Location: eastbound between junctions J10 (Reading) and J8 (High Wycombe) .
Lane Closures : The hard shoulder and lane 1 are closed.
Due to: Broken down vehicle.
Time To Clear : The event is expected to clear between 23:30 and 23:45 on 1 June 2025.
Normal traffic conditions are expected between 23:30 and 23:45 on 1 June 2025.
Lanes Closed : There is one of four lanes closed.
Nearest town: 19.37 miles from Browninghill Green.

Location: eastbound between junctions J12 (Reading) and J11 (Basingstoke) .
Lane Closures : The hard shoulder and lane 1 are closed.
Due to: Broken down vehicle.
Time To Clear : The event is expected to clear between 21:30 and 21:45 on 1 June 2025.
Normal traffic conditions are expected between 21:30 and 21:45 on 1 June 2025.
Lanes Closed : There is one of four lanes closed.
Nearest town: 9.95 miles from Browninghill Green.

Location: eastbound between junctions J13 (Newbury) and J12 (Reading) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 2 June 2025 to 06:00 on 3 June 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 9.72 miles from Browninghill Green.

Location: eastbound entry slip at junction J9 (Winchester) .
Due to: Roadworks scheme.
Period : from 21:01 on 29 May 2025 to 06:00 on 6 June 2025.
Nearest town: 18.42 miles from Browninghill Green.

Location: westbound entry slip at Reading Services.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 2 June 2025 to 06:00 on 3 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 8.89 miles from Browninghill Green.

Location: westbound exit slip at Reading Services.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 2 June 2025 to 06:00 on 3 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 8.96 miles from Browninghill Green.

Location: westbound between junctions J11 (Basingstoke) and J12 (Reading) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 2 June 2025 to 06:00 on 3 June 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 9.39 miles from Browninghill Green.

Location: eastbound between junctions J13 (Newbury) and J12 (Reading) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 2 June 2025 to 06:00 on 10 October 2025.
Nearest town: 10.79 miles from Browninghill Green.

Location: southbound.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 21:30 on 2 June 2025 to 06:00 on 3 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 14.59 miles from Browninghill Green.

Location: southbound.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 21:30 on 2 June 2025 to 06:00 on 3 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 13.15 miles from Browninghill Green.

Location: westbound.
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 21:00 on 2 June 2025 to 06:00 on 7 June 2025.
Nearest town: 19.44 miles from Browninghill Green.

Location: westbound between junctions J4A (Farnborough) and J5 (Hook) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 2 June 2025 to 06:00 on 3 June 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 11.95 miles from Browninghill Green.

Location: southbound exit slip to the A303 .
Due to: Planned Roadworks.
Period : expect disruption until 06:00 on 2 June 2025.
Lanes Closed : All lanes are closed.
Nearest town: 12.88 miles from Browninghill Green.

Location: southbound between the A343 and the junction with the A303 .
Lane Closures : Lane one is closed.
Due to: Planned Roadworks.
Period : expect disruption until 06:00 on 2 June 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 12.12 miles from Browninghill Green.

Location: southbound between the A272 and the junction with the M3 .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 2 June 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 17.24 miles from Browninghill Green.

Location: eastbound between junctions J13 (Newbury) and J10 (Reading) .
Due to: Roadworks scheme.
Period : from 20:10 on 15 May 2025 to 06:00 on 18 June 2025.
Nearest town: 9.29 miles from Browninghill Green.

Location: southbound entry slip from the A33 .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 31 December 2027.
Lanes Closed : There is one of two lanes closed.
Nearest town: 17.26 miles from Browninghill Green.

Location: westbound between junctions J7 (Basingstoke) and J9 (Winchester) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 9 February 2027.
Nearest town: 7.79 miles from Browninghill Green.

Location: eastbound between junctions J9 (Winchester) and J7 (Basingstoke) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 9 February 2027.
Nearest town: 8.03 miles from Browninghill Green.

Location: westbound between junctions J8 (Andover) and J9 (Winchester) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 9 February 2027.
Nearest town: 8.09 miles from Browninghill Green.

Location: southbound between the A4185 and the junction with the M4 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 8 June 2025 to 06:00 on 9 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 16.94 miles from Browninghill Green.

Location: westbound between junctions J6 (Basingstoke) and J7 (Basingstoke) .
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 7 June 2025 to 06:00 on 8 June 2025.
Nearest town: 7.34 miles from Browninghill Green.

Location: westbound entry slip at junction J7 (Basingstoke) .
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 21:30 on 7 June 2025 to 06:00 on 8 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 7.55 miles from Browninghill Green.

Location: westbound exit slip at junction J7 (Basingstoke) .
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 21:30 on 7 June 2025 to 06:00 on 8 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 7.42 miles from Browninghill Green.

Location: eastbound entry slip at junction J5 (Hook) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 21:30 on 6 June 2025 to 06:00 on 7 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 9.8 miles from Browninghill Green.

Location: eastbound exit slip at junction J5 (Hook) .
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 21:00 on 6 June 2025 to 06:00 on 7 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 9.59 miles from Browninghill Green.

Location: eastbound entry slip at junction J13 (Newbury) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 4 June 2025 to 7 June 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 9 June 2025 to 14 June 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 16 June 2025 to 21 June 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 23 June 2025 to 27 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 10.62 miles from Browninghill Green.

