Location: southbound between junctions J11 (Burton upon Trent) and J10 (Tamworth) .
Lane Closures : The hard shoulder and lane 1 are closed.
Due to: Emergency gantry construction.
Period : expect disruption until 06:00 on 18 December 2024.
Lanes Closed : There is one of two lanes closed.
Nearest town: 19.69 miles from Cheslyn Hay.
Location: southbound exit slip at junction J10 (Tamworth) .
Due to: Congestion.
Normal traffic conditions are expected between 01:15 and 01:30 on 18 December 2024.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 17.48 miles from Cheslyn Hay.
Location: northbound entry slip at junction J6 (Birmingham) from A38(M) northbound.
Due to: Roadworks.
Period : from 21:30 on 17 December 2024 to 06:00 on 18 December 2024.
Lanes Closed : All lanes are closed.
Nearest town: 12.76 miles from Cheslyn Hay.
Location: southbound entry slip at junction J6 (Birmingham) .
Due to: Roadworks.
Period : from 21:33 on 17 December 2024 to 06:00 on 18 December 2024.
Lanes Closed : All lanes are closed.
Nearest town: 12.78 miles from Cheslyn Hay.
Location: slip road to the M6 northbound .
Due to: Roadworks.
Period : from 21:20 on 17 December 2024 to 05:00 on 18 December 2024.
Lanes Closed : All lanes are closed.
Nearest town: 8.52 miles from Cheslyn Hay.
Location: northbound between junctions J3 (Kidderminster) and J2 (Dudley) .
Lane Closures : Lanes 2 and 3 are closed.
Due to: Barrier repairs.
Period : expect disruption until 06:00 on 18 December 2024.
Lanes Closed : There are two of three lanes closed.
Nearest town: 14.67 miles from Cheslyn Hay.
Location: northbound between junctions J10 (Walsall) and J11 (Cannock) .
Lane Closures : Lane three will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 18 December 2024 to 06:00 on 19 December 2024.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 3.54 miles from Cheslyn Hay.
Location: southbound entry slip at junction J6 (Birmingham) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 18 December 2024 to 06:00 on 19 December 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 12.78 miles from Cheslyn Hay.
Location: southbound exit slip to the A5127 .
Lane Closures : Lane one is closed.
Due to: Bridge repairs.
Period : expect disruption until 05:00 on 31 January 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 11.13 miles from Cheslyn Hay.
Location: northbound between junctions J10 (Walsall) and J11 (Cannock) .
Lane Closures : The hard shoulder is closed.
Due to: Emergency Roadside Equipment Maintenance.
Period : expect disruption until 06:00 on 18 December 2024.
Nearest town: 3.54 miles from Cheslyn Hay.
Location: westbound between junctions J5 (Telford) and J6 (Telford W) .
Lane Closures : Lane two is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 18 December 2024.
Lanes Closed : There is one of three lanes closed.
Nearest town: 17.18 miles from Cheslyn Hay.
Location: westbound between junctions J4 (Telford E) and J5 (Telford) .
Lane Closures : Lane two is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 18 December 2024.
Lanes Closed : There is one of two lanes closed.
Nearest town: 16.31 miles from Cheslyn Hay.
Location: eastbound between junctions J6 (Telford W) and J5 (Telford) .
Due to: Roadworks.
Period : expect disruption until 06:00 on 18 December 2024.
Lanes Closed : All lanes are closed.
Nearest town: 18.87 miles from Cheslyn Hay.
Location: eastbound entry slip at junction J6 (Telford W) .
Due to: Roadworks.
Period : expect disruption until 06:00 on 18 December 2024.
Lanes Closed : All lanes are closed.
Nearest town: 18.61 miles from Cheslyn Hay.
Location: eastbound exit slip at junction J5 (Telford) .
Due to: Roadworks.
Period : expect disruption until 06:00 on 18 December 2024.
Lanes Closed : All lanes are closed.
Nearest town: 17.11 miles from Cheslyn Hay.
Location: southbound between junctions J4 (Bromsgrove) and J4A (Birmingham) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 18 December 2024 to 06:00 on 19 December 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 19.72 miles from Cheslyn Hay.
Location: southbound between the A5121 Burton Upon Trent South and the junction with the A513 .
Lane Closures : Lane one is closed.
Due to: Horticultural works.
Period : expect disruption until 06:00 on 18 December 2024.
Lanes Closed : There is one of two lanes closed.
