Location: westbound between junctions J5 (Colnbrook) and J6 (Slough) .
Lane Closures : The hard shoulder and lane 1 are closed.
Due to: Broken down vehicle.
Time To Clear : The event is expected to clear between 10:45 and 11:00 on 22 December 2024.
Normal traffic conditions are expected between 10:45 and 11:00 on 22 December 2024.
Lanes Closed : There is one of four lanes closed.
Nearest town: 8.03 miles from Forty Green.
Cross Deep (All Directions) junction with Grotto Road.
All closures have been removed - Traffic flows have returned to normal in the area
Nearest town: 18.56 miles from Forty Green.
Swakeleys Roundabout - There is a broken down car on the eastbound on slip road to the A40.
All lanes are open.
Nearest town: 9.43 miles from Forty Green.
Horn Lane (All Directions) at the junction of Rectory Road - Three-way temporary signals in operation to facilitate works by BT.
Traffic is flowing well in the area.
Nearest town: 18.55 miles from Forty Green.
Edgware Road West Hendon Broadway junction with Cool Oak Lane (All Directions).
There is a reported collision at this location.
All lanes are open.
Nearest town: 18.8 miles from Forty Green.
The Parkway (Northbound) at the junction of North Hyde Road - Road is now fully open.
Traffic is moving well.
Nearest town: 13.68 miles from Forty Green.
Western Avenue (Eastbound) near the junction of Victoria Road lane one blocked by a broken down van.
Vehicle has been recovered.
Traffis is flowing well.
Nearest town: 18.64 miles from Forty Green.
Western Avenue (Eastbound) near the junction with Alperton Lane - Collision - Lane one reopened.
Traffic is flowing well for the time of day.
Nearest town: 16.51 miles from Forty Green.
Lampton Road (Both Directions) at the junction of Alexandra Road - Temporary Traffic Signals to facilitate junction improvements works Traffic is flowing well.
Nearest town: 16.21 miles from Forty Green.
All lanes reopened.
Traffic is moving well.
Nearest town: 16.36 miles from Forty Green.
Watling Avenue (All Directions) at the junction of Orange Hill Road .
Traffic signals have been restored.
Traffic signals have been restored.
Nearest town: 17.62 miles from Forty Green.
Forty Avenue (All Directions) at the junction of Preston Road.
Lane restrictions in place due to a collision.
The road has reopened.
Nearest town: 16.67 miles from Forty Green.
High Street Harlesden (All Directions) at the junction of Wendover Road - Faulty traffic signals The traffic signals have been repaired.
Nearest town: 18.98 miles from Forty Green.
Heston Road (All Directions) at the junction of Wheatlands - Temporary signals in operation to facilitate resurfacing works.
Expect some delays while the restrictions are in place.
Nearest town: 15.47 miles from Forty Green.
Kymberley Road (One Way System) between Headstone Road and College Road - Road closure to facilitate resurfacing works
Nearest town: 14.5 miles from Forty Green.
Gunnersbury Avenue (North Circular Road) (Southbound) at the junction of Power Road - Collision vehicles have now been cleared.
Traffic flowing well in the area.
Nearest town: 18.63 miles from Forty Green.
Location: eastbound between the junctions with the M25 and the A308 .
Due to: Congestion.
Normal traffic conditions are expected between 11:15 and 11:30 on 22 December 2024.
Nearest town: 14.07 miles from Forty Green.
Location: The A308M westbound between the junctions with the A308 and the M4 .
Due to: Congestion.
Normal traffic conditions are expected between 11:00 and 11:15 on 22 December 2024.
Nearest town: 7.67 miles from Forty Green.
Location: clockwise exit slip at junction J22 (St Albans) .
Due to: Congestion.
Normal traffic conditions are expected between 11:45 and 12:00 on 22 December 2024.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 18.32 miles from Forty Green.
Location: northbound at junction J5 (Harrow A41) .
Due to: Congestion.
Normal traffic conditions are expected between 08:45 and 09:00 on 22 December 2024.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 13.68 miles from Forty Green.
