Location: eastbound between junctions J16 (Swindon) and J14 (Hungerford) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 21:00 on 15 March 2025 to 06:00 on 17 April 2025.
Nearest town: 8.56 miles from Lambourn Woodlands.

Location: southbound entry slip from the M4 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 15 March 2025 to 05:00 on 16 March 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 10.68 miles from Lambourn Woodlands.

Location: southbound entry slip at Chieveley Services.
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 21:00 on 15 March 2025 to 05:00 on 16 March 2025.
Nearest town: 10.55 miles from Lambourn Woodlands.

Location: southbound entry slip at Chieveley Services.
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 15 March 2025 to 05:00 on 16 March 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 10.55 miles from Lambourn Woodlands.

Location: eastbound between junctions J17 (Chippenham) and J16 (Swindon) .
Lane Closures : The hard shoulder, lanes 1 and 2 are closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 15 March 2025.
Lanes Closed : There are two of three lanes closed.
Nearest town: 17.78 miles from Lambourn Woodlands.

Location: westbound between junctions J16 (Swindon) and J17 (Chippenham) .
Lane Closures : The hard shoulder, lanes 1 and 2 are closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 15 March 2025.
Lanes Closed : There are two of three lanes closed.
Nearest town: 15.9 miles from Lambourn Woodlands.

Location: westbound between junctions J14 (Hungerford) and J15 (Swindon) .
Due to: Roadworks scheme.
Period : from 21:00 on 13 March 2025 to 06:00 on 3 May 2025.
Nearest town: 3.39 miles from Lambourn Woodlands.

Location: eastbound between junctions J17 (Chippenham) and J16 (Swindon) .
Lane Closures : The hard shoulder is closed.
Due to: Emergency barrier repairs.
Period : expect disruption until 00:00 on 30 July 2025.
Nearest town: 17.23 miles from Lambourn Woodlands.

Location: eastbound between junctions J16 (Swindon) and J15 (Swindon) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 21 March 2025 to 06:00 on 22 March 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 12.22 miles from Lambourn Woodlands.

Location: westbound entry slip at junction J15 (Swindon) .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 21 March 2025 to 06:00 on 22 March 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 8.2 miles from Lambourn Woodlands.

Location: westbound between junctions J15 (Swindon) and J16 (Swindon) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 21:00 on 21 March 2025 to 06:00 on 22 March 2025.
Nearest town: 7.94 miles from Lambourn Woodlands.

Location: westbound between junctions J15 (Swindon) and J16 (Swindon) .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 21 March 2025 to 06:00 on 22 March 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 7.94 miles from Lambourn Woodlands.

Location: southbound between the A343 and the junction with the A303 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 21 March 2025 to 06:00 on 22 March 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 11.32 miles from Lambourn Woodlands.

Location: southbound.
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 21:00 on 21 March 2025 to 06:00 on 22 March 2025.
Nearest town: 11.32 miles from Lambourn Woodlands.

Location: southbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 21 March 2025 to 06:00 on 22 March 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.83 miles from Lambourn Woodlands.

Location: southbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 21 March 2025 to 06:00 on 22 March 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 16.46 miles from Lambourn Woodlands.

Location: southbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 21 March 2025 to 06:00 on 22 March 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 16.16 miles from Lambourn Woodlands.

Location: southbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 21 March 2025 to 06:00 on 22 March 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 14.29 miles from Lambourn Woodlands.

Location: southbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 21 March 2025 to 06:00 on 22 March 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 12.48 miles from Lambourn Woodlands.

Location: southbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 21 March 2025 to 06:00 on 22 March 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 12.74 miles from Lambourn Woodlands.

Location: eastbound between junctions J17 (Chippenham) and J16 (Swindon) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 08:00 on 21 March 2025 to 18:00 on 21 March 2025.
Nearest town: 14.78 miles from Lambourn Woodlands.

Location: westbound between junctions J15 (Swindon) and J16 (Swindon) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 08:00 on 21 March 2025 to 18:00 on 21 March 2025.
Nearest town: 13.33 miles from Lambourn Woodlands.

Location: westbound between junctions J13 (Newbury) and J14 (Hungerford) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 20 March 2025 to 06:00 on 21 March 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 9.55 miles from Lambourn Woodlands.

Location: westbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 17 March 2025 to 21 March 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 24 March 2025 to 28 March 2025.
Schedule : From 21:00 on 31 March 2025 to 06:00 on 1 April 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 3 April 2025 to 5 April 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 0.73 miles from Lambourn Woodlands.

