Location: southbound between junctions J15 (Northampton) and J14 (Milton Keynes) .
Lane Closures : The hard shoulder and lane 1 are closed.
Due to: Broken down vehicle.
Time To Clear : The event is expected to clear between 22:15 and 22:30 on 21 November 2024.
Normal traffic conditions are expected between 22:15 and 22:30 on 21 November 2024.
Lanes Closed : There is one of four lanes closed.
Nearest town: 15.55 miles from Brackley.
Location: southbound exit slip to the A420 .
Due to: Congestion.
Normal traffic conditions are expected between 02:00 and 02:15 on 22 November 2024.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 19.95 miles from Brackley.
Location: northbound between junctions J8A (Thame) and J9 (Bicester) .
Lane Closures : Lanes 2 and 3 are closed.
Due to: Barrier repairs.
Period : expect disruption until 06:00 on 22 November 2024.
Lanes Closed : There are two of three lanes closed.
Nearest town: 15.99 miles from Brackley.
Location: southbound between junctions J9 (Bicester) and J8A (Thame) .
Lane Closures : Lanes 2 and 3 are closed.
Due to: Barrier repairs.
Period : expect disruption until 06:00 on 22 November 2024.
Lanes Closed : There are two of three lanes closed.
Nearest town: 14.02 miles from Brackley.
Location: northbound between junctions J14 (Milton Keynes) and J15 (Northampton) .
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 22:00 on 22 November 2024 to 05:00 on 23 November 2024.
Nearest town: 17.92 miles from Brackley.
Location: northbound between junctions J8A (Thame) and J9 (Bicester) .
Lane Closures : The hard shoulder is closed.
Due to: Barrier repairs.
Period : expect disruption until 06:00 on 23 November 2024.
Nearest town: 12.31 miles from Brackley.
Location: northbound between junctions J11 (Banbury) and J12 (Gaydon) .
Lane Closures : Lanes 1 and 2 are closed.
Due to: Road repairs.
Period : expect disruption until 06:00 on 22 November 2024.
Lanes Closed : There are two of three lanes closed.
Nearest town: 10.87 miles from Brackley.
Location: northbound between junctions J12 (Gaydon) and J14 (Leamington) .
Lane Closures : Lanes 2 and 3 are closed.
Due to: Road repairs.
Period : expect disruption until 06:00 on 22 November 2024.
Lanes Closed : There are two of three lanes closed.
Nearest town: 17.72 miles from Brackley.
Location: southbound between the junctions with the A43 and the A508 .
Due to: Roadworks.
Period : expect disruption until 06:00 on 22 November 2024.
Nearest town: 9.88 miles from Brackley.
Location: northbound between the junctions with the A508 and the A43 .
Due to: Roadworks.
Period : expect disruption until 06:00 on 22 November 2024.
Nearest town: 9.88 miles from Brackley.
Location: southbound between the A422 Brackley South and the junction with the A421 .
Due to: Roadworks scheme.
Period : from 20:08 on 21 November 2024 to 06:00 on 14 December 2024.
Nearest town: 1.32 miles from Brackley.
Location: northbound between junctions J10 (Northampton) and J12 (Gaydon) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 22:15 on 22 November 2024 to 06:00 on 23 November 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 6.66 miles from Brackley.
Location: southbound entry slip at junction J11 (Banbury) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 22:15 on 22 November 2024 to 06:00 on 23 November 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 7.06 miles from Brackley.
Location: northbound between the junctions with the A5 and the M1 .
Lane Closures : Lane one will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 20:00 on 22 November 2024 to 06:00 on 23 November 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 15.14 miles from Brackley.
Location: southbound between junctions J11 (Banbury) and J10 (Northampton) .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 19:00 on 22 November 2024 to 23:59 on 26 November 2024.
Nearest town: 6.09 miles from Brackley.
Location: northbound between junctions J11 (Banbury) and J12 (Gaydon) .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 19:00 on 22 November 2024 to 23:59 on 27 November 2024.
Nearest town: 7.71 miles from Brackley.
Location: northbound between junctions J11 (Banbury) and J12 (Gaydon) .
Lane Closures : The hard shoulder is closed.
Due to: Barrier repairs.
Period : expect disruption until 23:59 on 22 November 2024.
Nearest town: 13.6 miles from Brackley.
Location: southbound between junctions J12 (Gaydon) and J11 (Banbury) .