Location: southbound between junctions J4 and J4A .
Due to: Congestion.
Normal traffic conditions are expected between 08:30 and 08:45 on 22 December 2024.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 12.37 miles from Forty Green.
Location: slip road to the M40 southbound from M25 north.
Due to: Congestion.
Normal traffic conditions are expected between 06:15 and 06:30 on 22 December 2024.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 6.71 miles from Forty Green.
Location: southbound between junctions J8A (Thame) and J8 (Oxford) .
Lane Closures : The hard shoulder is closed.
Due to: Barrier repairs.
Period : expect disruption until 23:00 on 31 January 2025.
Nearest town: 19.72 miles from Forty Green.
Location: westbound between junctions J3 (Woking) and J4 (Guildford) .
Due to: Roadworks scheme.
Period : from 21:04 on 4 November 2024 to 06:00 on 5 July 2025.
Nearest town: 17.66 miles from Forty Green.
Location: westbound between junctions J3 (Woking) and J4 (Guildford) .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 5 July 2025.
Lanes Closed : There is one of four lanes closed.
Nearest town: 17.78 miles from Forty Green.
Location: westbound at junction J3 (Woking) .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 5 July 2025.
Lanes Closed : There is one of three lanes closed.
Nearest town: 17.66 miles from Forty Green.
Location: westbound between junctions J10 (Reading) and J12 (Reading) .
Due to: Roadworks scheme.
Period : from 20:01 on 19 December 2024 to 06:00 on 23 January 2025.
Nearest town: 16.87 miles from Forty Green.
Location: eastbound at junction J10 (Reading) .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 31 March 2025.
Lanes Closed : There is one of three lanes closed.
Nearest town: 15.06 miles from Forty Green.
Location: westbound between junctions J11 (Basingstoke) and J12 (Reading) .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 31 March 2025.
Lanes Closed : There is one of four lanes closed.
Nearest town: 18.9 miles from Forty Green.
Location: westbound between junctions J10 (Reading) and J11 (Basingstoke) .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 31 March 2025.
Lanes Closed : There is one of four lanes closed.
Nearest town: 15.14 miles from Forty Green.
Location: eastbound between junctions J11 (Basingstoke) and J10 (Reading) .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 31 March 2025.
Lanes Closed : There is one of four lanes closed.
Nearest town: 18.45 miles from Forty Green.
Location: eastbound at junction J11 (Basingstoke) .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 31 March 2025.
Lanes Closed : There is one of three lanes closed.
Nearest town: 18.84 miles from Forty Green.
Location: westbound at junction J11 (Basingstoke) .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 31 March 2025.
Lanes Closed : There is one of three lanes closed.
Nearest town: 18.64 miles from Forty Green.
Location: eastbound between junctions J13 (Newbury) and J10 (Reading) .
Due to: Roadworks scheme.
Period : from 22:00 on 18 December 2024 to 06:00 on 29 January 2025.
Nearest town: 19.4 miles from Forty Green.
Location: clockwise at junction J23 (Hatfield) .
Lane Closures : The hard shoulder and lane 1 are closed.
Due to: Road repairs.
Period : expect disruption until 05:00 on 31 March 2025.
Lanes Closed : There is one of three lanes closed.
Nearest town: 19.62 miles from Forty Green.
Location: westbound between junctions J10 (Reading) and J12 (Reading) .
Due to: Roadworks scheme.
Period : from 23:01 on 15 May 2024 to 06:00 on 31 March 2025.
Nearest town: 14.9 miles from Forty Green.
Location: anticlockwise exit slip at junction J23 (Hatfield) .
Lane Closures : Lane one is closed.
Due to: Road repairs.
Period : expect disruption until 05:00 on 31 March 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 19.96 miles from Forty Green.
Location: anticlockwise at junction J23 (Hatfield) .
Lane Closures : The hard shoulder and lane 1 are closed.
Due to: Road repairs.
Period : expect disruption until 05:00 on 31 March 2025.
