Location: eastbound exit slip to the M1 .
Due to: Roadworks.
Period : from 20:17 on 30 April 2025 to 06:00 on 1 May 2025.
Lanes Closed : All lanes are closed.
Nearest town: 17.61 miles from Matlock Cliff.

Location: northbound entry slip from the A516 .
Due to: Roadworks.
Period : from 20:03 on 30 April 2025 to 06:00 on 1 May 2025.
Lanes Closed : All lanes are closed.
Nearest town: 15.61 miles from Matlock Cliff.

Location: westbound at the junction with the A5111 .
Due to: Roadworks.
Period : from 19:50 on 30 April 2025 to 06:00 on 1 May 2025.
Lanes Closed : All lanes are closed.
Nearest town: 15.48 miles from Matlock Cliff.

Location: southbound between the junctions with the M1 and the A61 Alfreton.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 1 May 2025 to 06:00 on 2 May 2025.
Schedule : From 20:00 on 14 May 2025 to 06:00 on 15 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 9.06 miles from Matlock Cliff.

Location: southbound exit slip at junction J28 (Matlock) .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 1 May 2025 to 3 May 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 7 May 2025 to 9 May 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 13 May 2025 to 17 May 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 19 May 2025 to 22 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 8.83 miles from Matlock Cliff.

Location: westbound between the A514 and the junction with the A511 .
Due to: Roadworks.
Period : from 13:43 on 30 April 2025 to 05:00 on 7 May 2025.
Nearest town: 18.09 miles from Matlock Cliff.

Location: northbound between junctions J28 (Matlock) and J29 (Chesterfield) .
Lane Closures : Lanes 1, 2 and 3 are closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 1 May 2025.
Lanes Closed : There are three of four lanes closed.
Nearest town: 8.53 miles from Matlock Cliff.

Location: southbound between junctions J29 (Chesterfield) and J28 (Matlock) .
Lane Closures : Lanes 1 and 2 are closed.
Due to: Planned Roadworks.
Period : expect disruption until 06:00 on 1 May 2025.
Lanes Closed : There are two of four lanes closed.
Nearest town: 9.28 miles from Matlock Cliff.

Location: northbound between the A6 and the junction with the A52 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 1 May 2025 to 06:00 on 2 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 15.51 miles from Matlock Cliff.

Location: eastbound entry slip from the A6005 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 1 May 2025 to 06:00 on 2 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 15.46 miles from Matlock Cliff.

Location: westbound entry slip from the A5111 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 1 May 2025 to 06:00 on 2 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 15.47 miles from Matlock Cliff.

Location: eastbound between the A5111 and the junction with the M1 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 1 May 2025 to 06:00 on 2 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 15.47 miles from Matlock Cliff.

Location: northbound between junctions J26 (Nottingham) and J27 (Mansfield) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 08:00 on 1 May 2025 to 17:00 on 1 May 2025.
Nearest town: 15.38 miles from Matlock Cliff.

Location: northbound between the junctions with the A52 and the A6 .
Lane Closures : Lane one is closed.
Due to: Litter Clearance.
Period : expect disruption until 06:00 on 1 May 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 13.43 miles from Matlock Cliff.

Location: northbound between the A50 and the junction with the A5111 .
Due to: Roadworks scheme.
Period : from 20:06 on 30 April 2025 to 06:00 on 7 May 2025.
Nearest town: 16.11 miles from Matlock Cliff.

Location: eastbound between the A5111 and the junction with the M1 .
Due to: Roadworks scheme.
Period : from 20:11 on 24 April 2025 to 06:00 on 3 May 2025.
Nearest town: 15.47 miles from Matlock Cliff.

Location: northbound exit slip at junction J29A (Markham Vale) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 1 May 2025 to 06:00 on 2 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 11.54 miles from Matlock Cliff.

Location: northbound entry slip at junction J29A (Markham Vale) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 1 May 2025 to 06:00 on 2 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 12.02 miles from Matlock Cliff.