Lane Closures : The hard shoulder is closed.
Due to: Horticultural works.
Period : expect disruption until 23:59 on 22 November 2024.
Nearest town: 11.83 miles from Brackley.
Location: southbound between junctions J11 (Banbury) and J10 (Northampton) .
Lane Closures : The hard shoulder is closed.
Due to: Horticultural works.
Period : expect disruption until 23:59 on 27 November 2024.
Nearest town: 5.49 miles from Brackley.
Location: southbound between junctions J12 (Gaydon) and J11 (Banbury) .
Lane Closures : The hard shoulder is closed.
Due to: Horticultural works.
Period : expect disruption until 23:59 on 26 November 2024.
Nearest town: 10.41 miles from Brackley.
Location: southbound between junctions J10 (Northampton) and J9 (Bicester) .
Lane Closures : The hard shoulder is closed.
Due to: Horticultural works.
Period : expect disruption until 23:59 on 21 November 2024.
Nearest town: 9.52 miles from Brackley.
Location: northbound between junctions J11 (Banbury) and J12 (Gaydon) .
Lane Closures : The hard shoulder is closed.
Due to: Horticultural works.
Period : expect disruption until 23:59 on 21 November 2024.
Nearest town: 12.87 miles from Brackley.
Location: southbound between junctions J11 (Banbury) and J10 (Northampton) .
Lane Closures : The hard shoulder is closed.
Due to: Horticultural works.
Period : expect disruption until 23:59 on 29 November 2024.
Nearest town: 5.26 miles from Brackley.
Location: northbound exit slip at junction J9 (Bicester) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 21 November 2024 to 23 November 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 11.72 miles from Brackley.
Location: northbound between junctions J8A (Thame) and J9 (Bicester) .
Lane Closures : Lane one is closed.
Due to: Barrier repairs.
Period : expect disruption until 06:00 on 22 November 2024.
Lanes Closed : There is one of three lanes closed.
Nearest town: 12.59 miles from Brackley.
Location: northbound between the M40 and the junction with the A5 .
Due to: Roadworks scheme.
Period : from 20:03 on 21 November 2024 to 06:00 on 14 December 2024.
Nearest town: 2.54 miles from Brackley.
Location: southbound between junctions J11 (Banbury) and J10 (Northampton) .
Due to: Roadworks scheme.
Period : from 21:30 on 21 November 2024 to 06:00 on 14 December 2024.
Nearest town: 5.64 miles from Brackley.
Location: southbound between junctions J10 (Northampton) and J9 (Bicester) .
Lane Closures : Lane one will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 21:00 on 28 November 2024 to 05:00 on 29 November 2024.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 6.69 miles from Brackley.
Location: southbound at junction J10 (Northampton) .
Lane Closures : Lane one will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 21:00 on 28 November 2024 to 05:00 on 29 November 2024.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 6.11 miles from Brackley.
Location: southbound between junctions J9 (Bicester) and J8A (Thame) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 28 November 2024 to 30 November 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 12.17 miles from Brackley.
Location: northbound between the junctions with the A5 and the M1 .
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 28 November 2024 to 06:00 on 29 November 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 12.45 miles from Brackley.
Location: southbound between the junctions with the M1 and the A5 .
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 28 November 2024 to 06:00 on 29 November 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 15.17 miles from Brackley.
Location: northbound between junctions J11 (Banbury) and J12 (Gaydon) .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 19:00 on 28 November 2024 to 23:59 on 2 December 2024.
Nearest town: 8.13 miles from Brackley.
Location: southbound exit slip at junction J10 (Northampton) .
Due to: Roadworks.
Period : expect disruption until 06:00 on 22 November 2024.
Lanes Closed : All lanes are closed.
Nearest town: 5.86 miles from Brackley.
Location: southbound between junctions J11 (Banbury) and J10 (Northampton) .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 22 November 2024.
Lanes Closed : There is one of three lanes closed.
Nearest town: 5.64 miles from Brackley.
Location: southbound between the A421 and the junction with the M40 .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 21:30 on 10 December 2024 to 06:00 on 13 December 2024.
Nearest town: 5.24 miles from Brackley.
Location: southbound between the A421 and the junction with the M40 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:30 and 06:00 from 10 December 2024 to 13 December 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 5.24 miles from Brackley.
Location: southbound between the junctions with the A421 and the M40 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:30 and 06:00 from 10 December 2024 to 13 December 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 5.57 miles from Brackley.
