Location: southbound at junction J3 .
Due to: Congestion.
Normal traffic conditions are expected between 19:15 and 19:30 on 21 November 2024.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 8.82 miles from Clays End.
Location: southbound at junction J3 .
Due to: Congestion.
Normal traffic conditions are expected between 18:45 and 19:00 on 21 November 2024.
Nearest town: 8.82 miles from Clays End.
Location: southbound at junction J3 .
Due to: Congestion.
Normal traffic conditions are expected between 18:15 and 18:30 on 21 November 2024.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 8.82 miles from Clays End.
Location: westbound exit slip at junction J19 (Bristol) .
Due to: Congestion.
Normal traffic conditions are expected between 18:00 and 18:15 on 21 November 2024.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 10.13 miles from Clays End.
Location: southbound entry slip at junction J1 (Filton) .
Due to: Congestion.
Normal traffic conditions are expected between 17:45 and 18:00 on 21 November 2024.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 9.82 miles from Clays End.
Location: southbound between the junctions with the M4 and the M5 .
Lane Closures : Lane two is closed.
Due to: Barrier repairs.
Period : expect disruption until 06:00 on 22 November 2024.
Lanes Closed : There is one of two lanes closed.
Nearest town: 14.22 miles from Clays End.
Location: northbound between the junctions with the A361 North and the A366 .
Due to: Emergency roadworks.
Period : expect disruption until 16:00 on 31 January 2025.
Nearest town: 8.84 miles from Clays End.
Location: southbound between the junctions with the A366 and the A361 North.
Due to: Emergency roadworks.
Period : expect disruption until 16:00 on 31 January 2025.
Nearest town: 8.72 miles from Clays End.
Location: eastbound between junctions J17 (Chippenham) and J16 (Swindon) .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 22 November 2024.
Lanes Closed : There is one of three lanes closed.
Nearest town: 16.49 miles from Clays End.
Location: eastbound entry slip at junction J17 (Chippenham) .
Due to: Roadworks.
Period : expect disruption until 06:00 on 22 November 2024.
Lanes Closed : All lanes are closed.
Nearest town: 16.6 miles from Clays End.
Location: westbound between junctions J18 (Bath) and J19 (Bristol) .
Lane Closures : The hard shoulder and lane 1 are closed.
Due to: Planned Roadworks.
Period : expect disruption until 06:00 on 22 November 2024.
Lanes Closed : There is one of three lanes closed.
Nearest town: 8.8 miles from Clays End.
Location: southbound between the junctions with the M4 and the A420 .
Due to: Roadworks.
Period : expect disruption until 06:00 on 22 November 2024.
Nearest town: 7.58 miles from Clays End.
Location: northbound between the junctions with the A420 and the M4 .
Due to: Roadworks.
Period : expect disruption until 06:00 on 22 November 2024.
Nearest town: 7.48 miles from Clays End.
Location: northbound exit slip at junction J19 (Portishead) .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 22 November 2024.
Lanes Closed : There is one of two lanes closed.
Nearest town: 14.16 miles from Clays End.
Location: northbound at junction J18A (South Wales) .
Lane Closures : Lane one is closed.
Due to: Planned Roadworks.
Period : expect disruption until 06:00 on 22 November 2024.
Lanes Closed : There is one of three lanes closed.
Nearest town: 13.65 miles from Clays End.
Location: northbound between junctions J19 (Portishead) and J18 (Bristol) .
Lane Closures : Lane one is closed.
Due to: Planned Roadworks.
Period : expect disruption until 06:00 on 22 November 2024.
Lanes Closed : There is one of four lanes closed.
Nearest town: 13.75 miles from Clays End.
Location: westbound between junctions J20 (Bristol) and J21 (Chepstow) .
Lane Closures : Lane two is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 22 November 2024.
Lanes Closed : There is one of two lanes closed.
Nearest town: 14.35 miles from Clays End.
Location: northbound between the A366 and the junction with the A4 .
Due to: Roadworks scheme.
Period : from 11:30 on 12 November 2024 to 18:00 on 1 March 2025.
Nearest town: 5.44 miles from Clays End.
Location: northbound between the junctions with the A366 and the A4 .
