Location: eastbound between junctions J9 (Winchester) and J8 (Andover) .
Due to: Roadworks scheme.
Period : from 20:14 on 16 May 2024 to 06:00 on 20 June 2024.
Nearest town: 17.91 miles from Hollywater.
Location: eastbound between the A259 Havant and the junction with the A277 .
Due to: Roadworks scheme.
Period : from 20:35 on 7 May 2024 to 06:00 on 24 May 2024.
Nearest town: 17.92 miles from Hollywater.
Location: eastbound between junctions J9 (Winchester) and J8 (Andover) .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 20 June 2024 to 22 June 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 16.63 miles from Hollywater.
Location: eastbound between junctions J9 (Winchester) and J8 (Andover) .
Due to: Roadworks scheme.
Period : from 22:00 on 14 May 2024 to 06:00 on 22 June 2024.
Nearest town: 16.63 miles from Hollywater.
Location: westbound between junctions J8 (Andover) and J9 (Winchester) .
Due to: Roadworks scheme.
Period : from 22:00 on 14 May 2024 to 06:00 on 22 June 2024.
Nearest town: 15.93 miles from Hollywater.
Location: westbound at junction J4 (Guildford) .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 31 March 2025.
Lanes Closed : There is one of three lanes closed.
Nearest town: 15.66 miles from Hollywater.
Location: westbound between junctions J3 (Woking) and J4 (Guildford) .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 31 March 2025.
Lanes Closed : There is one of four lanes closed.
Nearest town: 19.02 miles from Hollywater.
Location: westbound at junction J3 (Woking) .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 31 March 2025.
Lanes Closed : There is one of three lanes closed.
Nearest town: 19.6 miles from Hollywater.
Location: westbound between junctions J4 (Guildford) and J4A (Farnborough) .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 31 March 2025.
Lanes Closed : There is one of four lanes closed.
Nearest town: 15.37 miles from Hollywater.
Location: westbound between junctions J7 (Basingstoke) and J9 (Winchester) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 8 February 2025.
Nearest town: 15.59 miles from Hollywater.
Location: eastbound between junctions J9 (Winchester) and J7 (Basingstoke) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 8 February 2025.
Nearest town: 15.71 miles from Hollywater.
Location: westbound between junctions J8 (Andover) and J9 (Winchester) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 8 February 2025.
Nearest town: 15.72 miles from Hollywater.
Location: southbound between the A333 and the junction with the A325 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 20 May 2024 to 06:00 on 21 May 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 5.02 miles from Hollywater.
Location: eastbound between the junctions with the A286 and the A259 Chichester East.
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 23 May 2024 to 06:00 on 24 May 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.3 miles from Hollywater.
Location: westbound between the junctions with the A259 Chichester East and the A286 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 23 May 2024 to 06:00 on 24 May 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.33 miles from Hollywater.
Location: westbound between the A3M and the junction with the A2030 .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 23 May 2024 to 06:00 on 24 May 2024.
Nearest town: 18.72 miles from Hollywater.
Location: westbound between the junctions with the A3M and the A2030 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 23 May 2024 to 06:00 on 24 May 2024.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 19.11 miles from Hollywater.
Location: westbound entry slip from the A3M .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 23 May 2024 to 06:00 on 24 May 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 18.92 miles from Hollywater.
Location: The A3M southbound at junction J5 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 23 May 2024 to 06:00 on 24 May 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 18.39 miles from Hollywater.
Location: westbound entry slip from the A3M .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 23 May 2024 to 06:00 on 24 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 18.72 miles from Hollywater.
Location: westbound between the junctions with the A29 South and the A285 Halnaker.
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 20 May 2024 to 05:00 on 21 May 2024.
Schedule : From 20:00 on 23 May 2024 to 05:00 on 24 May 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 18.74 miles from Hollywater.
Location: eastbound between the A285 Halnaker and the junction with the A29 South.
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 20 May 2024 to 05:00 on 21 May 2024.
Schedule : From 20:00 on 23 May 2024 to 05:00 on 24 May 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 17.97 miles from Hollywater.
Location: westbound between the junctions with the A29 South and the A285 Halnaker.
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 20 May 2024 to 05:00 on 21 May 2024.
Schedule : From 20:00 on 23 May 2024 to 05:00 on 24 May 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 18.07 miles from Hollywater.
Location: westbound between the A29 South and the junction with the A285 Tangmere.
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 20 May 2024 to 05:00 on 21 May 2024.
Schedule : From 20:00 on 23 May 2024 to 05:00 on 24 May 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 18.06 miles from Hollywater.
Location: eastbound between the junctions with the A285 Halnaker and the A29 South.
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 20 May 2024 to 05:00 on 21 May 2024.