Location: northbound between the junctions with the M40 and the A421 .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 22 November 2024.
Lanes Closed : There is one of two lanes closed.
Nearest town: 5.96 miles from Brackley.
Location: southbound between the A5 and the junction with the A413 Silverstone.
Lane Closures : Lane one is closed.
Due to: Road repairs.
Period : expect disruption until 06:00 on 22 November 2024.
Lanes Closed : There is one of two lanes closed.
Nearest town: 9.42 miles from Brackley.
Location: southbound between the junctions with the A5 and the A413 Silverstone.
Lane Closures : Lane one will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 25 November 2024 to 15 December 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 8.39 miles from Brackley.
Location: northbound entry slip from the A413 Whittlebury.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 20:00 on 14 December 2024 to 06:00 on 15 December 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 8.33 miles from Brackley.
Location: northbound between the A413 Silverstone and the junction with the A5 .
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 20:00 on 14 December 2024 to 06:00 on 15 December 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 5.91 miles from Brackley.
Location: northbound entry slip from the A413 Silverstone.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 20:00 on 14 December 2024 to 06:00 on 15 December 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 6.43 miles from Brackley.
Location: southbound entry slip at junction J14 (Milton Keynes) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 29 November 2024 to 05:00 on 30 November 2024.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 10 December 2024 to 14 December 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 19.56 miles from Brackley.
Location: southbound between junctions J15 (Northampton) and J14 (Milton Keynes) .
Lane Closures : Lanes 2, 3 and 4 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 29 November 2024 to 05:00 on 30 November 2024.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 10 December 2024 to 14 December 2024.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 18.94 miles from Brackley.
Location: southbound between junctions J14 (Milton Keynes) and J11 (Luton) .
Lane Closures : Lanes 1, 2, 3 and 4 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 29 November 2024 to 05:00 on 30 November 2024.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 10 December 2024 to 14 December 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 19.31 miles from Brackley.
Location: northbound between the junctions with the M40 and the A421 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 2 December 2024 to 6 December 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 2.84 miles from Brackley.
Location: southbound between the junctions with the A422 Brackley South and the A421 .
Lane Closures : Lane two is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 22 November 2024.
Lanes Closed : There is one of two lanes closed.
Nearest town: 1.32 miles from Brackley.
Location: southbound at the junction with the A421 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 2 December 2024 to 6 December 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 2.55 miles from Brackley.
Location: northbound between the junctions with the A421 and the A422 Brackley South.
Lane Closures : Lane two is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 22 November 2024.
Lanes Closed : There is one of two lanes closed.
Nearest town: 1.46 miles from Brackley.
Location: northbound between the junctions with the A421 and the A422 Brackley South.
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 2 December 2024 to 6 December 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 2.54 miles from Brackley.
Location: northbound between the junctions with the A421 and the A422 Brackley South.
Due to: Roadworks.
Period : expect disruption until 06:00 on 22 November 2024.
Lanes Closed : All lanes are closed.
Nearest town: 1.45 miles from Brackley.
Location: northbound between the junctions with the A421 and the A422 Brackley South.
Due to: Roadworks.
Period : expect disruption until 06:00 on 22 November 2024.
Lanes Closed : All lanes are closed.
Nearest town: 2.54 miles from Brackley.
Location: northbound between the junctions with the A422 Brackley East and the A5 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 27 November 2024 to 06:00 on 28 November 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 1.05 miles from Brackley.
Location: southbound between junctions J18 (Daventry) and J16 (Northampton) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 27 November 2024 to 06:00 on 28 November 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 12 December 2024 to 14 December 2024.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 19.47 miles from Brackley.
Location: southbound between junctions J18 (Daventry) and J16 (Northampton) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 25 November 2024 to 27 November 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 10 December 2024 to 12 December 2024.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 16.03 miles from Brackley.
Location: northbound between junctions J15A (Northampton) and J18 (Daventry) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 25 November 2024 to 29 November 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 9 December 2024 to 11 December 2024.
Schedule : From 20:00 on 13 December 2024 to 06:00 on 14 December 2024.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 15.11 miles from Brackley.
Location: northbound between junctions J14 (Milton Keynes) and J15 (Northampton) .
Lane Closures : Lane one will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 27 November 2024 to 05:00 on 28 November 2024.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 18.04 miles from Brackley.