Due to: Roadworks.
Period : expect disruption until 18:00 on 1 March 2025.
Nearest town: 5.44 miles from Clays End.
Location: southbound between the A4 and the junction with the A366 .
Due to: Roadworks scheme.
Period : from 11:30 on 12 November 2024 to 18:00 on 1 March 2025.
Nearest town: 5.16 miles from Clays End.
Location: southbound between the junctions with the A4 and the A366 .
Due to: Roadworks.
Period : expect disruption until 18:00 on 1 March 2025.
Nearest town: 5.42 miles from Clays End.
Location: northbound between the A366 and the junction with the A4 .
Due to: Roadworks.
Period : from 22:25 on 10 November 2024 to 06:00 on 1 March 2025.
Lanes Closed : All lanes are closed.
Nearest town: 6.99 miles from Clays End.
Location: southbound between the A4 and the junction with the A366 .
Due to: Roadworks.
Period : from 22:19 on 10 November 2024 to 06:00 on 1 March 2025.
Lanes Closed : All lanes are closed.
Nearest town: 4.13 miles from Clays End.
Location: westbound between junctions J17 (Chippenham) and J18 (Bath) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 20:00 on 9 December 2024.
Nearest town: 15.2 miles from Clays End.
Location: westbound.
Due to: Roadworks scheme.
Period : from 20:12 on 14 November 2024 to 06:00 on 10 December 2024.
Nearest town: 15.19 miles from Clays End.
Location: westbound at junction J22 (Avonmouth) .
Due to: Roadworks.
Period : expect disruption until 06:00 on 2 December 2024.
Lanes Closed : There are lane closures.
Nearest town: 16.58 miles from Clays End.
Location: northbound between the junctions with the A366 and the A4 .
Due to: Roadworks.
Period : expect disruption until 06:00 on 1 March 2025.
Lanes Closed : All lanes are closed.
Nearest town: 5.28 miles from Clays End.
Location: northbound between the A366 and the junction with the A4 .
Due to: Roadworks.
Period : expect disruption until 06:00 on 1 March 2025.
Nearest town: 7.05 miles from Clays End.
Location: southbound between the junctions with the A4 and the A366 .
Due to: Roadworks.
Period : expect disruption until 06:00 on 1 March 2025.
Lanes Closed : All lanes are closed.
Nearest town: 5.15 miles from Clays End.
Location: southbound between the A4 and the junction with the A366 .
Due to: Roadworks.
Period : expect disruption until 06:00 on 1 March 2025.
Nearest town: 4.42 miles from Clays End.
Location: westbound between junctions J18 (Bath) and J19 (Bristol) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 31 May 2025.
Nearest town: 9.36 miles from Clays End.
Location: eastbound between junctions J19 (Bristol) and J18 (Bath) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 31 May 2025.
Nearest town: 9.49 miles from Clays End.
Location: northbound between the junctions with the A361 South and the A361 North.
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 1 March 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 10.16 miles from Clays End.
Location: northbound between the A366 and the junction with the A4 .
Due to: Roadworks scheme.
Period : from 20:00 on 11 November 2024 to 06:00 on 1 March 2025.
Nearest town: 7.05 miles from Clays End.
Location: southbound between the A4 and the junction with the A366 .
Due to: Roadworks scheme.
Period : from 20:00 on 11 November 2024 to 06:00 on 1 March 2025.
Nearest town: 4.42 miles from Clays End.
Location: westbound between the M4 and junction J1 (Avonmouth) .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 08:00 and 16:00 from 25 November 2024 to 27 November 2024.
Nearest town: 15.21 miles from Clays End.
Location: northbound between junctions J2 (Stapleton) and J1 (Filton) .
Lane Closures : Lane two will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 20:00 on 22 November 2024 to 06:00 on 23 November 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 9.46 miles from Clays End.
Location: eastbound between junctions J20 (Bristol) and J19 (Bristol) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 06:00 from 27 November 2024 to 29 November 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 13.56 miles from Clays End.
Location: eastbound entry slip at junction J20 (Bristol) from M5 north.
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 06:00 from 27 November 2024 to 29 November 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 13.35 miles from Clays End.