Lanes Closed : There is one of three lanes closed.
Nearest town: 19.96 miles from Forty Green.
Location: clockwise entry slip at junction J23 (Hatfield) .
Lane Closures : The hard shoulder and lane 1 are closed.
Due to: Road repairs.
Period : expect disruption until 05:00 on 31 March 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 19.82 miles from Forty Green.
Location: northbound between junctions J8 (Hemel Hstead) and J14 (Milton Keynes) .
Due to: Roadworks scheme.
Period : from 22:00 on 5 December 2024 to 05:00 on 30 September 2025.
Nearest town: 19.78 miles from Forty Green.
Location: westbound between junctions J2 (Gatwick M23) and J3 (Woking) .
Lane Closures : Lane one is closed.
Due to: Road repairs.
Period : expect disruption until 06:00 on 31 January 2025.
Lanes Closed : There is one of four lanes closed.
Nearest town: 15.63 miles from Forty Green.
Location: westbound between junctions J2 (Gatwick M23) and J4A (Farnborough) .
Due to: Roadworks scheme.
Period : from 23:00 on 29 April 2024 to 23:59 on 31 March 2025.
Nearest town: 15.99 miles from Forty Green.
Location: westbound between junctions J3 (Woking) and J4 (Guildford) .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 31 March 2025.
Lanes Closed : There is one of four lanes closed.
Nearest town: 17.78 miles from Forty Green.
Location: westbound at junction J3 (Woking) .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 31 March 2025.
Lanes Closed : There is one of three lanes closed.
Nearest town: 17.41 miles from Forty Green.
Location: westbound between junctions J2 (Gatwick M23) and J3 (Woking) .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 31 March 2025.
Lanes Closed : There is one of four lanes closed.
Nearest town: 15.99 miles from Forty Green.
Location: southbound between junctions J4 (High Wycombe) and J3 (Loudwater) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 22:15 on 23 December 2024 to 06:00 on 24 December 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 3.16 miles from Forty Green.
Location: northbound between junctions J2 (Beaconsfield) and J4 (High Wycombe) .
Lane Closures : Lane four will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 22:15 on 23 December 2024 to 06:00 on 24 December 2024.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 0.8 miles from Forty Green.
Location: westbound between junctions J11 (Basingstoke) and J12 (Reading) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 22 January 2025 to 06:00 on 23 January 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 18.9 miles from Forty Green.
Location: westbound entry slip at junction J10 (Reading) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 6 January 2025 to 9 January 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 14.63 miles from Forty Green.
Location: westbound at junction J10 (Reading) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 6 January 2025 to 9 January 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 9 January 2025 to 11 January 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 14.66 miles from Forty Green.
Location: westbound at junction J11 (Basingstoke) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 22 January 2025 to 06:00 on 23 January 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.64 miles from Forty Green.
Location: westbound between junctions J10 (Reading) and J11 (Basingstoke) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 22 January 2025 to 06:00 on 23 January 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 17.9 miles from Forty Green.
Location: westbound between junctions J10 (Reading) and J11 (Basingstoke) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 6 January 2025 to 9 January 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 9 January 2025 to 11 January 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 15.14 miles from Forty Green.
Location: westbound between junctions J2 (Gatwick M23) and J3 (Woking) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 7 January 2025 to 9 January 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 16.62 miles from Forty Green.
Location: westbound between junctions J2 (Gatwick M23) and J3 (Woking) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 27 January 2025 to 06:00 on 28 January 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 16.62 miles from Forty Green.
Location: southbound between junctions J10 (Luton Airport) and J8 (Hemel Hstead) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 10 February 2025 to 16 February 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.93 miles from Forty Green.
Location: southbound exit slip at junction J9 (Dunstable A5) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 10 February 2025 to 16 February 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.34 miles from Forty Green.
Location: westbound between junctions J10 (Reading) and J11 (Basingstoke) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 19 December 2024 to 06:00 on 20 December 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 9 January 2025 to 11 January 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 15.14 miles from Forty Green.
