Location: westbound between the junctions with the A269 Bexhill West and the A27 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 08:00 on 25 November 2024 to 18:00 on 6 December 2024.
Nearest town: 14.55 miles from Framfield.
Location: eastbound between the junctions with the A27 and the A269 Bexhill West.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 08:00 on 25 November 2024 to 18:00 on 6 December 2024.
Nearest town: 14.48 miles from Framfield.
Location: eastbound between the junctions with the A27 and the A269 Bexhill West.
Due to: Emergency roadworks.
Period : expect disruption until 08:00 on 25 November 2024.
Nearest town: 14.26 miles from Framfield.
Location: westbound between the junctions with the A269 Bexhill West and the A27 .
Due to: Emergency roadworks.
Period : expect disruption until 08:00 on 25 November 2024.
Nearest town: 14.43 miles from Framfield.
Location: eastbound between the A23 and the junction with the A26 North.
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 25 November 2024 to 06:00 on 29 November 2024.
Nearest town: 9.5 miles from Framfield.
Location: westbound between the A26 North and the junction with the A277 .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 25 November 2024 to 06:00 on 29 November 2024.
Nearest town: 7.56 miles from Framfield.
Location: westbound between the junctions with the A2270 and the A26 South.
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 25 November 2024 to 06:00 on 30 November 2024.
Nearest town: 7.49 miles from Framfield.
Location: eastbound between the junctions with the A26 North and the A26 South.
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 25 November 2024 to 06:00 on 30 November 2024.
Nearest town: 7.52 miles from Framfield.
Location: northbound.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 25 November 2024 to 06:00 on 26 November 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 19.67 miles from Framfield.
Location: northbound between junctions J9 (Gatwick Airport) and J8 (Reigate) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 25 November 2024 to 06:00 on 26 November 2024.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 19.4 miles from Framfield.
Location: northbound between the junctions with the A262 and the A228 .
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 07:00 on 25 November 2024 to 19:00 on 27 November 2024.
Nearest town: 15.67 miles from Framfield.
Location: southbound between the junctions with the A228 and the A262 .
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 07:00 on 25 November 2024 to 19:00 on 27 November 2024.
Nearest town: 15.67 miles from Framfield.
Location: northbound.
Due to: Roadworks scheme.
Period : from 20:07 on 22 November 2024 to 06:00 on 2 December 2024.
Nearest town: 16.54 miles from Framfield.
Location: westbound between the junctions with the A269 Bexhill West and the A27 .
Due to: Emergency roadworks.
Period : expect disruption until 06:00 on 25 November 2024.
Nearest town: 14.72 miles from Framfield.
Location: eastbound between the junctions with the A27 and the A269 Bexhill West.
Due to: Emergency roadworks.
Period : expect disruption until 06:00 on 25 November 2024.
Nearest town: 14.71 miles from Framfield.
Location: eastbound between the A23 and the junction with the A270 Brighton East.
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 25 November 2024 to 06:00 on 19 December 2024.
Nearest town: 13.61 miles from Framfield.
Location: northbound at junction J11 (Brighton) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 25 November 2024 to 30 November 2024.
Schedule : From 20:00 on 2 December 2024 to 06:00 on 3 December 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 17.22 miles from Framfield.
Location: northbound between the A272 and the junction with the M23 .
Due to: Roadworks scheme.
Period : from 20:02 on 20 November 2024 to 06:00 on 3 December 2024.
Nearest town: 14.66 miles from Framfield.
Location: northbound between the A272 and the junction with the M23 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 25 November 2024 to 30 November 2024.
Schedule : From 20:00 on 2 December 2024 to 06:00 on 3 December 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 14.66 miles from Framfield.
Location: northbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 25 November 2024 to 30 November 2024.
Schedule : From 20:00 on 2 December 2024 to 06:00 on 3 December 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 15.14 miles from Framfield.
Location: northbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 25 November 2024 to 30 November 2024.
Schedule : From 20:00 on 2 December 2024 to 06:00 on 3 December 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 16.18 miles from Framfield.
Location: northbound.
Due to: Roadworks.
Period : expect disruption until 06:00 on 31 January 2025.
Nearest town: 18.82 miles from Framfield.