Location: eastbound between the junctions with the A6464 and the A6514 .
Due to: Roadworks scheme.
Period : from 20:05 on 24 April 2025 to 06:00 on 18 April 2026.
Nearest town: 18.66 miles from Matlock Cliff.

Location: westbound between the junctions with the A6514 and the A6464 .
Due to: Roadworks scheme.
Period : from 20:05 on 24 April 2025 to 06:00 on 18 April 2026.
Nearest town: 19.14 miles from Matlock Cliff.

Location: northbound at the junction with the A61 Derby.
Lane Closures : Lane one is closed.
Due to: Horticultural works.
Period : expect disruption until 06:00 on 1 May 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 12.26 miles from Matlock Cliff.

Location: southbound at the junction with the A61 Derby.
Lane Closures : Lane one is closed.
Due to: Horticultural works.
Period : expect disruption until 06:00 on 1 May 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 12.28 miles from Matlock Cliff.

Location: northbound between junctions J29A (Markham Vale) and J30 (Chesterfield) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 1 May 2025 to 06:00 on 3 May 2025.
Nearest town: 11.68 miles from Matlock Cliff.

Location: northbound exit slip at Tibshelf Services.
Due to: Roadworks scheme.
Period : from 20:04 on 28 April 2025 to 06:00 on 1 May 2025.
Nearest town: 8.53 miles from Matlock Cliff.

Location: southbound exit slip at junction J28 (Matlock) .
Due to: Roadworks scheme.
Period : from 20:00 on 30 April 2025 to 06:00 on 23 May 2025.
Nearest town: 8.83 miles from Matlock Cliff.

Location: northbound between junctions J24 (E.
Mids Airport) and J28 (Matlock) .
Due to: Roadworks scheme.
Period : from 20:00 on 30 April 2025 to 06:00 on 17 May 2025.
Nearest town: 9 miles from Matlock Cliff.

Location: westbound between the A6007 and the junction with the M1 .
Due to: Roadworks scheme.
Period : from 20:00 on 30 April 2025 to 06:00 on 23 May 2025.
Nearest town: 17.9 miles from Matlock Cliff.

Location: northbound entry slip at junction J25 (Nottingham) .
Due to: Roadworks scheme.
Period : from 20:00 on 30 April 2025 to 06:00 on 23 May 2025.
Nearest town: 17.61 miles from Matlock Cliff.

Location: southbound between junctions J26 (Nottingham) and J25 (Nottingham) .
Due to: Roadworks scheme.
Period : from 20:00 on 30 April 2025 to 06:00 on 23 May 2025.
Nearest town: 17.7 miles from Matlock Cliff.

Location: eastbound entry slip from the M1 .
Due to: Roadworks scheme.
Period : from 20:00 on 30 April 2025 to 06:00 on 23 May 2025.
Nearest town: 17.64 miles from Matlock Cliff.

Location: southbound between junctions J31 (Worksop) and J29A (Markham Vale) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 7 May 2025 to 06:00 on 8 May 2025.
Nearest town: 16.04 miles from Matlock Cliff.

Location: southbound between junctions J31 (Worksop) and J29A (Markham Vale) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 7 May 2025 to 06:00 on 8 May 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 16.04 miles from Matlock Cliff.

Location: southbound entry slip at junction J30 (Chesterfield) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 7 May 2025 to 06:00 on 8 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 14.87 miles from Matlock Cliff.

Location: southbound between junctions J29A (Markham Vale) and J28 (Matlock) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 7 May 2025 to 06:00 on 14 May 2025.
Nearest town: 10.47 miles from Matlock Cliff.

Location: southbound between junctions J29 (Chesterfield) and J28 (Matlock) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 13 May 2025 to 06:00 on 14 May 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 8.66 miles from Matlock Cliff.

Location: southbound between the junctions with the A6 and the A52 .
Lane Closures : Lane one will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 20:00 on 7 May 2025 to 05:00 on 8 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 13.67 miles from Matlock Cliff.

Location: southbound between the junctions with the A52 and the A5111 .
Lane Closures : Lane one will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 20:00 on 7 May 2025 to 05:00 on 8 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 13.79 miles from Matlock Cliff.