Location: eastbound between junctions J11 (Basingstoke) and J10 (Reading) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 20 January 2025 to 06:00 on 21 January 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 18.45 miles from Forty Green.
Location: eastbound at junction J11 (Basingstoke) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 20 January 2025 to 06:00 on 21 January 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.84 miles from Forty Green.
Location: eastbound between junctions J12 (Reading) and J11 (Basingstoke) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 20 January 2025 to 06:00 on 21 January 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 19.2 miles from Forty Green.
Location: eastbound between junctions J11 (Basingstoke) and J10 (Reading) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 24 January 2025 to 06:00 on 25 January 2025.
Schedule : From 20:00 on 28 January 2025 to 06:00 on 29 January 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 17.61 miles from Forty Green.
Location: eastbound at junction J11 (Basingstoke) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 13 January 2025 to 06:00 on 14 January 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 18.84 miles from Forty Green.
Location: eastbound between junctions J12 (Reading) and J11 (Basingstoke) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 13 January 2025 to 06:00 on 14 January 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 19.39 miles from Forty Green.
Location: eastbound between junctions J3 (Woking) and J2 (Gatwick M23) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 6 January 2025 to 06:00 on 7 January 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 17.33 miles from Forty Green.
Location: northbound between junctions J8 (Hemel Hstead) and J9 (Dunstable A5) .
Lane Closures : Lanes 1, 2, 3 and 4 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 27 January 2025 to 1 February 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 17.91 miles from Forty Green.
Location: northbound between junctions J8 (Hemel Hstead) and J9 (Dunstable A5) .
Lane Closures : Lanes 2, 3 and 4 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 27 January 2025 to 1 February 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 17.42 miles from Forty Green.
Location: northbound between junctions J9 (Dunstable A5) and J10 (Luton Airport) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 27 January 2025 to 1 February 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.12 miles from Forty Green.
Location: northbound exit slip at junction J10 (Luton Airport) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 27 January 2025 to 1 February 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.78 miles from Forty Green.
Location: northbound at junction J10 (Luton Airport) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 29 September 2025 to 05:00 on 30 September 2025.
Nearest town: 19.78 miles from Forty Green.
Location: northbound at junction J10 (Luton Airport) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 05:00 on 1 February 2025 to 22:00 on 29 September 2025.
Nearest town: 19.83 miles from Forty Green.
Location: northbound between junctions J10 (Luton Airport) and J12 (Flitwick) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 27 January 2025 to 1 February 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.9 miles from Forty Green.
Location: westbound at junction J3 (Woking) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 8 January 2025 to 06:00 on 14 March 2025.
Nearest town: 17.41 miles from Forty Green.
Location: westbound at junction J3 (Woking) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 8 January 2025 to 11 January 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 13 January 2025 to 18 January 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 20 January 2025 to 25 January 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 27 January 2025 to 1 February 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 17.41 miles from Forty Green.
Location: eastbound at junction J3 (Woking) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 8 January 2025 to 06:00 on 14 March 2025.
Nearest town: 17.74 miles from Forty Green.
Location: eastbound at junction J3 (Woking) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 8 January 2025 to 11 January 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 13 January 2025 to 18 January 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 20 January 2025 to 25 January 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 27 January 2025 to 1 February 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 17.74 miles from Forty Green.
Location: westbound exit slip at junction J3 (Woking) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 8 January 2025 to 11 January 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 13 January 2025 to 18 January 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 20 January 2025 to 25 January 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 27 January 2025 to 1 February 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 17.42 miles from Forty Green.
Location: eastbound exit slip at junction J3 (Woking) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 8 January 2025 to 11 January 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 13 January 2025 to 18 January 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 20 January 2025 to 25 January 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 27 January 2025 to 1 February 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 17.74 miles from Forty Green.
Location: westbound between junctions J2 (Gatwick M23) and J4A (Farnborough) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 7 January 2025 to 06:00 on 29 January 2025.
Nearest town: 16.43 miles from Forty Green.