Runcorn) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 27 May 2025 to 29 May 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 11.75 miles from Moss Bank.

Location: westbound exit slip at junction J11 (Runcorn) .
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 19 May 2025 to 21 May 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 2 June 2025 to 7 June 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 9 June 2025 to 14 June 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 16 June 2025 to 18 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 10.5 miles from Moss Bank.

Location: northbound entry slip at junction J21A (Manchester) from M62 westbound.
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 21:00 on 1 May 2025 to 06:00 on 2 May 2025.
Nearest town: 8.49 miles from Moss Bank.

Location: northbound entry slip at junction J21A (Manchester) from M62 westbound.
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 1 May 2025 to 06:00 on 2 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 8.49 miles from Moss Bank.

Location: northbound entry slip at junction J21A (Manchester) from M62 eastbound.
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 1 May 2025 to 06:00 on 2 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 7.72 miles from Moss Bank.

Location: westbound between junctions J11 (Warrington) and J10 (M6) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 1 May 2025 to 06:00 on 2 May 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 9.37 miles from Moss Bank.

Location: eastbound exit slip at junction J10 (M6) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 1 May 2025 to 06:00 on 2 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 7.71 miles from Moss Bank.

Location: westbound between junctions J11 (Warrington) and J10 (M6) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 21:00 on 1 May 2025 to 06:00 on 2 May 2025.
Nearest town: 9.37 miles from Moss Bank.

Location: westbound at junction J10 (M6) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 1 May 2025 to 06:00 on 2 May 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 8.65 miles from Moss Bank.

Location: northbound between junctions J26 (Wigan) and J27 (Parbold) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 28 April 2025 to 06:00 on 29 April 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 4.68 miles from Moss Bank.

Location: southbound between junctions J27 (Parbold) and J26 (Wigan) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 29 April 2025 to 06:00 on 30 April 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 8.68 miles from Moss Bank.

Location: northbound between junctions J25 (Ashton in Makerfield) and J26 (Wigan) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 28 April 2025 to 06:00 on 29 April 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 4.44 miles from Moss Bank.

Location: northbound entry slip at junction J26 (Wigan) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 28 April 2025 to 06:00 on 29 April 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 4.91 miles from Moss Bank.

Location: westbound exit slip at junction J9 (Warrington) .
Lane Closures : Lane one will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 05:00 from 27 April 2025 to 30 April 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 6.84 miles from Moss Bank.

Location: westbound between junctions J10 (M6) and J9 (Warrington) .
Lane Closures : Lane one will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 05:00 from 27 April 2025 to 30 April 2025.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 7.23 miles from Moss Bank.

Location: anticlockwise between junctions J14 (St Helens) and J13 (Swinton) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 08:00 and 17:00 from 28 April 2025 to 30 April 2025.
Nearest town: 15.47 miles from Moss Bank.

Location: southbound at junction J8 .
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 08:00 on 30 April 2025 to 18:00 on 30 April 2025.
Nearest town: 14.71 miles from Moss Bank.

Location: southbound between the A5090 and the junction with the A567 .
Due to: Roadworks.
Period : expect disruption until 05:00 on 26 April 2025.
Lanes Closed : All lanes are closed.
Nearest town: 10.64 miles from Moss Bank.

Location: southbound between the A5038 and the junction with the A567 .
Lane Closures : Lane two is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 26 April 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 10.5 miles from Moss Bank.

Location: westbound exit slip at junction J3 (Southport) .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 29 April 2025 to 05:00 on 30 April 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 5.91 miles from Moss Bank.

Location: westbound between junctions J4 (Skelmersdale) and J1 (Kirkby) .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 29 April 2025 to 05:00 on 30 April 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 5.89 miles from Moss Bank.

Location: westbound entry slip at junction J3 (Southport) .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 29 April 2025 to 05:00 on 30 April 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 5.93 miles from Moss Bank.

Location: northbound between junctions J5 (Bebington) and J4 (Heswall) .
Lane Closures : Lane one will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 29 April 2025 to 1 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 14.47 miles from Moss Bank.

Location: southbound entry slip from the A56 .
Lane Closures : Lane one will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 29 April 2025 to 1 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 16.15 miles from Moss Bank.

Location: westbound entry slip at junction J8 .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 29 April 2025 to 1 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 16.04 miles from Moss Bank.

Location: northbound entry slip at junction J5 (Bebington) .
Lane Closures : Lane one will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 29 April 2025 to 1 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 14.52 miles from Moss Bank.

Location: northbound between junctions J5 (Bebington) and J4 (Heswall) .
Lane Closures : Lane one will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 29 April 2025 to 1 May 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 14.93 miles from Moss Bank.