Location: northbound at the junction with the A52 .
Lane Closures : Lane one will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 20:00 on 7 May 2025 to 05:00 on 8 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 13.76 miles from Matlock Cliff.

Location: southbound between junctions J29A (Markham Vale) and J28 (Matlock) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 7 May 2025 to 06:00 on 8 May 2025.
Schedule : From 20:00 on 9 May 2025 to 06:00 on 10 May 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 10.47 miles from Matlock Cliff.

Location: southbound entry slip at Tibshelf Services.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 9 May 2025 to 06:00 on 10 May 2025.
Schedule : From 20:00 on 13 May 2025 to 06:00 on 14 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 8.68 miles from Matlock Cliff.

Location: southbound exit slip at Tibshelf Services.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 9 May 2025 to 06:00 on 10 May 2025.
Schedule : From 20:00 on 13 May 2025 to 06:00 on 14 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 8.64 miles from Matlock Cliff.

Location: westbound between the junctions with the M1 and the A6 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 19:00 on 7 May 2025 to 05:00 on 8 May 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 18.95 miles from Matlock Cliff.

Location: eastbound between the junctions with the A38 and the A514 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 19:00 on 7 May 2025 to 05:00 on 8 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 18.02 miles from Matlock Cliff.

Location: westbound between the A6 and the junction with the A514 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 19:00 on 7 May 2025 to 05:00 on 8 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 18.76 miles from Matlock Cliff.

Location: eastbound between the junctions with the A514 and the A6 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 19:00 on 7 May 2025 to 05:00 on 8 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 18.96 miles from Matlock Cliff.

Location: eastbound between the A514 and the junction with the A6 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 19:00 on 7 May 2025 to 05:00 on 8 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.77 miles from Matlock Cliff.

Location: westbound entry slip from the M1 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 1 May 2025 to 3 May 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 6 May 2025 to 9 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 17.67 miles from Matlock Cliff.

Location: westbound between the A6007 and the junction with the M1 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 20 May 2025 to 06:00 on 21 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 17.9 miles from Matlock Cliff.

Location: eastbound exit slip to the M1 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 1 May 2025 to 3 May 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 6 May 2025 to 10 May 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 12 May 2025 to 17 May 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 19 May 2025 to 21 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 17.56 miles from Matlock Cliff.

Location: eastbound exit slip to the M1 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 21 May 2025 to 06:00 on 22 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 17.56 miles from Matlock Cliff.

Location: northbound between junctions J24 (E.
Mids Airport) and J25 (Nottingham) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 16 May 2025 to 06:00 on 17 May 2025.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 18.19 miles from Matlock Cliff.

Location: northbound exit slip at junction J25 (Nottingham) .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 1 May 2025 to 3 May 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 6 May 2025 to 10 May 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 12 May 2025 to 16 May 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 19 May 2025 to 23 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 17.87 miles from Matlock Cliff.

Location: northbound entry slip at junction J25 (Nottingham) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 15 May 2025 to 06:00 on 16 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 17.61 miles from Matlock Cliff.

Location: northbound exit slip at junction J25 (Nottingham) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 16 May 2025 to 06:00 on 17 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 17.87 miles from Matlock Cliff.

Location: southbound between junctions J26 (Nottingham) and J25 (Nottingham) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 9 May 2025 to 06:00 on 10 May 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 12 May 2025 to 15 May 2025.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 16.95 miles from Matlock Cliff.

Location: westbound exit slip to the M1 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 1 May 2025 to 3 May 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 6 May 2025 to 10 May 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 12 May 2025 to 17 May 2025.
Schedule : From 20:00 on 19 May 2025 to 06:00 on 20 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 17.7 miles from Matlock Cliff.

Location: westbound exit slip to the M1 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 20 May 2025 to 06:00 on 21 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 17.7 miles from Matlock Cliff.

Location: eastbound entry slip from the M1 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 19 May 2025 to 06:00 on 20 May 2025.
Schedule : From 20:00 on 22 May 2025 to 06:00 on 23 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 17.64 miles from Matlock Cliff.