Location: eastbound between junctions J22 (Avonmouth) and J20 (Bristol) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 06:00 from 27 November 2024 to 29 November 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 14.07 miles from Clays End.
Location: southbound exit slip at junction J15 (Almondsbury) .
Lane Closures : Lane one will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 06:00 from 27 November 2024 to 29 November 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 13.27 miles from Clays End.
Location: southbound between junctions J14 (Dursley) and J15 (Almondsbury) .
Lane Closures : Lane one will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 06:00 from 27 November 2024 to 29 November 2024.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 13.33 miles from Clays End.
Location: eastbound entry slip at junction J20 (Bristol) from M5 south.
Lane Closures : Lane one will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 06:00 from 27 November 2024 to 29 November 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 13.22 miles from Clays End.
Location: southbound between junctions J17 (Bristol West) and J18 (Bristol) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 27 November 2024 to 06:00 on 28 November 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 13.47 miles from Clays End.
Location: The junction of the M5 J18 (Bristol) and the M49 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 27 November 2024 to 06:00 on 28 November 2024.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 13.47 miles from Clays End.
Location: southbound exit slip at junction J18 (Bristol) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 27 November 2024 to 06:00 on 28 November 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 13.53 miles from Clays End.
Location: westbound between junctions J20 (Bristol) and J22 (Avonmouth) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 21:00 on 23 November 2024 to 06:00 on 25 November 2024.
Nearest town: 14.35 miles from Clays End.
Location: southbound between the junctions with the A361 North and the A361 South.
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 26 November 2024 to 28 November 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 9.61 miles from Clays End.
Location: northbound between the junctions with the A350 South and the A362 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 26 November 2024 to 06:00 on 27 November 2024.
Nearest town: 16.41 miles from Clays End.
Location: southbound between the junctions with the A362 and the A350 South.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 26 November 2024 to 06:00 on 27 November 2024.
Nearest town: 16.27 miles from Clays End.
Location: northbound between the junctions with the A303 and the A350 South.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 26 November 2024 to 06:00 on 27 November 2024.
Nearest town: 16.5 miles from Clays End.
Location: southbound between the junctions with the A350 South and the A303 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 26 November 2024 to 06:00 on 27 November 2024.
Nearest town: 16.41 miles from Clays End.
Location: northbound entry slip from the M5 Avonmouth.
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 25 November 2024 to 27 November 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 13.66 miles from Clays End.
Location: northbound entry slip at junction J18 (Bristol) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 25 November 2024 to 27 November 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 13.78 miles from Clays End.
Location: westbound.
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 25 November 2024 to 27 November 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 13.96 miles from Clays End.
Location: northbound at junction J18A (South Wales) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 25 November 2024 to 27 November 2024.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 13.58 miles from Clays End.
Location: eastbound between junctions J23 (Chepstow) and J22 (Avonmouth) .
Due to: Roadworks.
Period : expect disruption until 06:00 on 22 November 2024.
Lanes Closed : All lanes are closed.
Nearest town: 19.64 miles from Clays End.
Location: westbound between junctions J18 (Bath) and J19 (Bristol) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 06:00 from 25 November 2024 to 27 November 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 9.17 miles from Clays End.
Location: northbound between junctions J2 (Stapleton) and J1 (Filton) .
Lane Closures : Lane one will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 06:00 from 25 November 2024 to 27 November 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 9.45 miles from Clays End.
Location: northbound between junction J1 (Filton) and the M4 .
Lane Closures : Lane one will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 06:00 from 25 November 2024 to 27 November 2024.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 10.22 miles from Clays End.
Location: westbound between junctions J17 (Chippenham) and J18 (Bath) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 22 November 2024 to 09:00 on 23 November 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 12.16 miles from Clays End.
Location: westbound between junctions J17 (Chippenham) and J18 (Bath) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 23 November 2024 to 09:00 on 24 November 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 12.5 miles from Clays End.
Location: westbound between junctions J20 (Bristol) and J21 (Chepstow) .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 23 November 2024 to 25 November 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 14.35 miles from Clays End.
Location: westbound entry slip at junction J22 (Avonmouth) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 23 November 2024 to 25 November 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 16.62 miles from Clays End.