Location: northbound exit slip at junction J4 (Heswall) .
Lane Closures : Lane one will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 29 April 2025 to 1 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 14.66 miles from Moss Bank.

Location: southbound entry slip at junction J21 (Warrington) .
Lane Closures : Lane one will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 21:00 on 29 April 2025 to 05:00 on 30 April 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 10.65 miles from Moss Bank.

Location: southbound exit slip at junction J3 (Huyton) .
Due to: Roadworks.
Period : expect disruption until 06:00 on 26 April 2025.
Lanes Closed : All lanes are closed.
Nearest town: 5.21 miles from Moss Bank.

Location: southbound exit slip at junction J2 (Prescot) .
Due to: Roadworks.
Period : expect disruption until 06:00 on 26 April 2025.
Lanes Closed : All lanes are closed.
Nearest town: 4.4 miles from Moss Bank.

Location: southbound entry slip at junction J4 (Knowsley) .
Due to: Roadworks.
Period : expect disruption until 06:00 on 26 April 2025.
Lanes Closed : All lanes are closed.
Nearest town: 5.63 miles from Moss Bank.

Location: southbound between junctions J4 (Knowsley) and J2 (Prescot) .
Due to: Roadworks.
Period : expect disruption until 06:00 on 26 April 2025.
Lanes Closed : All lanes are closed.
Nearest town: 5.7 miles from Moss Bank.

Location: westbound between junctions J9 (Preston) and J10 (Northwich) .
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 08:00 on 27 April 2025 to 17:00 on 27 April 2025.
Nearest town: 11.71 miles from Moss Bank.

Location: southbound between junctions J20A (Chester) and J19 (Northwich) .
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 08:00 on 28 April 2025 to 17:00 on 28 April 2025.
Nearest town: 14.7 miles from Moss Bank.

Location: northbound between junctions J4 (Heswall) and J3 (Tranmere) .
Lane Closures : Lane one will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 09:00 on 27 April 2025 to 15:00 on 28 April 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 15.08 miles from Moss Bank.

Location: anticlockwise at junction J14 (St Helens) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:30 on 28 April 2025 to 05:00 on 29 April 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 16.38 miles from Moss Bank.

Location: anticlockwise between junctions J17 (Prestwich) and J15 (Bolton) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:30 on 28 April 2025 to 05:00 on 29 April 2025.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 17.83 miles from Moss Bank.

Location: northbound entry slip at junction J1 from M60 anti-clockwise.
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:30 on 28 April 2025 to 05:00 on 29 April 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 16.38 miles from Moss Bank.

Location: northbound entry slip at junction J2 from A580.
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:30 on 28 April 2025 to 05:00 on 29 April 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 15.72 miles from Moss Bank.

Location: westbound between junctions J8 (Warrington) and J7 (Prescot) .
Lane Closures : Lane one will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 28 April 2025 to 05:00 on 29 April 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 4.39 miles from Moss Bank.

Location: anticlockwise exit slip at junction J16 (Salford) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:30 on 28 April 2025 to 05:00 on 29 April 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 17.36 miles from Moss Bank.

Location: northbound at junction J2 from A580 to A666.
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:30 on 28 April 2025 to 05:00 on 29 April 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 15.48 miles from Moss Bank.

Location: northbound at junction J2 for A666.
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:30 on 28 April 2025 to 05:00 on 29 April 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 15.53 miles from Moss Bank.

Location: southbound entry slip at junction J4 .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Litter clearance is planned.
Status : Pending.
Schedule : From 21:00 on 28 April 2025 to 05:00 on 29 April 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 13.11 miles from Moss Bank.

Location: anticlockwise exit slip at junction J14 (St Helens) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:30 on 28 April 2025 to 05:00 on 29 April 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 16.11 miles from Moss Bank.

Location: northbound exit slip at junction J3 .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:30 on 28 April 2025 to 05:00 on 29 April 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 15.22 miles from Moss Bank.

Location: southbound exit slip at junction J3 .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:30 on 28 April 2025 to 05:00 on 29 April 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 14.96 miles from Moss Bank.

Location: northbound between junction J2 and the A6053 .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:30 on 28 April 2025 to 05:00 on 29 April 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 15.09 miles from Moss Bank.

Location: southbound between junctions J4 and J2 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:30 on 28 April 2025 to 05:00 on 29 April 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 14.75 miles from Moss Bank.

Location: eastbound exit slip at junction J3 (Southport) .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 28 April 2025 to 05:00 on 29 April 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 6.1 miles from Moss Bank.