Location: eastbound between the A5111 and the junction with the M1 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 21 May 2025 to 06:00 on 22 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 17.38 miles from Matlock Cliff.

Location: southbound exit slip at junction J25 (Nottingham) .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 1 May 2025 to 3 May 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 6 May 2025 to 9 May 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 15 May 2025 to 17 May 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 20 May 2025 to 22 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 17.46 miles from Matlock Cliff.

Location: southbound exit slip at junction J25 (Nottingham) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 9 May 2025 to 06:00 on 10 May 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 12 May 2025 to 15 May 2025.
Schedule : From 20:00 on 19 May 2025 to 06:00 on 20 May 2025.
Schedule : From 20:00 on 22 May 2025 to 06:00 on 23 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 17.46 miles from Matlock Cliff.

Location: northbound between junctions J24 (E.
Mids Airport) and J25 (Nottingham) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 19 May 2025 to 06:00 on 20 May 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 18.38 miles from Matlock Cliff.

Location: southbound between junctions J26 (Nottingham) and J25 (Nottingham) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 6 May 2025 to 06:00 on 7 May 2025.
Schedule : From 20:00 on 9 May 2025 to 06:00 on 10 May 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 16.44 miles from Matlock Cliff.

Location: northbound between junctions J24 (E.
Mids Airport) and J25 (Nottingham) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 14 May 2025 to 06:00 on 15 May 2025.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 18.28 miles from Matlock Cliff.

Location: northbound between the A61 Alfreton and the junction with the M1 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 7 May 2025 to 06:00 on 8 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 8.09 miles from Matlock Cliff.

Location: northbound between the junctions with the A61 Alfreton and the M1 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 6 May 2025 to 06:00 on 7 May 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 8 May 2025 to 10 May 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 12 May 2025 to 17 May 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 19 May 2025 to 23 May 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 9.02 miles from Matlock Cliff.

Location: northbound exit slip at junction J28 (Matlock) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 2 May 2025 to 06:00 on 3 May 2025.
Schedule : From 20:00 on 6 May 2025 to 06:00 on 7 May 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 8 May 2025 to 10 May 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 12 May 2025 to 14 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 9.31 miles from Matlock Cliff.

Location: northbound exit slip at junction J28 (Matlock) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 7 May 2025 to 06:00 on 8 May 2025.
Schedule : From 20:00 on 14 May 2025 to 06:00 on 15 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 9.31 miles from Matlock Cliff.

Location: southbound between junctions J29 (Chesterfield) and J28 (Matlock) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 6 May 2025 to 06:00 on 7 May 2025.
Schedule : From 20:00 on 9 May 2025 to 06:00 on 10 May 2025.
Schedule : From 20:00 on 12 May 2025 to 06:00 on 13 May 2025.
Schedule : From 20:00 on 22 May 2025 to 06:00 on 23 May 2025.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 8.64 miles from Matlock Cliff.

Location: southbound exit slip at junction J28 (Matlock) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 6 May 2025 to 06:00 on 7 May 2025.
Schedule : From 20:00 on 9 May 2025 to 06:00 on 10 May 2025.
Schedule : From 20:00 on 12 May 2025 to 06:00 on 13 May 2025.
Schedule : From 20:00 on 22 May 2025 to 06:00 on 23 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 8.83 miles from Matlock Cliff.

Location: westbound between the junctions with the A38 and the A516 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 6 May 2025 to 06:00 on 7 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 17.96 miles from Matlock Cliff.

Location: southbound entry slip at junction J28 (Matlock) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 19 May 2025 to 22 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 9.12 miles from Matlock Cliff.

Location: southbound entry slip at junction J28 (Matlock) (fast slip).
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 19 May 2025 to 22 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 9.13 miles from Matlock Cliff.

Location: northbound entry slip at junction J31 (Worksop) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 15 May 2025 to 06:00 on 16 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.35 miles from Matlock Cliff.

Location: southbound entry slip at junction J31 (Worksop) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 22 May 2025 to 06:00 on 23 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.33 miles from Matlock Cliff.

Location: northbound exit slip at junction J31 (Worksop) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 14 May 2025 to 06:00 on 15 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.02 miles from Matlock Cliff.