Nearest town: 15.21 miles from Cheslyn Hay.
Location: northbound between the junctions with the M54 and the A5 .
Due to: Horticultural works.
Period : expect disruption until 06:00 on 18 December 2024.
Lanes Closed : All lanes are closed.
Nearest town: 3.56 miles from Cheslyn Hay.
Location: southbound between the junctions with the A5 and the M54 .
Lane Closures : Lane two is closed.
Due to: Horticultural works.
Period : expect disruption until 06:00 on 18 December 2024.
Lanes Closed : There is one of two lanes closed.
Nearest town: 3.55 miles from Cheslyn Hay.
Location: southbound between the junctions with the A5 and the M54 .
Lane Closures : Lane two is closed.
Due to: Horticultural works.
Period : expect disruption until 06:00 on 18 December 2024.
Lanes Closed : There is one of two lanes closed.
Nearest town: 3.56 miles from Cheslyn Hay.
Location: northbound between the M54 and the junction with the A5 .
Lane Closures : Lane two is closed.
Due to: Horticultural works.
Period : expect disruption until 06:00 on 18 December 2024.
Lanes Closed : There is one of two lanes closed.
Nearest town: 3.57 miles from Cheslyn Hay.
Location: northbound entry slip at junction J1 (West Bromwich) .
Due to: Horticultural works.
Period : expect disruption until 05:00 on 18 December 2024.
Lanes Closed : All lanes are closed.
Nearest town: 10.64 miles from Cheslyn Hay.
Location: eastbound between the junctions with the A522 and the A518 Uttoxeter North.
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 18 December 2024.
Lanes Closed : There is one of two lanes closed.
Nearest town: 18.49 miles from Cheslyn Hay.
Location: southbound between the junctions with the A34 and the A452 .
Due to: Roadworks.
Period : expect disruption until 06:00 on 18 December 2024.
Nearest town: 3.7 miles from Cheslyn Hay.
Location: northbound between the junctions with the A452 and the A34 .
Due to: Roadworks.
Period : expect disruption until 06:00 on 18 December 2024.
Nearest town: 3.82 miles from Cheslyn Hay.
Location: southbound at junction J9 (Lichfield) .
Due to: Emergency roadworks.
Period : expect disruption until 06:00 on 18 December 2024.
Lanes Closed : All lanes are closed.
Nearest town: 15.82 miles from Cheslyn Hay.
Location: northbound between junctions J4 (Lichfield) and J6 (Birmingham) .
Due to: Roadworks scheme.
Period : from 21:01 on 16 December 2024 to 06:00 on 20 December 2024.
Nearest town: 16.63 miles from Cheslyn Hay.
Location: northbound between junctions J4 (Bromsgrove) and J3 (Kidderminster) .
Lane Closures : The hard shoulder is closed.
Due to: Emergency barrier repairs.
Period : expect disruption until 23:00 on 31 December 2024.
Nearest town: 18.65 miles from Cheslyn Hay.
Location: northbound entry slip at junction J6 (Birmingham) .
Due to: Roadworks.
Period : expect disruption until 06:00 on 18 December 2024.
Lanes Closed : All lanes are closed.
Nearest town: 12.78 miles from Cheslyn Hay.
Location: southbound exit slip to the A5121 .
Due to: Roadworks scheme.
Period : from 09:22 on 26 November 2024 to 06:00 on 31 January 2025.
Nearest town: 18.01 miles from Cheslyn Hay.
Location: southbound entry slip at junction J6 (Birmingham) .
Due to: Roadworks.
Period : expect disruption until 06:00 on 18 December 2024.
Lanes Closed : All lanes are closed.
Nearest town: 12.79 miles from Cheslyn Hay.
Location: southbound between junctions J6 (Birmingham) and J5 (Birmingham) .
Due to: Roadworks scheme.
Period : from 21:01 on 9 December 2024 to 06:00 on 20 December 2024.
Nearest town: 12.86 miles from Cheslyn Hay.
Location: southbound entry slip at junction J6 (Birmingham) .
Due to: Roadworks scheme.
Period : from 20:00 on 15 December 2024 to 06:00 on 20 December 2024.
Nearest town: 8.78 miles from Cheslyn Hay.
Location: westbound between junctions J4 (Telford E) and J7 (Wellington) .
Due to: Roadworks scheme.
Period : from 19:42 on 12 December 2024 to 06:00 on 24 January 2025.