Location: eastbound entry slip at junction J3 (Southport) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 28 April 2025 to 05:00 on 29 April 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 6.02 miles from Moss Bank.

Location: eastbound between junctions J1 (Kirkby) and J4 (Skelmersdale) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 28 April 2025 to 05:00 on 29 April 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 6.68 miles from Moss Bank.

Location: westbound between junctions J10 (Northwich) and J11 (Runcorn) .
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 28 April 2025 to 05:00 on 29 April 2025.
Nearest town: 10.61 miles from Moss Bank.

Location: westbound between junctions J14 (Helsby) and J15 (Ellesmere Port) .
Lane Closures : Lane one will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 28 April 2025 to 05:00 on 29 April 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 15.32 miles from Moss Bank.

Location: westbound exit slip at junction J11 (Runcorn) .
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 28 April 2025 to 05:00 on 29 April 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 10.5 miles from Moss Bank.

Location: eastbound between junctions J9 (Preston) and J5 (Manchester) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 28 April 2025 to 06:00 on 20 September 2025.
Nearest town: 15.85 miles from Moss Bank.

Location: eastbound between junctions J6 (Hale) and J5 (Manchester) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 6 May 2025 to 06:00 on 7 May 2025.
Schedule : From 20:00 on 27 June 2025 to 06:00 on 28 June 2025.
Schedule : From 20:00 on 19 September 2025 to 06:00 on 20 September 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 19.63 miles from Moss Bank.

Location: eastbound between junctions J9 (Preston) and J6 (Hale) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 28 April 2025 to 06:00 on 29 April 2025.
Schedule : From 20:00 on 23 June 2025 to 06:00 on 24 June 2025.
Schedule : From 20:00 on 15 September 2025 to 06:00 on 16 September 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 15.85 miles from Moss Bank.

Location: westbound between junctions J6 (Hale) and J8 .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 8 May 2025 to 10 May 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 12 May 2025 to 14 May 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 1 July 2025 to 5 July 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 23 September 2025 to 25 September 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 19.65 miles from Moss Bank.

Location: westbound at junction J6 (Hale) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 7 May 2025 to 06:00 on 8 May 2025.
Schedule : From 20:00 on 30 June 2025 to 06:00 on 1 July 2025.
Schedule : From 20:00 on 22 September 2025 to 06:00 on 23 September 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 19.65 miles from Moss Bank.

Location: westbound entry slip at junction J6 (Hale) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 7 May 2025 to 06:00 on 8 May 2025.
Schedule : From 21:00 on 30 June 2025 to 06:00 on 1 July 2025.
Schedule : From 21:00 on 22 September 2025 to 06:00 on 23 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.76 miles from Moss Bank.

Location: eastbound between junctions J7 and J6 (Hale) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 April 2025 to 2 May 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 24 June 2025 to 27 June 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 16 September 2025 to 19 September 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 16.38 miles from Moss Bank.

Location: eastbound between junctions J7 and J6 (Hale) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 6 May 2025 to 06:00 on 7 May 2025.
Schedule : From 20:00 on 27 June 2025 to 06:00 on 28 June 2025.
Schedule : From 20:00 on 19 September 2025 to 06:00 on 20 September 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 18.58 miles from Moss Bank.

Location: eastbound entry slip at junction J6 (Hale) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 6 May 2025 to 06:00 on 7 May 2025.
Schedule : From 21:00 on 27 June 2025 to 06:00 on 28 June 2025.
Schedule : From 21:00 on 19 September 2025 to 06:00 on 20 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.57 miles from Moss Bank.

Location: westbound between junctions J5 (Manchester) and J6 (Hale) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 8 May 2025 to 10 May 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 12 May 2025 to 14 May 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 1 July 2025 to 5 July 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 23 September 2025 to 25 September 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 19.62 miles from Moss Bank.

Location: westbound between junctions J5 (Manchester) and J6 (Hale) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 7 May 2025 to 06:00 on 8 May 2025.
Schedule : From 20:00 on 30 June 2025 to 06:00 on 1 July 2025.
Schedule : From 20:00 on 22 September 2025 to 06:00 on 23 September 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 19.62 miles from Moss Bank.

Location: westbound between junctions J5 (Manchester) and J6 (Hale) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 14 May 2025 to 16 May 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 7 July 2025 to 9 July 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 September 2025 to 1 October 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 19.62 miles from Moss Bank.

Location: eastbound exit slip at junction J6 (Hale) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 6 May 2025 to 06:00 on 7 May 2025.
Schedule : From 21:00 on 27 June 2025 to 06:00 on 28 June 2025.
Schedule : From 21:00 on 19 September 2025 to 06:00 on 20 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.55 miles from Moss Bank.