Location: southbound between junctions J9 (Bicester) and J8A (Thame) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 21:00 on 27 November 2024 to 06:00 on 28 November 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 13.34 miles from Brackley.
Location: southbound between junctions J9 (Bicester) and J8A (Thame) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 21:00 on 27 November 2024 to 06:00 on 28 November 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 17.31 miles from Brackley.
Location: northbound between junctions J11 (Banbury) and J12 (Gaydon) .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 19:00 on 27 November 2024 to 23:59 on 28 November 2024.
Nearest town: 14.73 miles from Brackley.
Location: southbound between junctions J11 (Banbury) and J10 (Northampton) .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 19:00 on 27 November 2024 to 23:59 on 28 November 2024.
Nearest town: 5.69 miles from Brackley.
Location: northbound between junctions J14 (Milton Keynes) and J15 (Northampton) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Litter clearance is planned.
Status : Pending.
Schedule : From 22:00 on 26 November 2024 to 05:00 on 27 November 2024.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 18.94 miles from Brackley.
Location: northbound entry slip at junction J10 (Northampton) .
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 06:00 on 27 November 2024 to 06:00 on 28 November 2024.
Nearest town: 6.34 miles from Brackley.
Location: southbound between junctions J15 (Northampton) and J14 (Milton Keynes) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 26 November 2024 to 05:00 on 27 November 2024.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 17.2 miles from Brackley.
Location: southbound between junctions J15 (Northampton) and J14 (Milton Keynes) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 26 November 2024 to 05:00 on 27 November 2024.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 15.61 miles from Brackley.
Location: northbound entry slip at junction J10 (Northampton) .
Lane Closures : Lane one will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:30 and 06:00 from 26 November 2024 to 28 November 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 6.34 miles from Brackley.
Location: northbound at junction J10 (Northampton) .
Lane Closures : Lane one will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:30 and 06:00 from 26 November 2024 to 28 November 2024.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 6.43 miles from Brackley.
Location: southbound between junctions J12 (Gaydon) and J11 (Banbury) .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 19:00 on 26 November 2024 to 23:59 on 29 November 2024.
Nearest town: 10.75 miles from Brackley.
Location: southbound exit slip at junction J15A (Northampton) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 25 November 2024 to 27 November 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 15.13 miles from Brackley.
Location: southbound entry slip at junction J15A (Northampton) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 25 November 2024 to 06:00 on 26 November 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 15.28 miles from Brackley.
Location: northbound between the junctions with the A5 and the M1 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 25 November 2024 to 27 November 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 15.16 miles from Brackley.
Location: northbound exit slip at junction J15A (Northampton) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 29 November 2024 to 06:00 on 30 November 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 15.24 miles from Brackley.
Location: southbound between the junctions with the M1 and the A5 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 25 November 2024 to 06:00 on 26 November 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 15.17 miles from Brackley.
Location: southbound between the junctions with the A43 and the A508 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 09:30 on 23 November 2024 to 15:30 on 24 November 2024.
Nearest town: 9.91 miles from Brackley.
Location: northbound between the junctions with the A508 and the A43 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 09:30 on 23 November 2024 to 15:30 on 24 November 2024.
Nearest town: 9.9 miles from Brackley.
Location: northbound between junctions J14 (Milton Keynes) and J15 (Northampton) .
Lane Closures : Lane one will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 20:00 on 25 November 2024 to 05:00 on 26 November 2024.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 15.58 miles from Brackley.
Location: southbound exit slip at junction J15A (Northampton) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 25 November 2024 to 06:00 on 27 November 2024.
Nearest town: 15.13 miles from Brackley.
Location: southbound between the junctions with the A43 and the A508 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 25 November 2024 to 28 November 2024.
Nearest town: 9.92 miles from Brackley.
Location: northbound between the junctions with the A508 and the A43 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 25 November 2024 to 28 November 2024.
Nearest town: 9.89 miles from Brackley.
Location: southbound between the junctions with the A422 Brackley South and the A421 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 05:00 from 23 November 2024 to 25 November 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 1.6 miles from Brackley.
Location: southbound between junctions J18 (Daventry) and J16 (Northampton) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 25 November 2024 to 06:00 on 14 December 2024.
Nearest town: 19.47 miles from Brackley.
Location: northbound between junctions J15A (Northampton) and J19 (Rugby) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 25 November 2024 to 06:00 on 14 December 2024.
Nearest town: 15.11 miles from Brackley.