Traffic Bowling Alley

SLIGHT
SEVERE
FULL SCREEN UPDATED: 03:40
×
×

Current traffic around Bowling Alley

The following traffic incidents and congestion for Bowling Alley have been reported by Highways England, Traffic Scotland, Traffic Wales or Transport for London (TfL) in the last two hours:


There are no current incidents in this location.

Roadworks

ROAD WORKS
Location: The M25 clockwise entry slip at junction J12 (Basingstoke) .
Reason: Barrier repairs.
Status: Currently Active.
Period: from 22:51 on 4 Nov 2024 to 05:00 on 5 Nov 2024.
Lanes Closed: All lanes are closed.
Nearest town: 18.1 miles from Bowling Alley.
ROAD WORKS
Location: The M25 anticlockwise entry slip at junction J12 (Basingstoke) .
Reason: Roadworks.
Status: Currently Active.
Period: from 22:34 on 4 Nov 2024 to 05:00 on 5 Nov 2024.
Lanes Closed: All lanes are closed.
Nearest town: 18.37 miles from Bowling Alley.
ROAD WORKS
Location: The M4 eastbound between junctions J11 (Basingstoke) and J10 (Reading) .
Reason: Roadworks.
Status: Currently Active.
Period: from 20:46 on 4 Nov 2024 to 05:00 on 5 Nov 2024.
Lanes Closed: All lanes are closed.
Nearest town: 12.92 miles from Bowling Alley.
ROAD WORKS
From Location: The A3 southbound between the A272 Petersfield South and the junction with the A3M .
To Location: The A3M southbound between junctions J1 and J2 .
Reason: Roadworks.
Status: Currently Active.
Period: from 20:20 on 4 Nov 2024 to 06:00 on 5 Nov 2024.
Lanes Closed: All lanes are closed.
Nearest town: 16.29 miles from Bowling Alley.
ROAD WORKS
Location: The M3 eastbound between junctions J7 (Basingstoke) and J6 (Basingstoke) .
Reason: Roadworks.
Status: Currently Active.
Period: from 20:05 on 4 Nov 2024 to 06:00 on 5 Nov 2024.
Lanes Closed: All lanes are closed.
Nearest town: 12.15 miles from Bowling Alley.
ROAD WORKS
Location: The M3 westbound between junctions J4A (Farnborough) and J5 (Hook) .
Lane closures: Lane three is closed.
Reason: Barrier repairs.
Status: Currently Active.
Period: expect disruption until 06:00 on 5 Nov 2024.
Lanes Closed: There is one of three lanes closed.
Nearest town: 4.04 miles from Bowling Alley. CLEARED @ 23:25
ROAD WORKS
Location: The M3 eastbound between junctions J5 (Hook) and J4A (Farnborough) .
Lane closures: Lane three is closed.
Reason: Barrier repairs.
Status: Currently Active.
Period: expect disruption until 06:00 on 5 Nov 2024.
Lanes Closed: There is one of three lanes closed.
Nearest town: 3.96 miles from Bowling Alley. CLEARED @ 23:24
ROAD WORKS
Location: The M3 westbound between junctions J3 (Woking) and J4 (Guildford) .
Lane closures: Lanes 1 and 2 are closed.
Reason: Roadworks.
Status: Currently Active.
Period: expect disruption until 06:00 on 5 Nov 2024.
Lanes Closed: There are two of four lanes closed.
Nearest town: 11.37 miles from Bowling Alley.
ROAD WORKS
Location: The M3 westbound at junction J3 (Woking) .
Lane closures: Lanes 1 and 2 are closed.
Reason: Roadworks.
Status: Currently Active.
Period: expect disruption until 06:00 on 5 Nov 2024.
Lanes Closed: There are two of three lanes closed.
Nearest town: 11.84 miles from Bowling Alley.
ROAD WORKS
Location: The M3 westbound between junctions J3 (Woking) and J4 (Guildford) .
Reason: Roadworks scheme.
Status: Currently Active.
Period: from 23:59 on 4 Nov 2024 to 06:00 on 5 Nov 2024.
Nearest town: 11.84 miles from Bowling Alley.
ROAD WORKS
Location: The M25 clockwise between junctions J10 (Guildford) and J11 (Chertsey) .
Lane closures: Lanes 1, 2 and 3 will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: From 22:00 on 5 Nov 2024 to 05:30 on 6 Nov 2024.
Lanes Closed: There will be three of four lanes closed.
Nearest town: 18.73 miles from Bowling Alley.
ROAD WORKS
Location: The M25 clockwise at junction J10 (Guildford) .
Lane closures: Lanes 1, 2 and 3 will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: From 22:00 on 5 Nov 2024 to 05:30 on 6 Nov 2024.
Lanes Closed: All lanes will be closed.
Nearest town: 19.29 miles from Bowling Alley.
ROAD WORKS
Location: The M25 anticlockwise between junctions J11 (Chertsey) and J10 (Guildford) .
Lane closures: Lanes 1, 2 and 3 will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: From 22:00 on 5 Nov 2024 to 05:30 on 6 Nov 2024.
Lanes Closed: There will be three of four lanes closed.
Nearest town: 18.07 miles from Bowling Alley.
ROAD WORKS
Location: The A3 southbound at the junction with the M25 .
Lane closures: Lane two will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 22:00 and 05:30 from 5 Nov 2024 to 8 Nov 2024.
Lanes Closed: There will be one of two lanes closed.
Nearest town: 19.27 miles from Bowling Alley.
ROAD WORKS
Location: The A3 southbound.
Reason: Roadworks are planned.
Status: Pending.
Schedule: From 21:00 on 5 Nov 2024 to 06:00 on 6 Nov 2024.
Lanes Closed: All lanes will be closed.
Nearest town: 10.32 miles from Bowling Alley.
ROAD WORKS
Location: The M4 westbound between junctions J10 (Reading) and J11 (Basingstoke) .
Reason: Roadworks scheme is planned.
Status: Pending.
Schedule: From 21:00 on 5 Nov 2024 to 06:00 on 7 Nov 2024.
Nearest town: 13.92 miles from Bowling Alley.
ROAD WORKS
Location: The A3 southbound between the A320 and the junction with the A283 .
Lane closures: Lane one will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: From 20:00 on 5 Nov 2024 to 06:00 on 6 Nov 2024.
Lanes Closed: There will be one of two lanes closed.
Nearest town: 11.38 miles from Bowling Alley.
ROAD WORKS
Location: The M3 westbound between junctions J1 (Sunbury) and J2 (Gatwick M23) .
Lane closures: The hard shoulder and lane 1 are closed.
Reason: Emergency barrier repairs.
Status: Currently Active.
Period: expect disruption until 05:30 on 5 Nov 2024.
Lanes Closed: There is one of three lanes closed.
Nearest town: 19.21 miles from Bowling Alley.
ROAD WORKS
Location: The M3 eastbound entry slip at junction J8 (Andover) .
Lane closures: Lane one is closed.
Reason: Roadworks.
Status: Currently Active.
Period: expect disruption until 06:00 on 5 Nov 2024.
Lanes Closed: There is one of two lanes closed.
Nearest town: 14.27 miles from Bowling Alley.
ROAD WORKS
Location: The M25 anticlockwise entry slip at junction J12 (Basingstoke) .
Reason: Emergency barrier repairs.
Status: Currently Active.
Period: expect disruption until 05:30 on 5 Nov 2024.
Lanes Closed: All lanes are closed.
Nearest town: 18.45 miles from Bowling Alley.
ROAD WORKS
Location: The M3 westbound at junction J2 (Gatwick M23) .
Lane closures: The hard shoulder and lane 1 are closed.
Reason: Emergency barrier repairs.
Status: Currently Active.
Period: expect disruption until 05:30 on 5 Nov 2024.
Lanes Closed: There is one of two lanes closed.
Nearest town: 18.64 miles from Bowling Alley.
ROAD WORKS
Location: The M3 eastbound between junctions J3 (Woking) and J2 (Gatwick M23) .
Lane closures: Lanes 1 and 2 are closed.
Reason: Emergency barrier repairs.
Status: Currently Active.
Period: expect disruption until 05:30 on 5 Nov 2024.
Lanes Closed: There are two of four lanes closed.
Nearest town: 17.38 miles from Bowling Alley.
ROAD WORKS
Location: The M25 anticlockwise at junction J12 (Basingstoke) .
Lane closures: The hard shoulder and lane 1 are closed.
Reason: Emergency barrier repairs.
Status: Currently Active.
Period: expect disruption until 05:30 on 5 Nov 2024.
Lanes Closed: There is one of three lanes closed.
Nearest town: 18.36 miles from Bowling Alley.
ROAD WORKS
Location: The M3 eastbound exit slip at junction J2 (Gatwick M23) .
Reason: Barrier repairs.
Status: Currently Active.
Period: expect disruption until 05:00 on 5 Nov 2024.
Lanes Closed: All lanes are closed.
Nearest town: 18.05 miles from Bowling Alley.
ROAD WORKS
Location: The M25 anticlockwise entry slip at junction J12 (Basingstoke) .
Reason: Barrier repairs.
Status: Currently Active.
Period: expect disruption until 05:00 on 5 Nov 2024.
Lanes Closed: All lanes are closed.
Nearest town: 18.23 miles from Bowling Alley.
ROAD WORKS
Location: The M25 clockwise entry slip at junction J12 (Basingstoke) .
Reason: Barrier repairs.
Status: Currently Active.
Period: expect disruption until 05:00 on 5 Nov 2024.
Lanes Closed: All lanes are closed.
Nearest town: 17.96 miles from Bowling Alley.
ROAD WORKS
Location: The M3 eastbound at junction J2 (Gatwick M23) .
Reason: Emergency barrier repairs.
Status: Currently Active.
Period: expect disruption until 05:30 on 5 Nov 2024.
Lanes Closed: All lanes are closed.
Nearest town: 17.96 miles from Bowling Alley.
ROAD WORKS
Location: The A3 northbound between the junctions with the A247 and the M25 .
Lane closures: Lanes 2 and 3 are closed.
Reason: Roadworks.
Status: Currently Active.
Period: expect disruption until 05:30 on 5 Nov 2024.
Lanes Closed: There are two of three lanes closed.
Nearest town: 18.01 miles from Bowling Alley.
ROAD WORKS
Location: The M3 westbound between junctions J3 (Woking) and J4 (Guildford) .
Reason: Roadworks scheme.
Status: Currently Active.
Period: from 21:04 on 4 Nov 2024 to 06:00 on 5 Jul 2025.
Nearest town: 11.58 miles from Bowling Alley.
ROAD WORKS
Location: The M3 westbound between junctions J3 (Woking) and J4 (Guildford) .
Lane closures: Lane one is closed.
Reason: Roadworks.
Status: Currently Active.
Period: expect disruption until 06:00 on 5 Jul 2025.
Lanes Closed: There is one of four lanes closed.
Nearest town: 11.37 miles from Bowling Alley.
ROAD WORKS
Location: The M3 westbound at junction J3 (Woking) .
Lane closures: Lane one is closed.
Reason: Roadworks.
Status: Currently Active.
Period: expect disruption until 06:00 on 5 Jul 2025.
Lanes Closed: There is one of three lanes closed.
Nearest town: 11.58 miles from Bowling Alley.
ROAD WORKS
Location: The M3 westbound between junctions J2 (Gatwick M23) and J3 (Woking) .