Location: southbound exit slip at junction J31 (Worksop) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 21 May 2025 to 06:00 on 22 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.62 miles from Matlock Cliff.

Location: northbound between junctions J30 (Chesterfield) and J32 (Doncaster) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 6 May 2025 to 06:00 on 16 May 2025.
Nearest town: 18.63 miles from Matlock Cliff.

Location: northbound between junctions J30 (Chesterfield) and J32 (Doncaster) .
Lane Closures : Lanes 3 and 4 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 6 May 2025 to 9 May 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 18.63 miles from Matlock Cliff.

Location: northbound between junctions J30 (Chesterfield) and J32 (Doncaster) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 9 May 2025 to 06:00 on 10 May 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 12 May 2025 to 16 May 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 18.63 miles from Matlock Cliff.

Location: northbound between junctions J29A (Markham Vale) and J30 (Chesterfield) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 7 May 2025 to 06:00 on 8 May 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 12 May 2025 to 14 May 2025.
Schedule : From 20:00 on 16 May 2025 to 06:00 on 17 May 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 11.68 miles from Matlock Cliff.

Location: southbound entry slip at junction J29A (Markham Vale) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 6 May 2025 to 06:00 on 10 May 2025.
Nearest town: 11.89 miles from Matlock Cliff.

Location: southbound entry slip at junction J29A (Markham Vale) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 6 May 2025 to 06:00 on 7 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 11.89 miles from Matlock Cliff.

Location: southbound exit slip at junction J29A (Markham Vale) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 6 May 2025 to 06:00 on 7 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 12.13 miles from Matlock Cliff.

Location: southbound between junctions J30 (Chesterfield) and J29A (Markham Vale) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 6 May 2025 to 06:00 on 7 May 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 8 May 2025 to 10 May 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 15.12 miles from Matlock Cliff.

Location: northbound between junctions J29A (Markham Vale) and J30 (Chesterfield) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 7 May 2025 to 06:00 on 17 May 2025.
Nearest town: 11.68 miles from Matlock Cliff.

Location: northbound exit slip at junction J30 (Chesterfield) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 12 May 2025 to 14 May 2025.
Schedule : From 20:00 on 16 May 2025 to 06:00 on 17 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 14.59 miles from Matlock Cliff.

Location: eastbound between the A6 and the junction with the M1 J24A .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 19:00 and 05:00 from 6 May 2025 to 10 May 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 18.77 miles from Matlock Cliff.

Location: westbound between the A6 and the junction with the A521 Blythe Bridge East.
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 19:00 and 05:00 from 6 May 2025 to 10 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 18.76 miles from Matlock Cliff.

Location: northbound.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 8 May 2025 to 06:00 on 9 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 7.15 miles from Matlock Cliff.

Location: southbound.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 9 May 2025 to 06:00 on 10 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 7.22 miles from Matlock Cliff.

Location: northbound entry slip from the A61 .
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 8 May 2025 to 06:00 on 9 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 6.49 miles from Matlock Cliff.

Location: northbound exit slip to the A61 .
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 8 May 2025 to 06:00 on 9 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 6.27 miles from Matlock Cliff.

Location: northbound between the A610 and the junction with the A61 Alfreton.
Lane Closures : Lane one will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 6 May 2025 to 06:00 on 7 May 2025.
Schedule : From 20:00 on 8 May 2025 to 06:00 on 9 May 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 14 May 2025 to 16 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 6.88 miles from Matlock Cliff.

Location: northbound.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 8 May 2025 to 06:00 on 9 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 7.28 miles from Matlock Cliff.

Location: southbound exit slip to the A61 .
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 9 May 2025 to 06:00 on 10 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 6.63 miles from Matlock Cliff.

Location: southbound entry slip from the A61 .
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 7 May 2025 to 06:00 on 8 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 6.47 miles from Matlock Cliff.

Location: southbound between the A61 Alfreton and the junction with the A610 .
Lane Closures : Lane one will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 7 May 2025 to 06:00 on 8 May 2025.
Schedule : From 20:00 on 9 May 2025 to 06:00 on 10 May 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 12 May 2025 to 17 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 6.48 miles from Matlock Cliff.