Location: westbound between junctions J14 (Hungerford) and J15 (Swindon) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 06:00 and 20:00 from 25 March 2025 to 27 March 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 4.88 miles from Lambourn Woodlands.

Location: westbound between junctions J14 (Hungerford) and J15 (Swindon) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 06:00 on 20 March 2025 to 20:00 on 20 March 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 4.38 miles from Lambourn Woodlands.

Location: westbound between junctions J14 (Hungerford) and J15 (Swindon) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 21 March 2025 to 23 March 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 4.88 miles from Lambourn Woodlands.

Location: westbound between junctions J14 (Hungerford) and J15 (Swindon) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 06:00 on 19 March 2025 to 20:00 on 19 March 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 4.09 miles from Lambourn Woodlands.

Location: westbound between junctions J14 (Hungerford) and J15 (Swindon) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 06:00 on 18 March 2025 to 20:00 on 18 March 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 4.27 miles from Lambourn Woodlands.

Location: eastbound entry slip at junction J15 (Swindon) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 15 March 2025 to 17 March 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 7 April 2025 to 12 April 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 14 April 2025 to 17 April 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 8.17 miles from Lambourn Woodlands.

Location: eastbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 15 March 2025 to 17 March 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 7 April 2025 to 12 April 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 14 April 2025 to 17 April 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 0.67 miles from Lambourn Woodlands.

Location: westbound exit slip at junction J15 (Swindon) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 17 March 2025 to 21 March 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 24 March 2025 to 28 March 2025.
Schedule : From 21:00 on 31 March 2025 to 06:00 on 1 April 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 3 April 2025 to 5 April 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 7.94 miles from Lambourn Woodlands.

Location: westbound exit slip at Membury Services.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 17 March 2025 to 21 March 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 24 March 2025 to 28 March 2025.
Schedule : From 21:00 on 31 March 2025 to 06:00 on 1 April 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 3 April 2025 to 5 April 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 0.49 miles from Lambourn Woodlands.

Location: eastbound exit slip at Membury Services.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 15 March 2025 to 17 March 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 7 April 2025 to 12 April 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 14 April 2025 to 17 April 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 0.84 miles from Lambourn Woodlands.

Location: westbound between junctions J14 (Hungerford) and J15 (Swindon) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 14 March 2025 to 06:00 on 15 March 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 17 March 2025 to 21 March 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 24 March 2025 to 28 March 2025.
Schedule : From 21:00 on 31 March 2025 to 06:00 on 1 April 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 3.39 miles from Lambourn Woodlands.

Location: eastbound between junctions J16 (Swindon) and J14 (Hungerford) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 15 March 2025 to 17 March 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 7 April 2025 to 12 April 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 14 April 2025 to 17 April 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 8.56 miles from Lambourn Woodlands.

Location: westbound at junction J14 (Hungerford) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 17 March 2025 to 21 March 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 24 March 2025 to 28 March 2025.
Schedule : From 21:00 on 31 March 2025 to 06:00 on 1 April 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 3 April 2025 to 5 April 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 3.7 miles from Lambourn Woodlands.

Location: eastbound exit slip at junction J14 (Hungerford) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 15 March 2025 to 17 March 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 7 April 2025 to 12 April 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 14 April 2025 to 17 April 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 3.11 miles from Lambourn Woodlands.

Location: eastbound at junction J16 (Swindon) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 09:00 on 19 March 2025 to 16:00 on 19 March 2025.
Nearest town: 14 miles from Lambourn Woodlands.

Location: westbound entry slip at junction J15 (Swindon) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 09:00 on 20 March 2025 to 16:00 on 20 March 2025.
Nearest town: 8.2 miles from Lambourn Woodlands.

Location: northbound exit slip to the A420 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 09:00 on 20 March 2025 to 15:00 on 20 March 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 10.2 miles from Lambourn Woodlands.

Location: eastbound between junctions J14 (Hungerford) and J13 (Newbury) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 17 March 2025 to 06:00 on 19 March 2025.
Nearest town: 5.46 miles from Lambourn Woodlands.

Location: eastbound between junctions J14 (Hungerford) and J13 (Newbury) .
Lane Closures : Lane three will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 17 March 2025 to 06:00 on 18 March 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 5.46 miles from Lambourn Woodlands.

Location: eastbound between junctions J14 (Hungerford) and J13 (Newbury) .
Lane Closures : Lane three will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 18 March 2025 to 06:00 on 19 March 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 7.49 miles from Lambourn Woodlands.