Lane closures: Lanes 1 and 2 are closed.
Reason: Roadworks.
Status: Currently Active.
Period: expect disruption until 06:00 on 5 Nov 2024.
Lanes Closed: There are two of four lanes closed.
Nearest town: 16.31 miles from Bowling Alley.
ROAD WORKS
Location: The A308M eastbound between the junctions with the M4 and the A308 .
Lane closures: Lane one is closed.
Reason: Horticultural works.
Status: Currently Active.
Period: expect disruption until 06:00 on 5 Nov 2024.
Lanes Closed: There is one of two lanes closed.
Nearest town: 19.38 miles from Bowling Alley.
ROAD WORKS
Location: The M4 westbound between junctions J10 (Reading) and J12 (Reading) .
Reason: Roadworks scheme.
Status: Currently Active.
Period: from 20:02 on 25 Oct 2024 to 06:00 on 26 Nov 2024.
Nearest town: 12.98 miles from Bowling Alley.
ROAD WORKS
Location: The M3 eastbound between junctions J8 (Andover) and J6 (Basingstoke) .
Reason: Roadworks scheme.
Status: Currently Active.
Period: from 20:00 on 4 Nov 2024 to 06:00 on 9 Nov 2024.
Nearest town: 12.51 miles from Bowling Alley.
ROAD WORKS
Location: The M4 eastbound between junctions J12 (Reading) and J10 (Reading) .
Reason: Roadworks scheme.
Status: Currently Active.
Period: from 14:12 on 10 Sep 2024 to 06:00 on 31 Mar 2025.
Nearest town: 16.34 miles from Bowling Alley.
ROAD WORKS
Location: The M4 eastbound at junction J10 (Reading) .
Lane closures: Lane one is closed.
Reason: Roadworks.
Status: Currently Active.
Period: expect disruption until 06:00 on 31 Mar 2025.
Lanes Closed: There is one of three lanes closed.
Nearest town: 13.29 miles from Bowling Alley.
ROAD WORKS
Location: The M4 eastbound at junction J12 (Reading) .
Lane closures: Lane one is closed.
Reason: Roadworks.
Status: Currently Active.
Period: expect disruption until 06:00 on 31 Mar 2025.
Lanes Closed: There is one of three lanes closed.
Nearest town: 16.34 miles from Bowling Alley.
ROAD WORKS
Location: The M4 westbound at junction J12 (Reading) .
Lane closures: Lane one is closed.
Reason: Roadworks.
Status: Currently Active.
Period: expect disruption until 06:00 on 31 Mar 2025.
Lanes Closed: There is one of three lanes closed.
Nearest town: 16.19 miles from Bowling Alley.
ROAD WORKS
Location: The M4 westbound between junctions J11 (Basingstoke) and J12 (Reading) .
Lane closures: Lane one is closed.
Reason: Roadworks.
Status: Currently Active.
Period: expect disruption until 06:00 on 31 Mar 2025.
Lanes Closed: There is one of four lanes closed.
Nearest town: 13.34 miles from Bowling Alley.
ROAD WORKS
Location: The M4 westbound between junctions J10 (Reading) and J11 (Basingstoke) .
Lane closures: Lane one is closed.
Reason: Roadworks.
Status: Currently Active.
Period: expect disruption until 06:00 on 31 Mar 2025.
Lanes Closed: There is one of four lanes closed.
Nearest town: 13.23 miles from Bowling Alley.
ROAD WORKS
Location: The M4 eastbound between junctions J11 (Basingstoke) and J10 (Reading) .
Lane closures: Lane one is closed.
Reason: Roadworks.
Status: Currently Active.
Period: expect disruption until 06:00 on 31 Mar 2025.
Lanes Closed: There is one of four lanes closed.
Nearest town: 12.86 miles from Bowling Alley.
ROAD WORKS
Location: The M4 eastbound at junction J11 (Basingstoke) .
Lane closures: Lane one is closed.
Reason: Roadworks.
Status: Currently Active.
Period: expect disruption until 06:00 on 31 Mar 2025.
Lanes Closed: There is one of three lanes closed.
Nearest town: 13.18 miles from Bowling Alley.
ROAD WORKS
Location: The M4 westbound at junction J11 (Basingstoke) .
Lane closures: Lane one is closed.
Reason: Roadworks.
Status: Currently Active.
Period: expect disruption until 06:00 on 31 Mar 2025.
Lanes Closed: There is one of three lanes closed.
Nearest town: 12.91 miles from Bowling Alley.
ROAD WORKS
Location: The M4 eastbound between junctions J12 (Reading) and J11 (Basingstoke) .
Lane closures: Lane one is closed.
Reason: Roadworks.
Status: Currently Active.
Period: expect disruption until 06:00 on 31 Mar 2025.
Lanes Closed: There is one of four lanes closed.
Nearest town: 16.05 miles from Bowling Alley.
ROAD WORKS
Location: The M4 westbound between junctions J11 (Basingstoke) and J12 (Reading) .
Reason: Roadworks scheme.
Status: Currently Active.
Period: from 21:00 on 31 Oct 2024 to 06:00 on 23 Nov 2024.
Nearest town: 16.21 miles from Bowling Alley.
ROAD WORKS
Location: The M4 eastbound between junctions J12 (Reading) and J10 (Reading) .
Reason: Roadworks scheme is planned.
Status: Pending.
Schedule: From 20:00 on 5 Nov 2024 to 06:00 on 11 Dec 2024.
Nearest town: 14.12 miles from Bowling Alley.
ROAD WORKS
Location: The M4 westbound at junction J12 (Reading) .
Lane closures: The hard shoulder is closed.
Reason: Roadworks.
Status: Currently Active.
Period: expect disruption until 06:00 on 6 Mar 2025.
Nearest town: 16.21 miles from Bowling Alley.
ROAD WORKS
Location: The M4 westbound between junctions J10 (Reading) and J12 (Reading) .
Reason: Roadworks scheme.
Status: Currently Active.
Period: from 23:01 on 15 May 2024 to 06:00 on 31 Mar 2025.
Nearest town: 13.39 miles from Bowling Alley.
ROAD WORKS
Location: The M3 westbound between junctions J2 (Gatwick M23) and J3 (Woking) .
Lane closures: Lane one is closed.
Reason: Road repairs.
Status: Currently Active.
Period: expect disruption until 06:00 on 31 Jan 2025.
Lanes Closed: There is one of four lanes closed.
Nearest town: 17.68 miles from Bowling Alley.
ROAD WORKS
Location: The M3 westbound between junctions J2 (Gatwick M23) and J4A (Farnborough) .
Reason: Roadworks scheme.
Status: Currently Active.
Period: from 23:00 on 29 Apr 2024 to 23:59 on 31 Mar 2025.
Nearest town: 16.35 miles from Bowling Alley.
ROAD WORKS
Location: The M3 westbound at junction J4 (Guildford) .
Lane closures: Lane one is closed.
Reason: Roadworks.
Status: Currently Active.
Period: expect disruption until 23:59 on 31 Mar 2025.
Lanes Closed: There is one of three lanes closed.
Nearest town: 7.54 miles from Bowling Alley.
ROAD WORKS
Location: The M3 westbound between junctions J3 (Woking) and J4 (Guildford) .
Lane closures: Lane one is closed.
Reason: Roadworks.
Status: Currently Active.
Period: expect disruption until 23:59 on 31 Mar 2025.
Lanes Closed: There is one of four lanes closed.
Nearest town: 11.37 miles from Bowling Alley.
ROAD WORKS
Location: The M3 westbound at junction J3 (Woking) .
Lane closures: Lane one is closed.
Reason: Roadworks.
Status: Currently Active.
Period: expect disruption until 23:59 on 31 Mar 2025.
Lanes Closed: There is one of three lanes closed.
Nearest town: 12.07 miles from Bowling Alley.
ROAD WORKS
Location: The M3 westbound between junctions J4 (Guildford) and J4A (Farnborough) .
Lane closures: Lane one is closed.
Reason: Roadworks.
Status: Currently Active.
Period: expect disruption until 23:59 on 31 Mar 2025.
Lanes Closed: There is one of four lanes closed.
Nearest town: 7.15 miles from Bowling Alley.
ROAD WORKS
Location: The M3 westbound between junctions J2 (Gatwick M23) and J3 (Woking) .
Lane closures: Lane one is closed.
Reason: Roadworks.
Status: Currently Active.
Period: expect disruption until 23:59 on 31 Mar 2025.
Lanes Closed: There is one of four lanes closed.
Nearest town: 16.35 miles from Bowling Alley.
ROAD WORKS
Location: The M25 clockwise between junctions J10 (Guildford) and J11 (Chertsey) .
Reason: Roadworks scheme.
Status: Currently Active.
Period: from 23:59 on 31 Dec 2023 to 23:59 on 31 May 2025.
Nearest town: 19.29 miles from Bowling Alley.
ROAD WORKS
Location: The M25 clockwise between junctions J10 (Guildford) and J11 (Chertsey) .
Lane closures: The hard shoulder is closed.
Reason: Roadworks.
Status: Currently Active.
Period: expect disruption until 23:59 on 31 May 2025.
Nearest town: 18.73 miles from Bowling Alley.
ROAD WORKS
Location: The M25 anticlockwise between junctions J10 (Guildford) and J9 (Leatherhead) .
Reason: Roadworks scheme.
Status: Currently Active.
Period: from 00:02 on 1 Jan 2024 to 23:59 on 31 May 2025.
Nearest town: 18.91 miles from Bowling Alley.
ROAD WORKS
Location: The M25 anticlockwise between junctions J10 (Guildford) and J9 (Leatherhead) .
Lane closures: The hard shoulder is closed.
Reason: Roadworks.
Status: Currently Active.
Period: expect disruption until 23:59 on 31 May 2025.
Nearest town: 19.45 miles from Bowling Alley.
ROAD WORKS
Location: The M25 clockwise at junction J10 (Guildford) .
Lane closures: The hard shoulder is closed.
Reason: Roadworks.
Status: Currently Active.
Period: expect disruption until 23:59 on 31 May 2025.
Nearest town: 19.29 miles from Bowling Alley.
ROAD WORKS
Location: The M25 anticlockwise at junction J10 (Guildford) .
Lane closures: The hard shoulder is closed.
Reason: Roadworks.
Status: Currently Active.
Period: expect disruption until 23:59 on 31 May 2025.
Nearest town: 18.91 miles from Bowling Alley.
ROAD WORKS
Location: The M3 westbound between junctions J7 (Basingstoke) and J9 (Winchester) .
Lane closures: The hard shoulder is closed.
Reason: Roadworks.
Status: Currently Active.
Period: expect disruption until 06:00 on 8 Feb 2025.
Nearest town: 13.01 miles from Bowling Alley.
ROAD WORKS
Location: The M3 eastbound between junctions J9 (Winchester) and J7 (Basingstoke) .
Lane closures: The hard shoulder is closed.
Reason: Roadworks.
Status: Currently Active.
Period: expect disruption until 06:00 on 8 Feb 2025.
Nearest town: 13.31 miles from Bowling Alley.
ROAD WORKS
Location: The M3 westbound between junctions J8 (Andover) and J9 (Winchester) .
Lane closures: The hard shoulder is closed.
Reason: Roadworks.
Status: Currently Active.
Period: expect disruption until 06:00 on 8 Feb 2025.
Nearest town: 13.35 miles from Bowling Alley.
ROAD WORKS