Location: southbound exit slip to the A610 .
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 7 May 2025 to 06:00 on 8 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 6.92 miles from Matlock Cliff.

Location: northbound exit slip to the A610 .
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 6 May 2025 to 06:00 on 7 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 7.03 miles from Matlock Cliff.

Location: northbound entry slip from the A610 .
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 6 May 2025 to 06:00 on 7 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 6.87 miles from Matlock Cliff.

Location: northbound between the junctions with the A61 Alfreton and the M1 .
Lane Closures : Lane one will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 12 May 2025 to 14 May 2025.
Schedule : From 20:00 on 16 May 2025 to 06:00 on 17 May 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 9.01 miles from Matlock Cliff.

Location: northbound between the junctions with the A61 Alfreton and the M1 .
Lane Closures : Lane one will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 12 May 2025 to 14 May 2025.
Schedule : From 20:00 on 16 May 2025 to 06:00 on 17 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 7.86 miles from Matlock Cliff.

Location: southbound.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 9 May 2025 to 06:00 on 10 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 7.34 miles from Matlock Cliff.

Location: southbound exit slip at junction J28 (Matlock) .
Lane Closures : Lane one will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 12 May 2025 to 14 May 2025.
Schedule : From 20:00 on 16 May 2025 to 06:00 on 17 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 8.83 miles from Matlock Cliff.

Location: southbound entry slip at junction J28 (Matlock) (fast slip).
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 13 May 2025 to 06:00 on 14 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 9.13 miles from Matlock Cliff.

Location: northbound between the junctions with the A50 and the A516 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 2 May 2025 to 06:00 on 3 May 2025.
Schedule : From 20:00 on 6 May 2025 to 06:00 on 7 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 16.11 miles from Matlock Cliff.

Location: northbound between the junctions with the A50 and the A5111 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 2 May 2025 to 06:00 on 3 May 2025.
Schedule : From 20:00 on 6 May 2025 to 06:00 on 7 May 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 15.44 miles from Matlock Cliff.

Location: northbound between junctions J33 (Sheffield) and J34 (Meadowhall) .
Lane Closures : Lanes 3 and 4 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 9 May 2025 to 06:00 on 10 May 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 12 May 2025 to 14 May 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 19.98 miles from Matlock Cliff.

Location: eastbound between the junctions with the A6464 and the A6514 .
Due to: Roadworks.
Period : expect disruption until 06:00 on 1 May 2025.
Nearest town: 19.06 miles from Matlock Cliff.

Location: eastbound between the junctions with the A6464 and the A6514 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 15 May 2025 to 06:00 on 16 May 2025.
Schedule : From 20:00 on 16 May 2025 to 06:00 on 19 May 2025.
Nearest town: 18.66 miles from Matlock Cliff.

Location: westbound between the junctions with the A6005 and the A6514 .
Lane Closures : Lane three is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 1 May 2025.
Lanes Closed : There is one of three lanes closed.
Nearest town: 19.46 miles from Matlock Cliff.

Location: eastbound between the junctions with the A6464 and the A6514 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 05:59 on 18 April 2026 to 06:00 on 18 April 2026.
Nearest town: 19.06 miles from Matlock Cliff.

Location: eastbound between the junctions with the A6464 and the A6514 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 05:59 on 18 April 2026 to 06:00 on 18 April 2026.
Nearest town: 19.06 miles from Matlock Cliff.

Location: eastbound between the junctions with the A6464 and the A6514 .
Due to: Roadworks.
Period : expect disruption until 06:00 on 1 May 2025.
Nearest town: 19.06 miles from Matlock Cliff.

Location: eastbound between the junctions with the A6464 and the A6514 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 15 May 2025 to 06:00 on 16 May 2025.
Schedule : From 20:00 on 16 May 2025 to 06:00 on 19 May 2025.
Nearest town: 18.66 miles from Matlock Cliff.

Location: westbound exit slip to the A6514 .
Lane Closures : Lane two is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 1 May 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 19.35 miles from Matlock Cliff.