Location: westbound between junctions J13 (Newbury) and J14 (Hungerford) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 17 March 2025 to 06:00 on 19 March 2025.
Nearest town: 10.66 miles from Lambourn Woodlands.

Location: westbound between junctions J13 (Newbury) and J14 (Hungerford) .
Lane Closures : Lane three will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 17 March 2025 to 06:00 on 18 March 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 7.98 miles from Lambourn Woodlands.

Location: westbound between junctions J13 (Newbury) and J14 (Hungerford) .
Lane Closures : Lane three will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 18 March 2025 to 06:00 on 19 March 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 10.66 miles from Lambourn Woodlands.

Location: southbound entry slip from the A4130 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 19 March 2025 to 21 March 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 14.81 miles from Lambourn Woodlands.

Location: southbound between the A415 and the junction with the M4 .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 21:00 on 19 March 2025 to 06:00 on 21 March 2025.
Nearest town: 14.85 miles from Lambourn Woodlands.

Location: southbound between the A415 and the junction with the M4 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 19 March 2025 to 21 March 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 14.85 miles from Lambourn Woodlands.

Location: southbound exit slip to the A4185 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 19 March 2025 to 21 March 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 13.29 miles from Lambourn Woodlands.

Location: northbound between the M4 and the junction with the A4185 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 18 March 2025 to 06:00 on 19 March 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 12.6 miles from Lambourn Woodlands.

Location: northbound exit slip to the A343 .
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 22:30 on 17 March 2025 to 06:00 on 18 March 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 11.41 miles from Lambourn Woodlands.

Location: northbound exit slip to the A343 .
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 22:30 on 17 March 2025 to 06:00 on 18 March 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 11.38 miles from Lambourn Woodlands.

Location: northbound entry slip from the A343 .
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 22:30 on 17 March 2025 to 06:00 on 18 March 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 11.42 miles from Lambourn Woodlands.

Location: northbound between the A303 and the junction with the A343 .
Lane Closures : Lane one will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 22:30 on 17 March 2025 to 06:00 on 18 March 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 11.74 miles from Lambourn Woodlands.

Location: eastbound between junctions J17 (Chippenham) and J16 (Swindon) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 17 March 2025 to 19 March 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 18.89 miles from Lambourn Woodlands.

Location: westbound between junctions J16 (Swindon) and J17 (Chippenham) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 17 March 2025 to 19 March 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 15.03 miles from Lambourn Woodlands.

Location: westbound between junctions J12 (Reading) and J13 (Newbury) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 17 March 2025 to 21 March 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 16.09 miles from Lambourn Woodlands.

Location: eastbound between junctions J13 (Newbury) and J12 (Reading) .
Lane Closures : Lane three will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 17 March 2025 to 21 March 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 15.07 miles from Lambourn Woodlands.

Location: eastbound between junctions J13 (Newbury) and J12 (Reading) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 17 March 2025 to 06:00 on 22 March 2025.
Nearest town: 19.53 miles from Lambourn Woodlands.

Location: eastbound between junctions J13 (Newbury) and J12 (Reading) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 19 March 2025 to 22 March 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 19.53 miles from Lambourn Woodlands.

Location: eastbound between junctions J13 (Newbury) and J12 (Reading) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 17 March 2025 to 19 March 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 19.53 miles from Lambourn Woodlands.

Location: eastbound between junctions J16 (Swindon) and J15 (Swindon) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 08:00 on 17 March 2025 to 18:00 on 17 March 2025.
Nearest town: 9.19 miles from Lambourn Woodlands.

Location: eastbound between junctions J16 (Swindon) and J15 (Swindon) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 09:00 and 16:00 from 17 March 2025 to 19 March 2025.
Nearest town: 11.14 miles from Lambourn Woodlands.

Location: westbound between the A3093 and the junction with the A3057 .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 21:00 on 31 March 2025 to 06:00 on 5 April 2025.
Nearest town: 19.52 miles from Lambourn Woodlands.

Location: westbound between the A3093 and the junction with the A3057 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 31 March 2025 to 5 April 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.52 miles from Lambourn Woodlands.

Location: westbound entry slip from the A3093 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 31 March 2025 to 5 April 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.23 miles from Lambourn Woodlands.

Location: westbound exit slip to the A3057 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 31 March 2025 to 5 April 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.5 miles from Lambourn Woodlands.