Location: The M3 eastbound between junctions J3 (Woking) and J2 (Gatwick M23) .
Lane closures: Lane three will be closed.
Reason: Emergency roadside equipment maintenance is planned.
Status: Pending.
Schedule: From 22:00 on 11 Nov 2024 to 05:00 on 12 Nov 2024.
Lanes Closed: There will be one of four lanes closed.
Nearest town: 17.07 miles from Bowling Alley.
ROAD WORKS
Location: The M3 eastbound at junction J2 (Gatwick M23) .
Lane closures: Lanes 1 and 2 will be closed.
Reason: Emergency roadside equipment maintenance is planned.
Status: Pending.
Schedule: From 22:00 on 11 Nov 2024 to 05:00 on 12 Nov 2024.
Lanes Closed: All lanes will be closed.
Nearest town: 18.12 miles from Bowling Alley.
ROAD WORKS
Location: The M3 westbound entry slip at junction J5 (Hook) .
Lane closures: Lanes 1 and 2 will be closed.
Reason: Road repairs are planned.
Status: Pending.
Schedule: From 21:00 on 11 Nov 2024 to 06:00 on 12 Nov 2024.
Lanes Closed: All lanes will be closed.
Nearest town: 4.64 miles from Bowling Alley.
ROAD WORKS
Location: The M3 westbound at junction J5 (Hook) .
Reason: Road repairs are planned.
Status: Pending.
Schedule: From 21:00 on 11 Nov 2024 to 06:00 on 12 Nov 2024.
Nearest town: 4.64 miles from Bowling Alley.
ROAD WORKS
Location: The A3 southbound.
Reason: Roadside drains works are planned.
Status: Pending.
Schedule: From 21:00 on 11 Nov 2024 to 06:00 on 12 Nov 2024.
Lanes Closed: All lanes will be closed.
Nearest town: 9.52 miles from Bowling Alley.
ROAD WORKS
Location: The M4 westbound at junction J11 (Basingstoke) .
Reason: Roadworks scheme is planned.
Status: Pending.
Schedule: From 21:00 on 11 Nov 2024 to 06:00 on 12 Nov 2024.
Nearest town: 12.91 miles from Bowling Alley.
ROAD WORKS
Location: The M4 westbound at junction J11 (Basingstoke) .
Lane closures: Lane one will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: From 21:00 on 11 Nov 2024 to 06:00 on 12 Nov 2024.
Lanes Closed: There will be one of three lanes closed.
Nearest town: 12.91 miles from Bowling Alley.
ROAD WORKS
Location: The M4 westbound exit slip at junction J11 (Basingstoke) .
Lane closures: Lane one will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: From 21:00 on 11 Nov 2024 to 06:00 on 12 Nov 2024.
Lanes Closed: There will be one of two lanes closed.
Nearest town: 12.91 miles from Bowling Alley.
ROAD WORKS
Location: The A3 northbound.
Reason: Roadworks scheme is planned.
Status: Pending.
Schedule: From 21:00 on 11 Nov 2024 to 06:00 on 13 Nov 2024.
Nearest town: 10.62 miles from Bowling Alley.
ROAD WORKS
Location: The A3 northbound.
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 21:00 and 06:00 from 11 Nov 2024 to 13 Nov 2024.
Lanes Closed: All lanes will be closed.
Nearest town: 11.62 miles from Bowling Alley.
ROAD WORKS
Location: The A3 southbound between the junctions with the A320 and the A31 .
Lane closures: Lane two will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 11 Nov 2024 to 13 Nov 2024.
Lanes Closed: There will be one of two lanes closed.
Nearest town: 11.66 miles from Bowling Alley.
ROAD WORKS
Location: The A3 northbound entry slip from the A31 .
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 21:00 and 06:00 from 11 Nov 2024 to 13 Nov 2024.
Lanes Closed: All lanes will be closed.
Nearest town: 10.62 miles from Bowling Alley.
ROAD WORKS
Location: The A3 northbound between the A283 and the junction with the A320 .
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 21:00 and 06:00 from 11 Nov 2024 to 13 Nov 2024.
Lanes Closed: All lanes will be closed.
Nearest town: 9.78 miles from Bowling Alley.
ROAD WORKS
Location: The A3 northbound.
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 21:00 and 06:00 from 11 Nov 2024 to 13 Nov 2024.
Lanes Closed: All lanes will be closed.
Nearest town: 9.82 miles from Bowling Alley.
ROAD WORKS
Location: The M3 eastbound entry slip at junction J8 (Andover) .
Lane closures: Lane one will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: From 20:00 on 12 Nov 2024 to 06:00 on 13 Nov 2024.
Lanes Closed: There will be one of two lanes closed.
Nearest town: 14.99 miles from Bowling Alley.
ROAD WORKS
Location: The M3 eastbound entry slip at junction J7 (Basingstoke) .
Reason: Roadworks are planned.
Status: Pending.
Schedule: From 21:00 on 11 Nov 2024 to 06:00 on 12 Nov 2024.
Lanes Closed: All lanes will be closed.
Nearest town: 12.51 miles from Bowling Alley.
ROAD WORKS
Location: The M3 eastbound between junctions J7 (Basingstoke) and J6 (Basingstoke) .
Lane closures: Lanes 2 and 3 will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: From 20:00 on 14 Nov 2024 to 06:00 on 15 Nov 2024.
Lanes Closed: There will be two of three lanes closed.
Nearest town: 12.68 miles from Bowling Alley.
ROAD WORKS
Location: The M3 eastbound between junctions J7 (Basingstoke) and J6 (Basingstoke) .
Lane closures: Lanes 1 and 2 will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: From 20:00 on 11 Nov 2024 to 06:00 on 12 Nov 2024.
Lanes Closed: There will be two of three lanes closed.
Nearest town: 12.68 miles from Bowling Alley.
ROAD WORKS
Location: The M3 eastbound exit slip at junction J7 (Basingstoke) .
Reason: Roadworks are planned.
Status: Pending.
Schedule: From 21:00 on 12 Nov 2024 to 06:00 on 13 Nov 2024.
Lanes Closed: All lanes will be closed.
Nearest town: 12.77 miles from Bowling Alley.
ROAD WORKS
Location: The A303 eastbound between the junctions with the A34 and the M3 .
Lane closures: Lane one will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: From 20:00 on 12 Nov 2024 to 06:00 on 13 Nov 2024.
Lanes Closed: There will be one of two lanes closed.
Nearest town: 15.26 miles from Bowling Alley.
ROAD WORKS
Location: The M4 eastbound entry slip at junction J10 (Reading) .
Lane closures: Lane one will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 11 Nov 2024 to 16 Nov 2024.
Lanes Closed: There will be one of two lanes closed.
Nearest town: 13.74 miles from Bowling Alley.
ROAD WORKS
Location: The M4 eastbound between junctions J12 (Reading) and J11 (Basingstoke) .
Lane closures: Lanes 1, 2 and 3 will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 5 Nov 2024 to 9 Nov 2024.
Lanes Closed: There will be three of four lanes closed.
Nearest town: 15.7 miles from Bowling Alley.
ROAD WORKS
Location: The M4 eastbound at junction J11 (Basingstoke) .
Lane closures: Lanes 1, 2 and 3 will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 5 Dec 2024 to 7 Dec 2024.
Schedule: From 20:00 on 9 Dec 2024 to 06:00 on 10 Dec 2024.
Lanes Closed: All lanes will be closed.
Nearest town: 13.18 miles from Bowling Alley.
ROAD WORKS
Location: The M4 eastbound between junctions J12 (Reading) and J11 (Basingstoke) .
Lane closures: Lanes 1, 2 and 3 will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 5 Dec 2024 to 7 Dec 2024.
Schedule: From 20:00 on 9 Dec 2024 to 06:00 on 10 Dec 2024.
Lanes Closed: There will be three of four lanes closed.
Nearest town: 14.12 miles from Bowling Alley.
ROAD WORKS
Location: The M4 eastbound between junctions J11 (Basingstoke) and J10 (Reading) .
Lane closures: Lanes 1, 2 and 3 will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: From 20:00 on 21 Nov 2024 to 06:00 on 22 Nov 2024.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 9 Dec 2024 to 11 Dec 2024.
Lanes Closed: There will be three of four lanes closed.
Nearest town: 13.01 miles from Bowling Alley.
ROAD WORKS
Location: The M4 eastbound between junctions J11 (Basingstoke) and J10 (Reading) .
Lane closures: Lanes 1, 2 and 3 will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 28 Nov 2024 to 30 Nov 2024.
Lanes Closed: There will be three of four lanes closed.
Nearest town: 12.94 miles from Bowling Alley.
ROAD WORKS
Location: The M4 eastbound between junctions J11 (Basingstoke) and J10 (Reading) .
Lane closures: Lanes 1, 2 and 3 will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 14 Nov 2024 to 16 Nov 2024.
Lanes Closed: There will be three of four lanes closed.
Nearest town: 12.86 miles from Bowling Alley.
ROAD WORKS
Location: The M4 eastbound at junction J11 (Basingstoke) .
Lane closures: Lanes 1, 2 and 3 will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 14 Nov 2024 to 16 Nov 2024.
Lanes Closed: All lanes will be closed.
Nearest town: 13.18 miles from Bowling Alley.
ROAD WORKS
Location: The M4 eastbound between junctions J12 (Reading) and J11 (Basingstoke) .
Lane closures: Lanes 1, 2 and 3 will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 14 Nov 2024 to 16 Nov 2024.
Lanes Closed: There will be three of four lanes closed.
Nearest town: 13.94 miles from Bowling Alley.
ROAD WORKS
Location: The M3 eastbound entry slip at junction J7 (Basingstoke) .
Reason: Roadworks are planned.
Status: Pending.
Schedule: From 21:00 on 10 Nov 2024 to 06:00 on 11 Nov 2024.
Lanes Closed: All lanes will be closed.
Nearest town: 12.51 miles from Bowling Alley.
ROAD WORKS
Location: The M3 eastbound between junctions J7 (Basingstoke) and J6 (Basingstoke) .
Lane closures: Lane one will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: From 21:00 on 10 Nov 2024 to 06:00 on 11 Nov 2024.
Lanes Closed: There will be one of three lanes closed.
Nearest town: 12.47 miles from Bowling Alley.
ROAD WORKS
Location: The M4 eastbound entry slip at junction J10 (Reading) .
Reason: Roadworks scheme is planned.
Status: Pending.
Schedule: From 21:00 on 10 Nov 2024 to 05:00 on 12 Nov 2024.
Nearest town: 13.74 miles from Bowling Alley.
ROAD WORKS
Location: The M4 eastbound at junction J10 (Reading) .
Lane closures: Lanes 1, 2 and 3 will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 21:00 and 05:00 from 10 Nov 2024 to 12 Nov 2024.
Lanes Closed: All lanes will be closed.
Nearest town: 13.29 miles from Bowling Alley.