Location: northbound between junctions J19 (Portishead) and J18 (Bristol) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 23 November 2024 to 25 November 2024.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 13.81 miles from Clays End.
Location: northbound at junction J19 (Portishead) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 23 November 2024 to 25 November 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 14.02 miles from Clays End.
Location: southbound exit slip at junction J14 (Dursley) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 22 November 2024 to 06:00 on 23 November 2024.
Nearest town: 18.28 miles from Clays End.
Location: northbound exit slip at junction J14 (Dursley) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 22 November 2024 to 06:00 on 23 November 2024.
Nearest town: 18.16 miles from Clays End.
Location: westbound.
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 22 November 2024 to 06:00 on 23 November 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 13.96 miles from Clays End.
Location: eastbound.
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 22 November 2024 to 06:00 on 23 November 2024.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 14 miles from Clays End.
Location: southbound at junction J18 (Bristol) .
Lane Closures : The hard shoulder, lanes 1 and 2 are closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 22 November 2024.
Lanes Closed : There are two of three lanes closed.
Nearest town: 13.61 miles from Clays End.
Location: southbound at junction J19 (Portishead) .
Lane Closures : The hard shoulder, lanes 1 and 2 are closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 22 November 2024.
Lanes Closed : There are two of three lanes closed.
Nearest town: 13.86 miles from Clays End.
Location: southbound between junctions J18 (Bristol) and J19 (Portishead) .
Lane Closures : The hard shoulder, lanes 1 and 2 are closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 22 November 2024.
Lanes Closed : There are two of four lanes closed.
Nearest town: 13.67 miles from Clays End.
Location: westbound entry slip at junction J22 (Avonmouth) .
Due to: Roadworks.
Period : expect disruption until 06:00 on 22 November 2024.
Lanes Closed : All lanes are closed.
Nearest town: 16.62 miles from Clays End.
Location: southbound at junction J20 (Nailsea) .
Lane Closures : Lane three is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 22 November 2024.
Lanes Closed : There is one of three lanes closed.
Nearest town: 17.95 miles from Clays End.
Location: southbound at junction J14 (Dursley) .
Lane Closures : Lane three is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 22 November 2024.
Lanes Closed : There is one of three lanes closed.
Nearest town: 18.16 miles from Clays End.
Location: westbound between junctions J17 (Chippenham) and J18 (Bath) .
Lane Closures : The hard shoulder, lanes 1 and 2 are closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 22 November 2024.
Lanes Closed : There are two of three lanes closed.
Nearest town: 14.65 miles from Clays End.
Location: westbound between junctions J17 (Chippenham) and J18 (Bath) .
Lane Closures : The hard shoulder, lanes 1 and 2 are closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 22 November 2024.
Lanes Closed : There are two of three lanes closed.
Nearest town: 15.65 miles from Clays End.
Location: westbound entry slip at Leigh Delamere Services.
Due to: Roadworks.
Period : expect disruption until 06:00 on 22 November 2024.
Lanes Closed : All lanes are closed.
Nearest town: 15.19 miles from Clays End.
Location: westbound between junctions J17 (Chippenham) and J18 (Bath) .
Lane Closures : Lane three is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 22 November 2024.
Lanes Closed : There is one of three lanes closed.
Nearest town: 11.35 miles from Clays End.
Location: eastbound between junctions J18 (Bath) and J17 (Chippenham) .
Lane Closures : Lane three is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 22 November 2024.
Lanes Closed : There is one of three lanes closed.
Nearest town: 11.09 miles from Clays End.
Location: northbound between the M5 and the junction with the M4 .
Lane Closures : Lane two is closed.
Due to: Roadside Drains Works.
Period : expect disruption until 06:00 on 22 November 2024.
Lanes Closed : There is one of two lanes closed.
Nearest town: 13.76 miles from Clays End.
Location: northbound at junction J20 (Nailsea) .
Lane Closures : The hard shoulder and lane 1 are closed.
Due to: Emergency Roadside Drains works.
Period : expect disruption until 05:00 on 22 November 2024.
Lanes Closed : There is one of three lanes closed.
Nearest town: 17.96 miles from Clays End.