Location: southbound.
Due to: Roadworks.
Period : expect disruption until 06:00 on 31 January 2025.
Nearest town: 18.85 miles from Framfield.
Location: westbound between the junctions with the A269 Bexhill West and the A27 .
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 30 November 2024 to 06:00 on 1 December 2024.
Nearest town: 14.75 miles from Framfield.
Location: eastbound between the junctions with the A27 and the A269 Bexhill West.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 30 November 2024 to 06:00 on 1 December 2024.
Nearest town: 14.73 miles from Framfield.
Location: eastbound between the junctions with the A27 and the A269 Bexhill West.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 29 November 2024 to 06:00 on 30 November 2024.
Nearest town: 15.92 miles from Framfield.
Location: westbound between the junctions with the A269 Bexhill West and the A27 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 29 November 2024 to 06:00 on 30 November 2024.
Nearest town: 15.98 miles from Framfield.
Location: southbound between the A265 and the junction with the A2100 north of Battle.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 29 November 2024 to 06:00 on 30 November 2024.
Nearest town: 15.13 miles from Framfield.
Location: southbound between the A265 and the junction with the A2100 north of Battle.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 29 November 2024 to 06:00 on 30 November 2024.
Nearest town: 15.4 miles from Framfield.
Location: northbound between the A2100 north of Battle and the junction with the A265 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 29 November 2024 to 06:00 on 30 November 2024.
Nearest town: 15.19 miles from Framfield.
Location: northbound between the A2100 north of Battle and the junction with the A265 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 29 November 2024 to 06:00 on 30 November 2024.
Nearest town: 15.38 miles from Framfield.
Location: northbound.
Due to: Roadworks.
Period : expect disruption until 00:00 on 20 December 2024.
Nearest town: 18.82 miles from Framfield.
Location: southbound.
Due to: Roadworks.
Period : expect disruption until 00:00 on 20 December 2024.
Nearest town: 18.82 miles from Framfield.
Location: northbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 19 December 2024 to 06:00 on 20 December 2024.
Schedule : From 20:00 on 2 January 2025 to 06:00 on 3 January 2025.
Schedule : From 20:00 on 30 January 2025 to 06:00 on 31 January 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.83 miles from Framfield.
Location: southbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 19 December 2024 to 06:00 on 20 December 2024.
Schedule : From 20:00 on 2 January 2025 to 06:00 on 3 January 2025.
Schedule : From 20:00 on 30 January 2025 to 06:00 on 31 January 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.85 miles from Framfield.
Location: southbound between the A265 and the junction with the A2100 north of Battle.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 09:30 on 26 November 2024 to 15:30 on 26 November 2024.
Nearest town: 15.4 miles from Framfield.
Location: northbound between the A2100 north of Battle and the junction with the A265 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 09:30 on 26 November 2024 to 15:30 on 26 November 2024.
Nearest town: 15.37 miles from Framfield.
Location: southbound between the junctions with the A228 and the A262 .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 28 November 2024 to 06:00 on 14 December 2024.
Nearest town: 15.92 miles from Framfield.
Location: southbound between the junctions with the A228 and the A262 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 28 November 2024 to 30 November 2024.
Nearest town: 15.72 miles from Framfield.
Location: southbound between the junctions with the A228 and the A262 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 9 December 2024 to 14 December 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 15.92 miles from Framfield.
Location: northbound between the junctions with the A262 and the A228 .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 28 November 2024 to 06:00 on 14 December 2024.
Nearest town: 16.07 miles from Framfield.
Location: northbound between the junctions with the A262 and the A228 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 28 November 2024 to 30 November 2024.
Nearest town: 15.67 miles from Framfield.
Location: northbound between the junctions with the A262 and the A228 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 9 December 2024 to 14 December 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 16.07 miles from Framfield.
Location: northbound between the junctions with the A2100 north of Battle and the A265 .
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 28 November 2024 to 06:00 on 29 November 2024.
Nearest town: 15.16 miles from Framfield.
Location: southbound between the junctions with the A265 and the A2100 north of Battle.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 28 November 2024 to 06:00 on 29 November 2024.
Nearest town: 15.14 miles from Framfield.
Location: northbound at junction J10 (Crawley) .