Traffic in Nearby Villages

Bowling Alley


Let's Get Social

Get in touch with us or stay up to date with our latest news and updates.

Follow us on Facebook See Traffic Update on Twitter See our Pinterest Images View our Blog

Live Email Traffic Alerts

Get live email alerts whenever there is a traffic incident or roadworks on the on the roads you travel that may cause congestion or jams.

Sign up for free alerts

LEGAL NOTICE

Please remember that it is against the law to use your mobile phone, tablet or any electronic device without a hands-free kit whilst driving. If you're caught by the police using any device that can send or receive data whilst driving or riding a motorcyle you'll get an automatic fixed penalty notice, 6 points on your licence and a fine of £200. A court could also disqualify you from driving.

Elsewhere on the web:

National Highways TrafficNational Highways England

Official source of traffic updates.

Transport for LondonTransport for London (TFL)

Transport for London's (TfL) portal for transportation in London.

Traffic WalesTraffic Wales

The Welsh government's traffic information service for Wales.

Traffic ScotlandTraffic Scotland

Live traffic conditions and news for Scotland's road network.

Advertise on Traffic UpdateYOUR AD HERE

Advertise to millions of motorists, holidaymakers and commuters.

Location: clockwise entry slip at junction J12 (Basingstoke) .

Due to: Barrier repairs.



Period : from 22:51 on 4 November 2024 to 05:00 on 5 November 2024.

Lanes Closed : All lanes are closed.
Nearest town: 18.1 miles from Bowling Alley.

51.4--0.54

Location: anticlockwise entry slip at junction J12 (Basingstoke) .

Due to: Roadworks.



Period : from 22:34 on 4 November 2024 to 05:00 on 5 November 2024.

Lanes Closed : All lanes are closed.
Nearest town: 18.37 miles from Bowling Alley.

51.4--0.54

Location: eastbound between junctions J11 (Basingstoke) and J10 (Reading) .

Due to: Roadworks.



Period : from 20:46 on 4 November 2024 to 05:00 on 5 November 2024.

Lanes Closed : All lanes are closed.
Nearest town: 12.92 miles from Bowling Alley.

51.41--0.97

From Location: The A3 southbound between the A272 Petersfield South and the junction with the A3M .

To Location: The A3M southbound between junctions J1 and J2 .

Due to: Roadworks.



Period : from 20:20 on 4 November 2024 to 06:00 on 5 November 2024.

Lanes Closed : All lanes are closed.
Nearest town: 16.29 miles from Bowling Alley.

51--0.95

Location: eastbound between junctions J7 (Basingstoke) and J6 (Basingstoke) .

Due to: Roadworks.



Period : from 20:05 on 4 November 2024 to 06:00 on 5 November 2024.

Lanes Closed : All lanes are closed.
Nearest town: 12.15 miles from Bowling Alley.

51.22--1.15

Location: westbound between junctions J4A (Farnborough) and J5 (Hook) .

Lane Closures : Lane three is closed.

Due to: Barrier repairs.



Period : expect disruption until 06:00 on 5 November 2024.