Nearest town: 16.98 miles from Cheslyn Hay.
Location: southbound exit slip at junction J4 (Lichfield) .
Lane Closures : Lane two is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 24 August 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 18.23 miles from Cheslyn Hay.
Location: northbound between junctions J3 (Kidderminster) and J2 (Dudley) .
Lane Closures : The hard shoulder is closed.
Due to: Emergency barrier repairs.
Period : expect disruption until 23:59 on 31 December 2024.
Nearest town: 11.97 miles from Cheslyn Hay.
Location: northbound between junctions J7 (Birmingham) and J10 (Walsall) .
Due to: Roadworks scheme.
Period : from 20:55 on 16 December 2024 to 06:00 on 28 February 2025.
Nearest town: 9.85 miles from Cheslyn Hay.
Location: southbound between junctions J6 (Birmingham) and J5 (Birmingham) .
Lane Closures : The hard shoulder is closed.
Due to: Emergency roadworks.
Period : expect disruption until 23:39 on 31 December 2024.
Nearest town: 14.21 miles from Cheslyn Hay.
Location: southbound between the junctions with the A38 and the A453 .
Lane Closures : Lane two is closed.
Due to: Road repairs.
Period : expect disruption until 05:30 on 30 April 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 10.37 miles from Cheslyn Hay.
Location: northbound between junctions J4 (Lichfield) and J6 (Birmingham) .
Lane Closures : The hard shoulder, lanes 1 and 2 are closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 18 December 2024.
Lanes Closed : There are two of three lanes closed.
Nearest town: 16.63 miles from Cheslyn Hay.
Location: southbound exit slip at Stafford Services.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 14 January 2025 to 16 January 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 15.64 miles from Cheslyn Hay.
Location: northbound between junctions J13 (Stafford) and J15 (Stoke on Trent) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 13 January 2025 to 15 January 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 10.64 miles from Cheslyn Hay.
Location: southbound entry slip at Stafford Services.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 14 January 2025 to 16 January 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 15.52 miles from Cheslyn Hay.
Location: southbound between junctions J15 (Stoke on Trent) and J14 (Stafford) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 20 January 2025 to 22 January 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 19.58 miles from Cheslyn Hay.
Location: northbound entry slip at junction J13 (Stafford) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 6 January 2025 to 8 January 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 7.59 miles from Cheslyn Hay.
Location: southbound between junctions J14 (Stafford) and J13 (Stafford) .
Lane Closures : The hard shoulder, lanes 1 and 2 are closed.
Due to: Roadside Equipment Maintenance.
Period : expect disruption until 06:00 on 18 December 2024.
Lanes Closed : There are two of four lanes closed.
Nearest town: 10.21 miles from Cheslyn Hay.
Location: northbound between junctions J12 (Telford) and J14 (Stafford) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 6 January 2025 to 11 January 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 6.47 miles from Cheslyn Hay.
Location: southbound between junctions J15 (Stoke on Trent) and J14 (Stafford) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 14 January 2025 to 16 January 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 19.59 miles from Cheslyn Hay.
Location: southbound exit slip at junction J14 (Stafford) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 13 January 2025 to 15 January 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 12.37 miles from Cheslyn Hay.
Location: northbound between junctions J14 (Stafford) and J15 (Stoke on Trent) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 21:00 on 16 January 2025 to 06:00 on 17 January 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 18.09 miles from Cheslyn Hay.
Location: southbound entry slip at junction J8 (Birmingham E) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Bridge repairs are planned.
Status : Pending.
Schedule : From 03:00 on 11 January 2025 to 05:00 on 13 January 2025.
Schedule : From 21:00 on 17 January 2025 to 05:00 on 20 January 2025.
Schedule : From 21:00 on 23 January 2025 to 05:00 on 24 January 2025.
Schedule : From 00:00 on 31 January 2025 to 00:01 on 1 February 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 16.88 miles from Cheslyn Hay.
Location: southbound exit slip at junction J8 (Birmingham E) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Bridge repairs are planned.
Status : Pending.
Schedule : From 03:00 on 11 January 2025 to 05:00 on 13 January 2025.
Schedule : From 21:00 on 16 January 2025 to 05:00 on 17 January 2025.
Schedule : From 21:00 on 17 January 2025 to 05:00 on 20 January 2025.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 23 January 2025 to 25 January 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 16.67 miles from Cheslyn Hay.
Location: northbound entry slip at junction J7 (Birmingham) .