Location: eastbound between junctions J13 (Newbury) and J12 (Reading) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 4 June 2025 to 7 June 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 9 June 2025 to 14 June 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 16 June 2025 to 21 June 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 23 June 2025 to 27 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 10.79 miles from Browninghill Green.

Location: eastbound between junctions J13 (Newbury) and J12 (Reading) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 3 June 2025 to 06:00 on 4 June 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 9.2 miles from Browninghill Green.

Location: eastbound exit slip at junction J12 (Reading) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 4 June 2025 to 7 June 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 9 June 2025 to 14 June 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 16 June 2025 to 21 June 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 23 June 2025 to 27 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 9.01 miles from Browninghill Green.

Location: southbound.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 21:30 on 5 June 2025 to 06:00 on 6 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 10.53 miles from Browninghill Green.

Location: southbound between the A343 and the junction with the A303 .
Lane Closures : Lane one will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 5 June 2025 to 06:00 on 6 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 10.3 miles from Browninghill Green.

Location: westbound between junctions J3 (Woking) and J4 (Guildford) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 8 August 2025 to 06:00 on 9 August 2025.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 19.92 miles from Browninghill Green.

Location: westbound exit slip at junction J6 (Basingstoke) .
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 21:30 on 4 June 2025 to 06:00 on 5 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 6.63 miles from Browninghill Green.

Location: westbound between junctions J5 (Hook) and J6 (Basingstoke) .
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 21:30 on 4 June 2025 to 06:00 on 5 June 2025.
Nearest town: 6.76 miles from Browninghill Green.

Location: westbound entry slip at junction J6 (Basingstoke) .
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 21:30 on 4 June 2025 to 06:00 on 5 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 6.6 miles from Browninghill Green.

Location: eastbound between junctions J7 (Basingstoke) and J6 (Basingstoke) .
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 21:30 on 5 June 2025 to 06:00 on 6 June 2025.
Nearest town: 6.5 miles from Browninghill Green.

Location: eastbound exit slip at junction J6 (Basingstoke) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 21:30 on 5 June 2025 to 06:00 on 6 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 6.52 miles from Browninghill Green.

Location: eastbound entry slip at junction J6 (Basingstoke) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 21:30 on 5 June 2025 to 06:00 on 6 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 6.52 miles from Browninghill Green.

Location: southbound between the junctions with the A343 and the A303 .
Lane Closures : Lane one will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 4 June 2025 to 06:00 on 5 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 8.55 miles from Browninghill Green.

Location: eastbound entry slip at junction J7 (Basingstoke) .
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 21:30 on 3 June 2025 to 06:00 on 4 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 7.45 miles from Browninghill Green.

Location: eastbound exit slip at junction J7 (Basingstoke) .
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 21:30 on 3 June 2025 to 06:00 on 4 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 7.61 miles from Browninghill Green.

Location: southbound.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 21:30 on 3 June 2025 to 06:00 on 4 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 8.36 miles from Browninghill Green.

Location: southbound.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 21:30 on 3 June 2025 to 06:00 on 4 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 8.12 miles from Browninghill Green.

Location: westbound between junctions J12 (Reading) and J13 (Newbury) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 3 June 2025 to 06:00 on 4 June 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 10.03 miles from Browninghill Green.

Location: westbound between the A343 and the junction with the A342 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 2 June 2025 to 6 June 2025.
Schedule : From 20:00 on 6 June 2025 to 06:00 on 7 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 17.08 miles from Browninghill Green.

Location: westbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 2 June 2025 to 6 June 2025.
Schedule : From 20:00 on 6 June 2025 to 06:00 on 7 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.42 miles from Browninghill Green.

Location: westbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 2 June 2025 to 6 June 2025.
Schedule : From 20:00 on 6 June 2025 to 06:00 on 7 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.53 miles from Browninghill Green.

Location: westbound between the A342 and the junction with the A345 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 2 June 2025 to 6 June 2025.
Schedule : From 20:00 on 6 June 2025 to 06:00 on 7 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 17.13 miles from Browninghill Green.

Location: westbound entry slip at junction J10 (Reading) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 16 June 2025 to 06:00 on 17 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 15.35 miles from Browninghill Green.

Location: westbound at junction J10 (Reading) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 16 June 2025 to 06:00 on 17 June 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 15.34 miles from Browninghill Green.

Location: westbound entry slip at junction J10 (Reading) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 3 June 2025 to 6 June 2025.
Schedule : From 20:00 on 16 June 2025 to 06:00 on 17 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 15.45 miles from Browninghill Green.

Location: westbound between junctions J10 (Reading) and J11 (Basingstoke) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 16 June 2025 to 06:00 on 17 June 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 14.83 miles from Browninghill Green.

Location: eastbound between junctions J12 (Reading) and J11 (Basingstoke) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 17 June 2025 to 06:00 on 18 June 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 8.91 miles from Browninghill Green.

Location: eastbound between junctions J13 (Newbury) and J12 (Reading) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 17 June 2025 to 06:00 on 18 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 9.29 miles from Browninghill Green.

Location: westbound between junctions J10 (Reading) and J11 (Basingstoke) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 3 June 2025 to 06:00 on 17 June 2025.
Nearest town: 15.45 miles from Browninghill Green.

Location: southbound exit slip to the A4185 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 28 September 2025 to 30 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.01 miles from Browninghill Green.