Lanes Closed : There is one of three lanes closed.
Nearest town: 4.04 miles from Bowling Alley.

51.29--0.91

Location: eastbound between junctions J5 (Hook) and J4A (Farnborough) .

Lane Closures : Lane three is closed.

Due to: Barrier repairs.



Period : expect disruption until 06:00 on 5 November 2024.

Lanes Closed : There is one of three lanes closed.
Nearest town: 3.96 miles from Bowling Alley.

51.28--0.92

Location: westbound between junctions J3 (Woking) and J4 (Guildford) .

Lane Closures : Lanes 1 and 2 are closed.

Due to: Roadworks.



Period : expect disruption until 06:00 on 5 November 2024.

Lanes Closed : There are two of four lanes closed.
Nearest town: 11.37 miles from Bowling Alley.

51.35--0.69

Location: westbound at junction J3 (Woking) .

Lane Closures : Lanes 1 and 2 are closed.

Due to: Roadworks.



Period : expect disruption until 06:00 on 5 November 2024.

Lanes Closed : There are two of three lanes closed.
Nearest town: 11.84 miles from Bowling Alley.

51.36--0.68

Location: westbound between junctions J3 (Woking) and J4 (Guildford) .

Due to: Roadworks scheme.



Period : from 23:59 on 4 November 2024 to 06:00 on 5 November 2024.
Nearest town: 11.84 miles from Bowling Alley.

51.36--0.68

Location: clockwise between junctions J10 (Guildford) and J11 (Chertsey) .

Lane Closures : Lanes 1, 2 and 3 will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 5 November 2024 to 05:30 on 6 November 2024.

Lanes Closed : There will be three of four lanes closed.
Nearest town: 18.73 miles from Bowling Alley.

51.32--0.46

Location: clockwise at junction J10 (Guildford) .

Lane Closures : Lanes 1, 2 and 3 will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 5 November 2024 to 05:30 on 6 November 2024.

Lanes Closed : All lanes will be closed.
Nearest town: 19.29 miles from Bowling Alley.

51.32--0.44

Location: anticlockwise between junctions J11 (Chertsey) and J10 (Guildford) .

Lane Closures : Lanes 1, 2 and 3 will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 5 November 2024 to 05:30 on 6 November 2024.

Lanes Closed : There will be three of four lanes closed.
Nearest town: 18.07 miles from Bowling Alley.

51.33--0.48

Location: southbound at the junction with the M25 .

Lane Closures : Lane two will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 22:00 and 05:30 from 5 November 2024 to 8 November 2024.

Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.27 miles from Bowling Alley.

51.32--0.45

Location: southbound.

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 21:00 on 5 November 2024 to 06:00 on 6 November 2024.

Lanes Closed : All lanes will be closed.
Nearest town: 10.32 miles from Bowling Alley.

51.22--0.63

Location: westbound between junctions J10 (Reading) and J11 (Basingstoke) .

Due to: Roadworks scheme is planned.

Status : Pending.

Schedule : From 21:00 on 5 November 2024 to 06:00 on 7 November 2024.
Nearest town: 13.92 miles from Bowling Alley.

51.44--0.85

Location: southbound between the A320 and the junction with the A283 .

Lane Closures : Lane one will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 20:00 on 5 November 2024 to 06:00 on 6 November 2024.

Lanes Closed : There will be one of two lanes closed.
Nearest town: 11.38 miles from Bowling Alley.

51.23--0.61

Location: westbound between junctions J1 (Sunbury) and J2 (Gatwick M23) .

Lane Closures : The hard shoulder and lane 1 are closed.

Due to: Emergency barrier repairs.



Period : expect disruption until 05:30 on 5 November 2024.

Lanes Closed : There is one of three lanes closed.
Nearest town: 19.21 miles from Bowling Alley.

51.4--0.51

Location: eastbound entry slip at junction J8 (Andover) .

Lane Closures : Lane one is closed.

Due to: Roadworks.



Period : expect disruption until 06:00 on 5 November 2024.

Lanes Closed : There is one of two lanes closed.
Nearest town: 14.27 miles from Bowling Alley.

51.2--1.2

Location: anticlockwise entry slip at junction J12 (Basingstoke) .

Due to: Emergency barrier repairs.



Period : expect disruption until 05:30 on 5 November 2024.

Lanes Closed : All lanes are closed.
Nearest town: 18.45 miles from Bowling Alley.

51.4--0.53

Location: westbound at junction J2 (Gatwick M23) .

Lane Closures : The hard shoulder and lane 1 are closed.

Due to: Emergency barrier repairs.



Period : expect disruption until 05:30 on 5 November 2024.

Lanes Closed : There is one of two lanes closed.
Nearest town: 18.64 miles from Bowling Alley.

51.4--0.53

Location: eastbound between junctions J3 (Woking) and J2 (Gatwick M23) .

Lane Closures : Lanes 1 and 2 are closed.

Due to: Emergency barrier repairs.



Period : expect disruption until 05:30 on 5 November 2024.

Lanes Closed : There are two of four lanes closed.
Nearest town: 17.38 miles from Bowling Alley.

51.39--0.56

Location: anticlockwise at junction J12 (Basingstoke) .

Lane Closures : The hard shoulder and lane 1 are closed.

Due to: Emergency barrier repairs.



Period : expect disruption until 05:30 on 5 November 2024.

Lanes Closed : There is one of three lanes closed.
Nearest town: 18.36 miles from Bowling Alley.

51.4--0.54

Location: eastbound exit slip at junction J2 (Gatwick M23) .

Due to: Barrier repairs.



Period : expect disruption until 05:00 on 5 November 2024.

Lanes Closed : All lanes are closed.
Nearest town: 18.05 miles from Bowling Alley.

51.4--0.55

Location: anticlockwise entry slip at junction J12 (Basingstoke) .

Due to: Barrier repairs.



Period : expect disruption until 05:00 on 5 November 2024.

Lanes Closed : All lanes are closed.
Nearest town: 18.23 miles from Bowling Alley.

51.4--0.54

Location: clockwise entry slip at junction J12 (Basingstoke) .

Due to: Barrier repairs.



Period : expect disruption until 05:00 on 5 November 2024.

Lanes Closed : All lanes are closed.
Nearest town: 17.96 miles from Bowling Alley.

51.4--0.55

Location: eastbound at junction J2 (Gatwick M23) .

Due to: Emergency barrier repairs.



Period : expect disruption until 05:30 on 5 November 2024.

Lanes Closed : All lanes are closed.
Nearest town: 17.96 miles from Bowling Alley.

51.4--0.55

Location: northbound between the junctions with the A247 and the M25 .

Lane Closures : Lanes 2 and 3 are closed.

Due to: Roadworks.



Period : expect disruption until 05:30 on 5 November 2024.

Lanes Closed : There are two of three lanes closed.
Nearest town: 18.01 miles from Bowling Alley.

51.31--0.47

Location: westbound between junctions J3 (Woking) and J4 (Guildford) .

Due to: Roadworks scheme.



Period : from 21:04 on 4 November 2024 to 06:00 on 5 July 2025.
Nearest town: 11.58 miles from Bowling Alley.

51.35--0.68

Location: westbound between junctions J3 (Woking) and J4 (Guildford) .

Lane Closures : Lane one is closed.

Due to: Roadworks.



Period : expect disruption until 06:00 on 5 July 2025.

Lanes Closed : There is one of four lanes closed.
Nearest town: 11.37 miles from Bowling Alley.

51.35--0.69

Location: westbound at junction J3 (Woking) .

Lane Closures : Lane one is closed.

Due to: Roadworks.



Period : expect disruption until 06:00 on 5 July 2025.

Lanes Closed : There is one of three lanes closed.
Nearest town: 11.58 miles from Bowling Alley.

51.35--0.68

Location: westbound between junctions J2 (Gatwick M23) and J3 (Woking) .

Lane Closures : Lanes 1 and 2 are closed.

Due to: Roadworks.



Period : expect disruption until 06:00 on 5 November 2024.

Lanes Closed : There are two of four lanes closed.
Nearest town: 16.31 miles from Bowling Alley.

51.39--0.58

Location: The A308M eastbound between the junctions with the M4 and the A308 .

Lane Closures : Lane one is closed.

Due to: Horticultural works.



Period : expect disruption until 06:00 on 5 November 2024.

Lanes Closed : There is one of two lanes closed.
Nearest town: 19.38 miles from Bowling Alley.

51.5--0.72

Location: westbound between junctions J10 (Reading) and J12 (Reading) .

Due to: Roadworks scheme.



Period : from 20:02 on 25 October 2024 to 06:00 on 26 November 2024.
Nearest town: 12.98 miles from Bowling Alley.

51.42--0.92

Location: eastbound between junctions J8 (Andover) and J6 (Basingstoke) .

Due to: Roadworks scheme.



Period : from 20:00 on 4 November 2024 to 06:00 on 9 November 2024.
Nearest town: 12.51 miles from Bowling Alley.

51.22--1.16

Location: eastbound between junctions J12 (Reading) and J10 (Reading) .

Due to: Roadworks scheme.



Period : from 14:12 on 10 September 2024 to 06:00 on 31 March 2025.
Nearest town: 16.34 miles from Bowling Alley.

51.44--1.06

Location: eastbound at junction J10 (Reading) .