Lane Closures : Lane one will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 20:00 on 28 November 2024 to 05:00 on 29 November 2024.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 17.38 miles from Framfield.
Location: northbound between junctions J10 (Crawley) and J9 (Gatwick Airport) .
Lane Closures : Lane one will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 20:00 on 28 November 2024 to 05:00 on 29 November 2024.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 17.68 miles from Framfield.
Location: northbound between the junctions with the A2100 north of Battle and the A265 .
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 28 November 2024 to 06:00 on 29 November 2024.
Nearest town: 15.4 miles from Framfield.
Location: southbound between the junctions with the A265 and the A2100 north of Battle.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 28 November 2024 to 06:00 on 29 November 2024.
Nearest town: 15.4 miles from Framfield.
Location: westbound between the junctions with the A259 and the A22 Polegate East.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 27 November 2024 to 06:00 on 28 November 2024.
Nearest town: 10.87 miles from Framfield.
Location: eastbound between the junctions with the A22 Polegate East and the A259 .
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 27 November 2024 to 06:00 on 28 November 2024.
Nearest town: 10.85 miles from Framfield.
Location: southbound between the A265 and the junction with the A2100 north of Battle.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 20:00 on 27 November 2024 to 06:00 on 28 November 2024.
Nearest town: 15.4 miles from Framfield.
Location: northbound between the A2100 north of Battle and the junction with the A265 .
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 20:00 on 27 November 2024 to 06:00 on 28 November 2024.
Nearest town: 15.38 miles from Framfield.
Location: northbound between the A265 and the junction with the A262 .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 22:00 on 27 November 2024 to 06:00 on 28 November 2024.
Nearest town: 15.5 miles from Framfield.
Location: northbound between the A229 and the junction with the A262 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 27 November 2024 to 06:00 on 28 November 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 15.35 miles from Framfield.
Location: southbound between the A262 and the junction with the A265 .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 22:00 on 27 November 2024 to 06:00 on 28 November 2024.
Nearest town: 15.41 miles from Framfield.
Location: southbound between the A268 and the junction with the A265 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 27 November 2024 to 06:00 on 28 November 2024.
Nearest town: 15.35 miles from Framfield.
Location: southbound between the A262 and the junction with the A229 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 27 November 2024 to 06:00 on 28 November 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 15.41 miles from Framfield.
Location: northbound between the A265 and the junction with the A268 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 27 November 2024 to 06:00 on 28 November 2024.
Nearest town: 15.5 miles from Framfield.
Location: northbound between the A26 Tonbridge East and the junction with the A25 West.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 2 December 2024 to 4 December 2024.
Schedule : From 20:00 on 7 December 2024 to 06:00 on 8 December 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 9 December 2024 to 19 December 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 17.2 miles from Framfield.
Location: northbound entry slip from the A26 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 2 December 2024 to 4 December 2024.
Schedule : From 20:00 on 7 December 2024 to 06:00 on 8 December 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 9 December 2024 to 19 December 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 17.27 miles from Framfield.
Location: northbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 2 December 2024 to 4 December 2024.
Schedule : From 20:00 on 7 December 2024 to 06:00 on 8 December 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 9 December 2024 to 19 December 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 16.91 miles from Framfield.
Location: northbound entry slip from the A26 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 2 December 2024 to 4 December 2024.
Schedule : From 20:00 on 7 December 2024 to 06:00 on 8 December 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 9 December 2024 to 19 December 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 16.84 miles from Framfield.
Location: southbound between the A228 and the junction with the A262 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 9 December 2024 to 14 December 2024.
Schedule : From 20:00 on 16 December 2024 to 06:00 on 17 December 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 15.41 miles from Framfield.
Location: westbound at the junction with the A26 North.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 25 November 2024 to 06:00 on 26 November 2024.
Schedule : From 20:00 on 28 November 2024 to 06:00 on 29 November 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 7.56 miles from Framfield.
Location: eastbound at the junction with the A26 North.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 25 November 2024 to 06:00 on 26 November 2024.
Schedule : From 20:00 on 28 November 2024 to 06:00 on 29 November 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 7.57 miles from Framfield.