Due to: Roadworks.
Period : expect disruption until 06:00 on 18 December 2024.
Lanes Closed : All lanes are closed.
Nearest town: 8.84 miles from Cheslyn Hay.
Location: northbound exit slip at junction J8 (Birmingham) .
Due to: Roadworks.
Period : expect disruption until 06:00 on 18 December 2024.
Lanes Closed : All lanes are closed.
Nearest town: 8.71 miles from Cheslyn Hay.
Location: northbound exit slip at junction J9 (Wednesbury) .
Due to: Roadworks.
Period : expect disruption until 06:00 on 18 December 2024.
Lanes Closed : All lanes are closed.
Nearest town: 6.87 miles from Cheslyn Hay.
Location: northbound between junctions J7 (Birmingham) and J10 (Walsall) .
Due to: Roadworks.
Period : expect disruption until 06:00 on 18 December 2024.
Lanes Closed : All lanes are closed.
Nearest town: 9.02 miles from Cheslyn Hay.
Location: northbound exit slip at junction J10 (Walsall) .
Due to: Roadworks.
Period : expect disruption until 06:00 on 18 December 2024.
Lanes Closed : All lanes are closed.
Nearest town: 5.69 miles from Cheslyn Hay.
Location: northbound entry slip at junction J9 (Wednesbury) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 17 December 2024 to 20 December 2024.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 6 January 2025 to 17 January 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 18 January 2025 to 24 January 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 25 January 2025 to 28 January 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 6.75 miles from Cheslyn Hay.
Location: southbound between junctions J11 (Cannock) and J10 (Walsall) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 6 January 2025 to 11 January 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 13 January 2025 to 17 January 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 20 January 2025 to 24 January 2025.
Schedule : From 21:00 on 27 January 2025 to 06:00 on 28 January 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 4.46 miles from Cheslyn Hay.
Location: northbound exit slip at junction J7A (M1/M6) .
Lane Closures : Lane one will be closed.
Due to: Bridge repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 3 February 2025 to 5 February 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.77 miles from Cheslyn Hay.
Location: southbound entry slip at junction J7 (M6N) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Bridge repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 10 February 2025 to 15 February 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.28 miles from Cheslyn Hay.
Location: northbound exit slip at junction J7 (M6N) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Bridge repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 3 February 2025 to 5 February 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.09 miles from Cheslyn Hay.
Location: southbound between the M6 and the junction with the A452 .
Due to: Bridge repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 20 January 2025 to 26 January 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 27 January 2025 to 2 February 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.38 miles from Cheslyn Hay.
Location: southbound exit slip to the A452 .
Due to: Bridge repairs are planned.
Status : Pending.
Schedule : From 20:00 on 25 January 2025 to 06:00 on 26 January 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.43 miles from Cheslyn Hay.
Location: northbound between junctions J10 (Walsall) and J11 (Cannock) .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 19 December 2024 to 06:00 on 20 December 2024.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 3.2 miles from Cheslyn Hay.
Location: southbound between junctions J10 (Tamworth) and J9 (Lichfield) .
Lane Closures : Lane one will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 19 December 2024 to 06:00 on 20 December 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 15.92 miles from Cheslyn Hay.
Location: northbound between junctions J9 (Lichfield) and J10 (Tamworth) .
Lane Closures : Lane one will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 19 December 2024 to 06:00 on 20 December 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 15.83 miles from Cheslyn Hay.
Location: southbound between the M6 and junction J1 (West Bromwich) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 19 December 2024 to 06:00 on 20 December 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 9.19 miles from Cheslyn Hay.
Location: northbound between junction J2 (Dudley) and the M6 .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 19 December 2024 to 06:00 on 20 December 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 10.93 miles from Cheslyn Hay.
Location: southbound exit slip at junction J8 (Birmingham) .
Lane Closures : Lane two will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 19 December 2024 to 06:00 on 20 December 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 8.86 miles from Cheslyn Hay.
Location: northbound entry slip at junction J6 (Birmingham) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 19 December 2024 to 06:00 on 20 December 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 12.78 miles from Cheslyn Hay.
Location: southbound between junctions J7 (Birmingham) and J6 (Birmingham) .
Lane Closures : The hard shoulder, lanes 1 and 2 are closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 18 December 2024.
Lanes Closed : There are two of three lanes closed.
Nearest town: 9.78 miles from Cheslyn Hay.