Lane Closures : Lane one is closed.

Due to: Roadworks.



Period : expect disruption until 06:00 on 31 March 2025.

Lanes Closed : There is one of three lanes closed.
Nearest town: 13.29 miles from Bowling Alley.

51.43--0.86

Location: eastbound at junction J12 (Reading) .

Lane Closures : Lane one is closed.

Due to: Roadworks.



Period : expect disruption until 06:00 on 31 March 2025.

Lanes Closed : There is one of three lanes closed.
Nearest town: 16.34 miles from Bowling Alley.

51.44--1.06

Location: westbound at junction J12 (Reading) .

Lane Closures : Lane one is closed.

Due to: Roadworks.



Period : expect disruption until 06:00 on 31 March 2025.

Lanes Closed : There is one of three lanes closed.
Nearest town: 16.19 miles from Bowling Alley.

51.44--1.06

Location: westbound between junctions J11 (Basingstoke) and J12 (Reading) .

Lane Closures : Lane one is closed.

Due to: Roadworks.



Period : expect disruption until 06:00 on 31 March 2025.

Lanes Closed : There is one of four lanes closed.
Nearest town: 13.34 miles from Bowling Alley.

51.41--0.98

Location: westbound between junctions J10 (Reading) and J11 (Basingstoke) .

Lane Closures : Lane one is closed.

Due to: Roadworks.



Period : expect disruption until 06:00 on 31 March 2025.

Lanes Closed : There is one of four lanes closed.
Nearest town: 13.23 miles from Bowling Alley.

51.43--0.86

Location: eastbound between junctions J11 (Basingstoke) and J10 (Reading) .

Lane Closures : Lane one is closed.

Due to: Roadworks.



Period : expect disruption until 06:00 on 31 March 2025.

Lanes Closed : There is one of four lanes closed.
Nearest town: 12.86 miles from Bowling Alley.

51.41--0.96

Location: eastbound at junction J11 (Basingstoke) .

Lane Closures : Lane one is closed.

Due to: Roadworks.



Period : expect disruption until 06:00 on 31 March 2025.

Lanes Closed : There is one of three lanes closed.
Nearest town: 13.18 miles from Bowling Alley.

51.41--0.98

Location: westbound at junction J11 (Basingstoke) .

Lane Closures : Lane one is closed.

Due to: Roadworks.



Period : expect disruption until 06:00 on 31 March 2025.

Lanes Closed : There is one of three lanes closed.
Nearest town: 12.91 miles from Bowling Alley.

51.41--0.97

Location: eastbound between junctions J12 (Reading) and J11 (Basingstoke) .

Lane Closures : Lane one is closed.

Due to: Roadworks.



Period : expect disruption until 06:00 on 31 March 2025.

Lanes Closed : There is one of four lanes closed.
Nearest town: 16.05 miles from Bowling Alley.

51.44--1.06

Location: westbound between junctions J11 (Basingstoke) and J12 (Reading) .

Due to: Roadworks scheme.



Period : from 21:00 on 31 October 2024 to 06:00 on 23 November 2024.
Nearest town: 16.21 miles from Bowling Alley.

51.44--1.06

Location: eastbound between junctions J12 (Reading) and J10 (Reading) .

Due to: Roadworks scheme is planned.

Status : Pending.

Schedule : From 20:00 on 5 November 2024 to 06:00 on 11 December 2024.
Nearest town: 14.12 miles from Bowling Alley.

51.42--1.01

Location: westbound at junction J12 (Reading) .

Lane Closures : The hard shoulder is closed.

Due to: Roadworks.



Period : expect disruption until 06:00 on 6 March 2025.
Nearest town: 16.21 miles from Bowling Alley.

51.44--1.06

Location: westbound between junctions J10 (Reading) and J12 (Reading) .

Due to: Roadworks scheme.



Period : from 23:01 on 15 May 2024 to 06:00 on 31 March 2025.
Nearest town: 13.39 miles from Bowling Alley.

51.43--0.86

Location: westbound between junctions J2 (Gatwick M23) and J3 (Woking) .

Lane Closures : Lane one is closed.

Due to: Road repairs.



Period : expect disruption until 06:00 on 31 January 2025.

Lanes Closed : There is one of four lanes closed.
Nearest town: 17.68 miles from Bowling Alley.

51.4--0.55

Location: westbound between junctions J2 (Gatwick M23) and J4A (Farnborough) .

Due to: Roadworks scheme.



Period : from 23:00 on 29 April 2024 to 23:59 on 31 March 2025.
Nearest town: 16.35 miles from Bowling Alley.

51.39--0.58

Location: westbound at junction J4 (Guildford) .

Lane Closures : Lane one is closed.

Due to: Roadworks.



Period : expect disruption until 23:59 on 31 March 2025.

Lanes Closed : There is one of three lanes closed.
Nearest town: 7.54 miles from Bowling Alley.

51.32--0.76

Location: westbound between junctions J3 (Woking) and J4 (Guildford) .

Lane Closures : Lane one is closed.

Due to: Roadworks.



Period : expect disruption until 23:59 on 31 March 2025.

Lanes Closed : There is one of four lanes closed.
Nearest town: 11.37 miles from Bowling Alley.

51.35--0.69

Location: westbound at junction J3 (Woking) .

Lane Closures : Lane one is closed.

Due to: Roadworks.



Period : expect disruption until 23:59 on 31 March 2025.

Lanes Closed : There is one of three lanes closed.
Nearest town: 12.07 miles from Bowling Alley.

51.36--0.67

Location: westbound between junctions J4 (Guildford) and J4A (Farnborough) .

Lane Closures : Lane one is closed.

Due to: Roadworks.



Period : expect disruption until 23:59 on 31 March 2025.

Lanes Closed : There is one of four lanes closed.
Nearest town: 7.15 miles from Bowling Alley.

51.31--0.76

Location: westbound between junctions J2 (Gatwick M23) and J3 (Woking) .

Lane Closures : Lane one is closed.

Due to: Roadworks.



Period : expect disruption until 23:59 on 31 March 2025.

Lanes Closed : There is one of four lanes closed.
Nearest town: 16.35 miles from Bowling Alley.

51.39--0.58

Location: clockwise between junctions J10 (Guildford) and J11 (Chertsey) .

Due to: Roadworks scheme.



Period : from 23:59 on 31 December 2023 to 23:59 on 31 May 2025.
Nearest town: 19.29 miles from Bowling Alley.

51.32--0.44

Location: clockwise between junctions J10 (Guildford) and J11 (Chertsey) .

Lane Closures : The hard shoulder is closed.

Due to: Roadworks.



Period : expect disruption until 23:59 on 31 May 2025.
Nearest town: 18.73 miles from Bowling Alley.

51.32--0.46

Location: anticlockwise between junctions J10 (Guildford) and J9 (Leatherhead) .

Due to: Roadworks scheme.



Period : from 00:02 on 1 January 2024 to 23:59 on 31 May 2025.
Nearest town: 18.91 miles from Bowling Alley.

51.32--0.46

Location: anticlockwise between junctions J10 (Guildford) and J9 (Leatherhead) .

Lane Closures : The hard shoulder is closed.

Due to: Roadworks.



Period : expect disruption until 23:59 on 31 May 2025.
Nearest town: 19.45 miles from Bowling Alley.

51.32--0.44

Location: clockwise at junction J10 (Guildford) .

Lane Closures : The hard shoulder is closed.

Due to: Roadworks.



Period : expect disruption until 23:59 on 31 May 2025.
Nearest town: 19.29 miles from Bowling Alley.

51.32--0.44

Location: anticlockwise at junction J10 (Guildford) .

Lane Closures : The hard shoulder is closed.

Due to: Roadworks.



Period : expect disruption until 23:59 on 31 May 2025.
Nearest town: 18.91 miles from Bowling Alley.

51.32--0.46

Location: westbound between junctions J7 (Basingstoke) and J9 (Winchester) .

Lane Closures : The hard shoulder is closed.

Due to: Roadworks.



Period : expect disruption until 06:00 on 8 February 2025.
Nearest town: 13.01 miles from Bowling Alley.

51.21--1.17

Location: eastbound between junctions J9 (Winchester) and J7 (Basingstoke) .

Lane Closures : The hard shoulder is closed.

Due to: Roadworks.



Period : expect disruption until 06:00 on 8 February 2025.
Nearest town: 13.31 miles from Bowling Alley.

51.21--1.18

Location: westbound between junctions J8 (Andover) and J9 (Winchester) .

Lane Closures : The hard shoulder is closed.

Due to: Roadworks.



Period : expect disruption until 06:00 on 8 February 2025.
Nearest town: 13.35 miles from Bowling Alley.

51.21--1.18

Location: eastbound between junctions J3 (Woking) and J2 (Gatwick M23) .

Lane Closures : Lane three will be closed.

Due to: Emergency roadside equipment maintenance is planned.

Status : Pending.

Schedule : From 22:00 on 11 November 2024 to 05:00 on 12 November 2024.

Lanes Closed : There will be one of four lanes closed.
Nearest town: 17.07 miles from Bowling Alley.

51.39--0.56

Location: eastbound at junction J2 (Gatwick M23) .

Lane Closures : Lanes 1 and 2 will be closed.