Location: eastbound at the junction with the A277 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 26 November 2024 to 28 November 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 8.9 miles from Framfield.
Location: eastbound between the junctions with the A23 and the A277 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 25 November 2024 to 29 November 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 9.5 miles from Framfield.
Location: westbound at the junction with the A277 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 26 November 2024 to 28 November 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 8.88 miles from Framfield.
Location: westbound between the junctions with the A23 and the A2038 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 25 November 2024 to 28 November 2024.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 13.98 miles from Framfield.
Location: westbound between the junctions with the A26 North and the A277 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 25 November 2024 to 29 November 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 8.13 miles from Framfield.
Location: eastbound between the junctions with the A27 and the A269 Bexhill West.
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 25 November 2024 to 30 November 2024.
Nearest town: 14.08 miles from Framfield.
Location: westbound between the junctions with the A269 Bexhill West and the A27 .
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 25 November 2024 to 30 November 2024.
Nearest town: 14.36 miles from Framfield.
Location: westbound between the junctions with the A2270 and the A26 South.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 28 November 2024 to 30 November 2024.
Nearest town: 7.49 miles from Framfield.
Location: eastbound between the junctions with the A26 North and the A26 South.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 25 November 2024 to 28 November 2024.
Nearest town: 7.52 miles from Framfield.
Location: westbound between the junctions with the A259 and the A22 Polegate East.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 25 November 2024 to 30 November 2024.
Nearest town: 11.81 miles from Framfield.
Location: eastbound between the junctions with the A22 Polegate East and the A259 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 25 November 2024 to 30 November 2024.
Nearest town: 11.58 miles from Framfield.
Location: eastbound between the junctions with the A26 South and the A2270 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 28 November 2024 to 30 November 2024.
Nearest town: 7.5 miles from Framfield.
Location: westbound between the A26 South and the junction with the A26 North.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 25 November 2024 to 28 November 2024.
Nearest town: 7.52 miles from Framfield.
Location: northbound.
Due to: Roadworks.
Period : expect disruption until 06:00 on 25 November 2024.
Lanes Closed : All lanes are closed.
Nearest town: 16.54 miles from Framfield.
Location: northbound.
Due to: Roadworks.
Period : expect disruption until 06:00 on 25 November 2024.
Lanes Closed : All lanes are closed.
Nearest town: 16.47 miles from Framfield.
Location: northbound between the A228 and the junction with the A26 .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 25 November 2024.
Lanes Closed : There is one of two lanes closed.
Nearest town: 15.93 miles from Framfield.
Location: southbound between the A26 and the junction with the A262 .
Lane Closures : Lane two is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 25 November 2024.
Lanes Closed : There is one of two lanes closed.
Nearest town: 16.09 miles from Framfield.
Location: eastbound between the junctions with the A26 South and the A2270 .
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 2 December 2024 to 7 December 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 9 December 2024 to 14 December 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 16 December 2024 to 20 December 2024.
Schedule : From 20:00 on 2 January 2025 to 06:00 on 3 January 2025.
Nearest town: 8.58 miles from Framfield.
Location: westbound between the junctions with the A2270 and the A26 South.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 2 December 2024 to 7 December 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 9 December 2024 to 14 December 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 16 December 2024 to 20 December 2024.
Schedule : From 20:00 on 2 January 2025 to 06:00 on 3 January 2025.
Nearest town: 8.62 miles from Framfield.
Location: westbound between the A270 Brighton East and the junction with the A23 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 2 December 2024 to 7 December 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 9 December 2024 to 13 December 2024.
Schedule : From 20:00 on 19 December 2024 to 06:00 on 20 December 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 11.64 miles from Framfield.
Location: westbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 2 December 2024 to 7 December 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 9 December 2024 to 13 December 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 11.07 miles from Framfield.
Location: westbound between the A270 Brighton East and the junction with the A23 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 6 January 2025 to 11 January 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 12.86 miles from Framfield.
Location: westbound entry slip from the A23 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 13 January 2025 to 16 January 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 13.65 miles from Framfield.
Location: eastbound between the A23 and the junction with the A270 Brighton East.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 17 December 2024 to 19 December 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 12.68 miles from Framfield.