Schedule : From 20:00 on 23 May 2024 to 05:00 on 24 May 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 18.04 miles from Hollywater.
Location: westbound between junctions J8 (Andover) and J9 (Winchester) .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 22 May 2024 to 06:00 on 23 May 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 17.08 miles from Hollywater.
Location: eastbound between junctions J9 (Winchester) and J8 (Andover) .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 22 May 2024 to 06:00 on 23 May 2024.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 18.36 miles from Hollywater.
Location: eastbound between junctions J9 (Winchester) and J8 (Andover) .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 22 May 2024 to 06:00 on 23 May 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 18.56 miles from Hollywater.
Location: eastbound between junctions J9 (Winchester) and J8 (Andover) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 22 May 2024 to 06:00 on 23 May 2024.
Nearest town: 18.91 miles from Hollywater.
Location: eastbound between junctions J9 (Winchester) and J8 (Andover) .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 22 May 2024 to 06:00 on 23 May 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 17.7 miles from Hollywater.
Location: westbound between the junctions with the A29 South and the A285 Halnaker.
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 21 May 2024 to 23 May 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.13 miles from Hollywater.
Location: westbound between the junctions with the A284 Arundel West and the A29 North.
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 21 May 2024 to 23 May 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.96 miles from Hollywater.
Location: westbound between the junctions with the A29 North and the A29 South.
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 21 May 2024 to 23 May 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.26 miles from Hollywater.
Location: eastbound between the junctions with the A285 Halnaker and the A29 South.
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 21 May 2024 to 23 May 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 18.15 miles from Hollywater.
Location: eastbound between the junctions with the A29 South and the A29 North.
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 21 May 2024 to 23 May 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.12 miles from Hollywater.
Location: eastbound between the junctions with the A29 North and the A284 Arundel West .
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 21 May 2024 to 23 May 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.28 miles from Hollywater.
Location: westbound entry slip at junction J10 (Winchester) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 21 May 2024 to 06:00 on 22 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 19.36 miles from Hollywater.
Location: westbound between junctions J8 (Andover) and J9 (Winchester) .
Lane Closures : Lane two will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 22 May 2024 to 06:00 on 23 May 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 17.02 miles from Hollywater.
Location: eastbound between junctions J9 (Winchester) and J8 (Andover) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 22 May 2024 to 06:00 on 23 May 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 18.13 miles from Hollywater.
Location: eastbound between junctions J9 (Winchester) and J8 (Andover) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 23 May 2024 to 06:00 on 24 May 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 18.36 miles from Hollywater.
Location: eastbound between junctions J9 (Winchester) and J8 (Andover) .
Lane Closures : Lane two will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 23 May 2024 to 06:00 on 24 May 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 18.91 miles from Hollywater.
Location: eastbound between junctions J9 (Winchester) and J8 (Andover) .
Lane Closures : Lane two will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 22 May 2024 to 06:00 on 23 May 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 17.7 miles from Hollywater.
Location: eastbound between junctions J9 (Winchester) and J8 (Andover) .
Lane Closures : Lane two will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 21 May 2024 to 06:00 on 22 May 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 17.06 miles from Hollywater.
Location: westbound between junctions J8 (Andover) and J9 (Winchester) .
Lane Closures : Lane two will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 23 May 2024 to 06:00 on 24 May 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 17.93 miles from Hollywater.
Location: westbound between junctions J8 (Andover) and J9 (Winchester) .
Lane Closures : Lane two will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 21 May 2024 to 06:00 on 22 May 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 16.8 miles from Hollywater.
Location: southbound between the junctions with the A272 Petersfield South and the A3M .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 21 May 2024 to 06:00 on 22 May 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 12.27 miles from Hollywater.
Location: The A3M southbound between junctions J1 and J2 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 21 May 2024 to 06:00 on 22 May 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 13.7 miles from Hollywater.
Location: westbound between the A259 Chichester West and the junction with the A3023 .
Lane Closures : Lane one will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 21 May 2024 to 06:00 on 22 May 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 17.44 miles from Hollywater.
Location: westbound between the junctions with the A3M and the A2030 .
Lane Closures : Lanes 2, 3 and 4 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 22 May 2024 to 06:00 on 23 May 2024.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 19.22 miles from Hollywater.
Location: westbound between the junctions with the A3M and the A2030 .
Lane Closures : Lane four will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 21 May 2024 to 06:00 on 22 May 2024.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 19.23 miles from Hollywater.
Location: westbound exit slip to the A259 .
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 21 May 2024 to 06:00 on 22 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 17.79 miles from Hollywater.
Location: eastbound between the junctions with the A2030 and the A3M .
Lane Closures : Lane three will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 22 May 2024 to 06:00 on 23 May 2024.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 19.82 miles from Hollywater.
Location: westbound between the A3M and the junction with the A2030 .