Due to: Emergency roadside equipment maintenance is planned.

Status : Pending.

Schedule : From 22:00 on 11 November 2024 to 05:00 on 12 November 2024.

Lanes Closed : All lanes will be closed.
Nearest town: 18.12 miles from Bowling Alley.

51.4--0.54

Location: westbound entry slip at junction J5 (Hook) .

Lane Closures : Lanes 1 and 2 will be closed.

Due to: Road repairs are planned.

Status : Pending.

Schedule : From 21:00 on 11 November 2024 to 06:00 on 12 November 2024.

Lanes Closed : All lanes will be closed.
Nearest town: 4.64 miles from Bowling Alley.

51.27--0.96

Location: westbound at junction J5 (Hook) .

Due to: Road repairs are planned.

Status : Pending.

Schedule : From 21:00 on 11 November 2024 to 06:00 on 12 November 2024.
Nearest town: 4.64 miles from Bowling Alley.

51.27--0.96

Location: southbound.

Due to: Roadside drains works are planned.

Status : Pending.

Schedule : From 21:00 on 11 November 2024 to 06:00 on 12 November 2024.

Lanes Closed : All lanes will be closed.
Nearest town: 9.52 miles from Bowling Alley.

51.15--0.7

Location: westbound at junction J11 (Basingstoke) .

Due to: Roadworks scheme is planned.

Status : Pending.

Schedule : From 21:00 on 11 November 2024 to 06:00 on 12 November 2024.
Nearest town: 12.91 miles from Bowling Alley.

51.41--0.97

Location: westbound at junction J11 (Basingstoke) .

Lane Closures : Lane one will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 21:00 on 11 November 2024 to 06:00 on 12 November 2024.

Lanes Closed : There will be one of three lanes closed.
Nearest town: 12.91 miles from Bowling Alley.

51.41--0.97

Location: westbound exit slip at junction J11 (Basingstoke) .

Lane Closures : Lane one will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 21:00 on 11 November 2024 to 06:00 on 12 November 2024.

Lanes Closed : There will be one of two lanes closed.
Nearest town: 12.91 miles from Bowling Alley.

51.41--0.97

Location: northbound.

Due to: Roadworks scheme is planned.

Status : Pending.

Schedule : From 21:00 on 11 November 2024 to 06:00 on 13 November 2024.
Nearest town: 10.62 miles from Bowling Alley.

51.23--0.62

Location: northbound.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 21:00 and 06:00 from 11 November 2024 to 13 November 2024.

Lanes Closed : All lanes will be closed.
Nearest town: 11.62 miles from Bowling Alley.

51.24--0.6

Location: southbound between the junctions with the A320 and the A31 .

Lane Closures : Lane two will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 11 November 2024 to 13 November 2024.

Lanes Closed : There will be one of two lanes closed.
Nearest town: 11.66 miles from Bowling Alley.

51.24--0.6

Location: northbound entry slip from the A31 .

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 21:00 and 06:00 from 11 November 2024 to 13 November 2024.

Lanes Closed : All lanes will be closed.
Nearest town: 10.62 miles from Bowling Alley.

51.23--0.62

Location: northbound between the A283 and the junction with the A320 .

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 21:00 and 06:00 from 11 November 2024 to 13 November 2024.

Lanes Closed : All lanes will be closed.
Nearest town: 9.78 miles from Bowling Alley.

51.22--0.65

Location: northbound.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 21:00 and 06:00 from 11 November 2024 to 13 November 2024.

Lanes Closed : All lanes will be closed.
Nearest town: 9.82 miles from Bowling Alley.

51.22--0.64

Location: eastbound entry slip at junction J8 (Andover) .

Lane Closures : Lane one will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 20:00 on 12 November 2024 to 06:00 on 13 November 2024.

Lanes Closed : There will be one of two lanes closed.
Nearest town: 14.99 miles from Bowling Alley.

51.2--1.21

Location: eastbound entry slip at junction J7 (Basingstoke) .

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 21:00 on 11 November 2024 to 06:00 on 12 November 2024.

Lanes Closed : All lanes will be closed.
Nearest town: 12.51 miles from Bowling Alley.

51.22--1.16

Location: eastbound between junctions J7 (Basingstoke) and J6 (Basingstoke) .

Lane Closures : Lanes 2 and 3 will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 20:00 on 14 November 2024 to 06:00 on 15 November 2024.

Lanes Closed : There will be two of three lanes closed.
Nearest town: 12.68 miles from Bowling Alley.

51.22--1.16

Location: eastbound between junctions J7 (Basingstoke) and J6 (Basingstoke) .

Lane Closures : Lanes 1 and 2 will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 20:00 on 11 November 2024 to 06:00 on 12 November 2024.

Lanes Closed : There will be two of three lanes closed.
Nearest town: 12.68 miles from Bowling Alley.

51.22--1.16

Location: eastbound exit slip at junction J7 (Basingstoke) .

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 21:00 on 12 November 2024 to 06:00 on 13 November 2024.

Lanes Closed : All lanes will be closed.
Nearest town: 12.77 miles from Bowling Alley.

51.22--1.16

Location: eastbound between the junctions with the A34 and the M3 .

Lane Closures : Lane one will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 20:00 on 12 November 2024 to 06:00 on 13 November 2024.

Lanes Closed : There will be one of two lanes closed.
Nearest town: 15.26 miles from Bowling Alley.

51.2--1.22

Location: eastbound entry slip at junction J10 (Reading) .

Lane Closures : Lane one will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 11 November 2024 to 16 November 2024.

Lanes Closed : There will be one of two lanes closed.
Nearest town: 13.74 miles from Bowling Alley.

51.43--0.86

Location: eastbound between junctions J12 (Reading) and J11 (Basingstoke) .

Lane Closures : Lanes 1, 2 and 3 will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 5 November 2024 to 9 November 2024.

Lanes Closed : There will be three of four lanes closed.
Nearest town: 15.7 miles from Bowling Alley.

51.43--1.05

Location: eastbound at junction J11 (Basingstoke) .

Lane Closures : Lanes 1, 2 and 3 will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 5 December 2024 to 7 December 2024.

Schedule : From 20:00 on 9 December 2024 to 06:00 on 10 December 2024.

Lanes Closed : All lanes will be closed.
Nearest town: 13.18 miles from Bowling Alley.

51.41--0.98

Location: eastbound between junctions J12 (Reading) and J11 (Basingstoke) .

Lane Closures : Lanes 1, 2 and 3 will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 5 December 2024 to 7 December 2024.

Schedule : From 20:00 on 9 December 2024 to 06:00 on 10 December 2024.

Lanes Closed : There will be three of four lanes closed.
Nearest town: 14.12 miles from Bowling Alley.

51.42--1.01

Location: eastbound between junctions J11 (Basingstoke) and J10 (Reading) .

Lane Closures : Lanes 1, 2 and 3 will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 20:00 on 21 November 2024 to 06:00 on 22 November 2024.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 9 December 2024 to 11 December 2024.

Lanes Closed : There will be three of four lanes closed.
Nearest town: 13.01 miles from Bowling Alley.

51.42--0.94

Location: eastbound between junctions J11 (Basingstoke) and J10 (Reading) .

Lane Closures : Lanes 1, 2 and 3 will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 28 November 2024 to 30 November 2024.

Lanes Closed : There will be three of four lanes closed.
Nearest town: 12.94 miles from Bowling Alley.

51.42--0.91

Location: eastbound between junctions J11 (Basingstoke) and J10 (Reading) .

Lane Closures : Lanes 1, 2 and 3 will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 14 November 2024 to 16 November 2024.

Lanes Closed : There will be three of four lanes closed.
Nearest town: 12.86 miles from Bowling Alley.

51.41--0.96

Location: eastbound at junction J11 (Basingstoke) .

Lane Closures : Lanes 1, 2 and 3 will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 14 November 2024 to 16 November 2024.

Lanes Closed : All lanes will be closed.
Nearest town: 13.18 miles from Bowling Alley.

51.41--0.98

Location: eastbound between junctions J12 (Reading) and J11 (Basingstoke) .

Lane Closures : Lanes 1, 2 and 3 will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 14 November 2024 to 16 November 2024.

Lanes Closed : There will be three of four lanes closed.
Nearest town: 13.94 miles from Bowling Alley.

51.42--1

Location: eastbound entry slip at junction J7 (Basingstoke) .

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 21:00 on 10 November 2024 to 06:00 on 11 November 2024.

Lanes Closed : All lanes will be closed.
Nearest town: 12.51 miles from Bowling Alley.

51.22--1.16

Location: eastbound between junctions J7 (Basingstoke) and J6 (Basingstoke) .

Lane Closures : Lane one will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 21:00 on 10 November 2024 to 06:00 on 11 November 2024.

Lanes Closed : There will be one of three lanes closed.
Nearest town: 12.47 miles from Bowling Alley.

51.22--1.16

Location: eastbound entry slip at junction J10 (Reading) .

Due to: Roadworks scheme is planned.

Status : Pending.

Schedule : From 21:00 on 10 November 2024 to 05:00 on 12 November 2024.
Nearest town: 13.74 miles from Bowling Alley.

51.43--0.86

Location: eastbound at junction J10 (Reading) .