Location: southbound between the junctions with the A513 and the A5192 .
Due to: Bridge repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 24 February 2025 to 1 March 2025.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 3 March 2025 to 8 March 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 11.76 miles from Cheslyn Hay.
Location: southbound.
Due to: Bridge repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 24 February 2025 to 1 March 2025.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 3 March 2025 to 8 March 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 11.75 miles from Cheslyn Hay.
Location: westbound between junctions J6 (Telford W) and J7 (Wellington) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 6 January 2025 to 11 January 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 13 January 2025 to 16 January 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 18.37 miles from Cheslyn Hay.
Location: westbound between junctions J5 (Telford) and J6 (Telford W) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 6 January 2025 to 11 January 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 13 January 2025 to 16 January 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 17.52 miles from Cheslyn Hay.
Location: westbound between junctions J5 (Telford) and J6 (Telford W) .
Lane Closures : Lane three will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 16 January 2025 to 18 January 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 20 January 2025 to 24 January 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 17.52 miles from Cheslyn Hay.
Location: northbound.
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 18 December 2024 to 20 December 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 16.16 miles from Cheslyn Hay.
Location: northbound between the A513 and the junction with the A5121 Burton Upon Trent South.
Lane Closures : Lane one will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 18 December 2024 to 20 December 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 15.51 miles from Cheslyn Hay.
Location: southbound exit slip at junction J8 (Birmingham E) .
Lane Closures : The hard shoulder and lane 1 are closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 18 December 2024.
Lanes Closed : There is one of two lanes closed.
Nearest town: 16.7 miles from Cheslyn Hay.
Location: northbound between junctions J4 (Lichfield) and J6 (Birmingham) .
Lane Closures : The hard shoulder, lanes 1 and 2 are closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 18 December 2024.
Lanes Closed : There are two of three lanes closed.
Nearest town: 16.63 miles from Cheslyn Hay.
Location: northbound exit slip at junction J5 (Birmingham) .
Due to: Roadworks.
Period : expect disruption until 05:00 on 18 December 2024.
Lanes Closed : All lanes are closed.
Nearest town: 15.01 miles from Cheslyn Hay.
Location: southbound entry slip at junction J8 (Birmingham E) .
Lane Closures : Lane one is closed.
Due to: Bridge repairs.
Period : expect disruption until 05:00 on 5 January 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 16.88 miles from Cheslyn Hay.
Location: southbound exit slip at junction J8 (Birmingham E) .
Lane Closures : Lane one is closed.
Due to: Bridge repairs.
Period : expect disruption until 05:00 on 5 January 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 16.67 miles from Cheslyn Hay.
Location: southbound exit slip to the A5121 .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 31 December 2024.
Lanes Closed : There is one of two lanes closed.
Nearest town: 18.01 miles from Cheslyn Hay.
Location: southbound exit slip to the A5121 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 7 January 2025 to 06:00 on 8 January 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 17.99 miles from Cheslyn Hay.
Location: northbound exit slip to the A5121 .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 31 December 2024.
Lanes Closed : There is one of two lanes closed.
Nearest town: 17.71 miles from Cheslyn Hay.
Location: northbound entry slip at junction J6 (Birmingham) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 21:00 on 19 December 2024 to 06:00 on 20 December 2024.
Nearest town: 12.78 miles from Cheslyn Hay.
Location: southbound at junction J6 (Birmingham) .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 18 December 2024.
Lanes Closed : There is one of two lanes closed.
Nearest town: 12.72 miles from Cheslyn Hay.
Location: southbound between junctions J6 (Birmingham) and J5 (Birmingham) .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 18 December 2024.
Lanes Closed : There is one of three lanes closed.
Nearest town: 13.12 miles from Cheslyn Hay.
Location: southbound entry slip at junction J6 (Birmingham) .
Due to: Roadworks.
Period : expect disruption until 06:00 on 18 December 2024.
Lanes Closed : All lanes are closed.
Nearest town: 12.78 miles from Cheslyn Hay.
Location: southbound entry slip at junction J6 (Birmingham) .
Due to: Roadworks.
Period : expect disruption until 06:00 on 18 December 2024.
Lanes Closed : All lanes are closed.
Nearest town: 12.86 miles from Cheslyn Hay.
Location: southbound between junctions J11 (Cannock) and J10 (Walsall) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 21:00 on 6 January 2025 to 06:00 on 12 February 2025.