Location: westbound between the junctions with the A6514 and the A6464 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 05:59 on 18 April 2026 to 06:00 on 18 April 2026.
Nearest town: 19.14 miles from Matlock Cliff.

Location: westbound between the junctions with the A6514 and the A6464 .
Due to: Roadworks.
Period : expect disruption until 06:00 on 1 May 2025.
Nearest town: 19.14 miles from Matlock Cliff.

Location: westbound between the junctions with the A6514 and the A6464 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 15 May 2025 to 06:00 on 16 May 2025.
Schedule : From 20:00 on 16 May 2025 to 06:00 on 19 May 2025.
Nearest town: 19.14 miles from Matlock Cliff.

Location: eastbound at the junction with the A5111 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 2 May 2025 to 06:00 on 3 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 15.47 miles from Matlock Cliff.

Location: southbound between junctions J27 (Mansfield) and J26 (Nottingham) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 08:00 and 17:00 from 1 May 2025 to 2 May 2025.
Nearest town: 14.81 miles from Matlock Cliff.

Location: northbound exit slip to the A610 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 09:30 and 15:30 from 1 May 2025 to 2 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 7.03 miles from Matlock Cliff.

Location: southbound exit slip to the A610 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 09:30 and 15:30 from 1 May 2025 to 2 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 6.94 miles from Matlock Cliff.

Location: southbound between the junctions with the A6 and the A52 .
Lane Closures : Lane one will be closed.
Due to: Litter clearance is planned.
Status : Pending.
Schedule : From 20:00 on 15 May 2025 to 05:00 on 16 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 12.65 miles from Matlock Cliff.

Location: northbound between junctions J25 (Nottingham) and J26 (Nottingham) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 12:00 on 12 May 2025 to 16:00 on 12 May 2025.
Nearest town: 17.22 miles from Matlock Cliff.

Location: northbound between the A61 Alfreton and the junction with the M1 .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 6 May 2025 to 06:00 on 17 May 2025.
Nearest town: 8.09 miles from Matlock Cliff.

Location: northbound between junctions J29A (Markham Vale) and J30 (Chesterfield) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 1 May 2025 to 3 May 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 11.68 miles from Matlock Cliff.

Location: northbound between the A61 Derby and the junction with the A610 .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 1 May 2025 to 3 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 11.58 miles from Matlock Cliff.

Location: southbound between the A610 and the junction with the A61 Derby.
Lane Closures : Lane one is closed.
Due to: Horticultural works.
Period : expect disruption until 06:00 on 2 May 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 9.55 miles from Matlock Cliff.

Location: eastbound between the A6 and the junction with the M1 J24A .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 19:00 and 05:00 from 1 May 2025 to 3 May 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 18.77 miles from Matlock Cliff.

Location: westbound between the junctions with the A516 and the A511 .
Lane Closures : Lane one will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 05:00 and 20:00 from 9 May 2025 to 11 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 17.74 miles from Matlock Cliff.

Location: westbound entry slip from the A516 .
Lane Closures : Lane one will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 05:00 from 8 May 2025 to 11 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 17.66 miles from Matlock Cliff.

Location: westbound between the A516 and the junction with the A511 .
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 05:00 from 8 May 2025 to 11 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 17.62 miles from Matlock Cliff.

Location: eastbound between the A511 and the junction with the A516 .
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 19:00 and 05:00 from 8 May 2025 to 11 May 2025.
Schedule : Expect disruption everyday between 19:00 and 05:00 from 15 May 2025 to 18 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.37 miles from Matlock Cliff.

Location: eastbound between the junctions with the A511 and the A516 .
Lane Closures : Lane one will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 05:00 and 19:00 from 9 May 2025 to 11 May 2025.
Schedule : Expect disruption everyday between 05:00 and 19:00 from 16 May 2025 to 18 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 18.27 miles from Matlock Cliff.

Location: westbound between the M1 and the junction with the A6 .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 19:00 and 05:00 from 1 May 2025 to 3 May 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 18.77 miles from Matlock Cliff.