Lane Closures : Lanes 1, 2 and 3 will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 21:00 and 05:00 from 10 November 2024 to 12 November 2024.

Lanes Closed : All lanes will be closed.
Nearest town: 13.29 miles from Bowling Alley.

51.43--0.86

Location: eastbound entry slip at junction J10 (Reading) .

Lane Closures : Lane one will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 21:00 and 05:00 from 10 November 2024 to 12 November 2024.

Lanes Closed : All lanes will be closed.
Nearest town: 13.59 miles from Bowling Alley.

51.43--0.86

Location: eastbound exit slip at junction J8 (High Wycombe) .

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 21:00 and 05:00 from 10 November 2024 to 12 November 2024.

Lanes Closed : All lanes will be closed.
Nearest town: 19.16 miles from Bowling Alley.

51.5--0.73

Location: eastbound between junctions J10 (Reading) and J8 (High Wycombe) .

Lane Closures : Lanes 1 and 2 will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 21:00 and 05:00 from 10 November 2024 to 12 November 2024.

Lanes Closed : All lanes will be closed.
Nearest town: 13.74 miles from Bowling Alley.

51.43--0.86

Location: northbound between the A325 and the junction with the A333 .

Lane Closures : Lane one will be closed.

Due to: Barrier repairs are planned.

Status : Pending.

Schedule : From 21:00 on 8 November 2024 to 06:00 on 9 November 2024.

Lanes Closed : There will be one of two lanes closed.
Nearest town: 10.67 miles from Bowling Alley.

51.1--0.76

Location: northbound.

Due to: Barrier repairs are planned.

Status : Pending.

Schedule : From 21:00 on 8 November 2024 to 06:00 on 9 November 2024.

Lanes Closed : All lanes will be closed.
Nearest town: 10.6 miles from Bowling Alley.

51.1--0.76

Location: southbound exit slip to the A320 .

Due to: Barrier repairs are planned.

Status : Pending.

Schedule : From 21:00 on 8 November 2024 to 06:00 on 9 November 2024.

Lanes Closed : All lanes will be closed.
Nearest town: 13.07 miles from Bowling Alley.

51.25--0.57

Location: westbound between junctions J2 (Gatwick M23) and J3 (Woking) .

Lane Closures : Lanes 1, 2 and 3 will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 7 November 2024 to 9 November 2024.

Schedule : From 20:00 on 11 November 2024 to 06:00 on 12 November 2024.

Lanes Closed : There will be three of four lanes closed.
Nearest town: 15.32 miles from Bowling Alley.

51.38--0.6

Location: southbound between the A320 and the junction with the A322 .

Lane Closures : Lane one will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 20:00 on 7 November 2024 to 06:00 on 8 November 2024.

Lanes Closed : There will be one of two lanes closed.
Nearest town: 12.69 miles from Bowling Alley.

51.25--0.58

Location: southbound between the A333 and the junction with the A325 .

Lane Closures : Lane two will be closed.

Due to: Roadside drains works are planned.

Status : Pending.

Schedule : From 20:00 on 7 November 2024 to 06:00 on 8 November 2024.

Lanes Closed : There will be one of two lanes closed.
Nearest town: 10.61 miles from Bowling Alley.

51.1--0.76

Location: westbound between junctions J2 (Gatwick M23) and J3 (Woking) .

Lane Closures : Lanes 1 and 2 will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 7 November 2024 to 9 November 2024.

Lanes Closed : There will be two of four lanes closed.
Nearest town: 16.31 miles from Bowling Alley.

51.39--0.58

Location: westbound at junction J12 (Reading) .

Lane Closures : Lanes 2 and 3 are closed.

Due to: Roadworks.



Period : expect disruption until 06:00 on 5 November 2024.

Lanes Closed : There are two of three lanes closed.
Nearest town: 16.19 miles from Bowling Alley.

51.44--1.06

Location: westbound between junctions J11 (Basingstoke) and J12 (Reading) .

Lane Closures : Lanes 2 and 3 are closed.

Due to: Roadworks.



Period : expect disruption until 06:00 on 5 November 2024.

Lanes Closed : There are two of four lanes closed.
Nearest town: 15.28 miles from Bowling Alley.

51.43--1.04

Location: westbound entry slip at junction J12 (Reading) .

Due to: Roadworks.



Period : expect disruption until 05:00 on 5 November 2024.

Lanes Closed : All lanes are closed.
Nearest town: 16.47 miles from Bowling Alley.

51.44--1.07

Location: eastbound entry slip at junction J12 (Reading) .

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 21:00 and 06:00 from 6 January 2025 to 12 January 2025.

Schedule : Expect disruption everyday between 21:00 and 06:00 from 13 January 2025 to 19 January 2025.

Schedule : Expect disruption everyday between 21:00 and 06:00 from 20 January 2025 to 26 January 2025.

Schedule : Expect disruption everyday between 21:00 and 06:00 from 27 January 2025 to 31 January 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 16.43 miles from Bowling Alley.

51.44--1.06

Location: northbound entry slip from the A283 .

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 21:00 on 6 November 2024 to 06:00 on 7 November 2024.

Lanes Closed : All lanes will be closed.
Nearest town: 10.1 miles from Bowling Alley.

51.18--0.65

Location: westbound entry slip at junction J10 (Reading) .

Lane Closures : Lanes 1 and 2 will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 21:00 and 06:00 from 5 November 2024 to 7 November 2024.

Lanes Closed : All lanes will be closed.
Nearest town: 13.51 miles from Bowling Alley.

51.43--0.85

Location: westbound entry slip at junction J10 (Reading) .

Lane Closures : Lane one will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 21:00 and 06:00 from 5 November 2024 to 7 November 2024.

Lanes Closed : All lanes will be closed.
Nearest town: 13.59 miles from Bowling Alley.

51.43--0.85

Location: westbound exit slip at junction J11 (Basingstoke) .

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 21:00 and 06:00 from 5 November 2024 to 7 November 2024.

Lanes Closed : All lanes will be closed.
Nearest town: 12.91 miles from Bowling Alley.

51.41--0.97

Location: westbound between junctions J10 (Reading) and J11 (Basingstoke) .

Lane Closures : Lanes 1, 2 and 3 will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 21:00 and 06:00 from 5 November 2024 to 7 November 2024.

Lanes Closed : All lanes will be closed.
Nearest town: 13.92 miles from Bowling Alley.

51.44--0.85

Location: eastbound at junction J7 (Basingstoke) .

Due to: Roadworks.



Period : expect disruption until 06:00 on 5 November 2024.

Lanes Closed : All lanes are closed.
Nearest town: 12.77 miles from Bowling Alley.

51.22--1.16

Location: eastbound exit slip at junction J6 (Basingstoke) .

Due to: Roadworks.



Period : expect disruption until 06:00 on 5 November 2024.

Lanes Closed : All lanes are closed.
Nearest town: 8.78 miles from Bowling Alley.

51.26--1.07

Location: eastbound between junctions J7 (Basingstoke) and J6 (Basingstoke) .

Due to: Roadworks.



Period : expect disruption until 06:00 on 5 November 2024.

Lanes Closed : All lanes are closed.
Nearest town: 12.51 miles from Bowling Alley.

51.22--1.16

Location: westbound between junctions J10 (Reading) and J11 (Basingstoke) .

Lane Closures : Lanes 1, 2 and 3 will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 20:00 on 25 November 2024 to 06:00 on 26 November 2024.

Lanes Closed : There will be three of four lanes closed.
Nearest town: 13.14 miles from Bowling Alley.

51.42--0.88

Location: westbound exit slip at junction J12 (Reading) .

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 21:00 and 06:00 from 20 November 2024 to 22 November 2024.

Lanes Closed : All lanes will be closed.
Nearest town: 16.19 miles from Bowling Alley.

51.44--1.06

Location: southbound between the A272 Petersfield South and the junction with the A3M .

Lane Closures : Lane two will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 20:00 on 15 November 2024 to 06:00 on 16 November 2024.

Lanes Closed : There will be one of two lanes closed.
Nearest town: 16.9 miles from Bowling Alley.

51--0.95

Location: clockwise between junctions J10 (Guildford) and J11 (Chertsey) .

Lane Closures : Lanes 2, 3 and 4 will be closed.

Due to: Road repairs are planned.

Status : Pending.

Schedule : Expect disruption everyday between 22:00 and 05:30 from 5 November 2024 to 8 November 2024.

Schedule : From 23:00 on 8 November 2024 to 06:00 on 9 November 2024.

Lanes Closed : There will be three of four lanes closed.
Nearest town: 18.06 miles from Bowling Alley.

51.33--0.48

Location: westbound between junctions J2 (Gatwick M23) and J3 (Woking) .

Due to: Roadworks scheme is planned.

Status : Pending.

Schedule : From 20:00 on 7 November 2024 to 06:00 on 12 November 2024.
Nearest town: 15.32 miles from Bowling Alley.

51.38--0.6

Location: eastbound entry slip at junction J12 (Reading) .

Due to: Roadworks scheme is planned.

Status : Pending.

Schedule : From 21:00 on 6 January 2025 to 06:00 on 15 March 2025.
Nearest town: 16.43 miles from Bowling Alley.

51.44--1.06