Location: eastbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 17 December 2024 to 19 December 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 12.18 miles from Framfield.
Location: eastbound between the junctions with the A23 and the A270 Brighton East.
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 6 December 2024 to 06:00 on 7 December 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 9 December 2024 to 13 December 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 12.31 miles from Framfield.
Location: southbound at the junction with the A27 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 13 January 2025 to 16 January 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 13.85 miles from Framfield.
Location: southbound between the junctions with the A273 and the A27 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 13 January 2025 to 16 January 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 13.89 miles from Framfield.
Location: eastbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 25 November 2024 to 29 November 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 12.68 miles from Framfield.
Location: southbound exit slip to the A26 .
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 10:00 on 29 November 2024 to 13:00 on 29 November 2024.
Schedule : From 10:00 on 6 December 2024 to 13:00 on 6 December 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 17.16 miles from Framfield.
Location: southbound between the A225 and the junction with the A26 Tonbridge East.
Lane Closures : Lane one will be closed.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 10:00 on 29 November 2024 to 13:00 on 29 November 2024.
Schedule : From 10:00 on 6 December 2024 to 13:00 on 6 December 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 17.29 miles from Framfield.
Location: eastbound between the junctions with the A270 Brighton West and the A293 .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 25 November 2024 to 30 November 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 2 December 2024 to 7 December 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 9 December 2024 to 14 December 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 16 December 2024 to 20 December 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 18.51 miles from Framfield.
Location: eastbound between the junctions with the A293 and the A2038 .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 25 November 2024 to 30 November 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 2 December 2024 to 7 December 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 9 December 2024 to 14 December 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 16 December 2024 to 20 December 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 16.06 miles from Framfield.
Location: westbound between the junctions with the A26 North and the A277 .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 25 November 2024 to 30 November 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 2 December 2024 to 7 December 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 9 December 2024 to 14 December 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 16 December 2024 to 20 December 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 8.22 miles from Framfield.
Location: westbound.
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 2 December 2024 to 06:00 on 16 January 2025.
Nearest town: 11.07 miles from Framfield.
Location: southbound between the A273 and the junction with the A27 .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 13 January 2025 to 06:00 on 16 January 2025.
Nearest town: 13.89 miles from Framfield.
Location: eastbound between the A23 and the junction with the A270 Brighton East.
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 29 November 2024 to 06:00 on 30 November 2024.
Nearest town: 13.85 miles from Framfield.
Location: eastbound entry slip from the A23 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 29 November 2024 to 06:00 on 30 November 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 13.6 miles from Framfield.
Location: eastbound between the A23 and the junction with the A270 Brighton East.
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 29 November 2024 to 06:00 on 30 November 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 13.85 miles from Framfield.
Location: northbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 25 November 2024 to 30 November 2024.
Schedule : From 20:00 on 2 December 2024 to 06:00 on 3 December 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 15.05 miles from Framfield.
Location: northbound entry slip from the A272 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 25 November 2024 to 30 November 2024.
Schedule : From 20:00 on 2 December 2024 to 06:00 on 3 December 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 14.74 miles from Framfield.
Location: northbound between the A26 and the junction with the A225 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 2 December 2024 to 7 December 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 9 December 2024 to 14 December 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 16 December 2024 to 20 December 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 16.98 miles from Framfield.
Location: northbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 4 December 2024 to 9 December 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 16.06 miles from Framfield.
Location: northbound between the A26 and the junction with the A25 West.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 4 December 2024 to 9 December 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 17.27 miles from Framfield.
Location: northbound between the A228 and the junction with the A26 Tonbridge East.
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 4 December 2024 to 06:00 on 9 December 2024.
Nearest town: 15.83 miles from Framfield.
Location: northbound between the A228 and the junction with the A26 Tonbridge East.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 4 December 2024 to 9 December 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 15.83 miles from Framfield.
Location: northbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 4 December 2024 to 9 December 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 16.91 miles from Framfield.
Location: northbound entry slip from the A26 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 4 December 2024 to 9 December 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 16.84 miles from Framfield.
Location: northbound between the A26 Tonbridge East and the junction with the A25 West.
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 2 December 2024 to 06:00 on 19 December 2024.
Nearest town: 15.82 miles from Framfield.