Lane Closures : Lanes 1, 2, 3 and 4 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 22 May 2024 to 06:00 on 23 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 19.73 miles from Hollywater.
Location: northbound exit slip to the A272 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 21 May 2024 to 06:00 on 22 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 7.74 miles from Hollywater.
Location: northbound between the A3M and the junction with the A272 Petersfield South.
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 21 May 2024 to 06:00 on 22 May 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 7.97 miles from Hollywater.
Location: northbound entry slip from the A272 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 21 May 2024 to 06:00 on 22 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 7.55 miles from Hollywater.
Location: eastbound between junctions J5 (Hook) and J4A (Farnborough) .
Lane Closures : Lane three will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 20:00 on 20 May 2024 to 06:00 on 21 May 2024.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 12.95 miles from Hollywater.
Location: westbound entry slip at junction J9 (Winchester) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 20 May 2024 to 06:00 on 21 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 18.85 miles from Hollywater.
Location: eastbound between junctions J7 (Basingstoke) and J5 (Hook) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 20 May 2024 to 06:00 on 21 May 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 14.25 miles from Hollywater.
Location: westbound between junctions J5 (Hook) and J7 (Basingstoke) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 20 May 2024 to 06:00 on 21 May 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 13.4 miles from Hollywater.
Location: southbound entry slip from the A272 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 20 May 2024 to 06:00 on 21 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 7.55 miles from Hollywater.
Location: southbound between the A272 Petersfield North and the junction with the A272 Petersfield South.
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 20 May 2024 to 06:00 on 21 May 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 6.64 miles from Hollywater.
Location: southbound exit slip to the A272 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 20 May 2024 to 06:00 on 21 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 7.3 miles from Hollywater.
Location: westbound between the junctions with the A259 Chichester West and the A259 Havant.
Lane Closures : Lane one will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 20 May 2024 to 06:00 on 21 May 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 16.76 miles from Hollywater.
Location: eastbound entry slip from the A3M .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 20 May 2024 to 06:00 on 21 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 18.63 miles from Hollywater.
Location: westbound exit slip to the A3M .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 20 May 2024 to 06:00 on 21 May 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 18.47 miles from Hollywater.
Location: northbound between the junctions with the A272 Petersfield North and the A325 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 28 May 2024 to 30 May 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 3.28 miles from Hollywater.
Location: northbound between the junctions with the A272 Petersfield North and the A325 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 28 May 2024 to 30 May 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 3.77 miles from Hollywater.
Location: southbound between the junctions with the A325 and the A272 Petersfield North.
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 28 May 2024 to 30 May 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 2.86 miles from Hollywater.
Location: southbound between the junctions with the A325 and the A272 Petersfield North.
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 28 May 2024 to 30 May 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 3.33 miles from Hollywater.
Location: eastbound between junctions J9 (Winchester) and J8 (Andover) .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 28 May 2024 to 1 June 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 3 June 2024 to 8 June 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 10 June 2024 to 15 June 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 17 June 2024 to 20 June 2024.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 17.91 miles from Hollywater.
Location: eastbound between junctions J9 (Winchester) and J8 (Andover) .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 28 May 2024 to 1 June 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 3 June 2024 to 8 June 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 10 June 2024 to 15 June 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 17 June 2024 to 20 June 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 17.7 miles from Hollywater.
Location: westbound between junctions J8 (Andover) and J9 (Winchester) .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 28 May 2024 to 1 June 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 3 June 2024 to 8 June 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 10 June 2024 to 15 June 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 17 June 2024 to 20 June 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 16.85 miles from Hollywater.
Location: westbound between the junctions with the A29 South and the A285 Halnaker.
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 17 July 2024 to 20 July 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 22 July 2024 to 27 July 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 July 2024 to 3 August 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 5 August 2024 to 8 August 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 18.25 miles from Hollywater.
Location: westbound between the A29 South and the junction with the A285 Tangmere.
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 17 July 2024 to 06:00 on 30 August 2024.
Nearest town: 18.25 miles from Hollywater.
Location: westbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 17 July 2024 to 20 July 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 22 July 2024 to 27 July 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 July 2024 to 3 August 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 5 August 2024 to 8 August 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 18.03 miles from Hollywater.
Location: westbound between the A29 South and the junction with the A285 Tangmere.
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 17 July 2024 to 20 July 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 22 July 2024 to 27 July 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 July 2024 to 3 August 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 5 August 2024 to 8 August 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 18.06 miles from Hollywater.
Location: eastbound between the junctions with the A285 Halnaker and the A29 South.
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 17 July 2024 to 20 July 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 22 July 2024 to 27 July 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 July 2024 to 3 August 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 5 August 2024 to 8 August 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 18.04 miles from Hollywater.
Location: westbound between junctions J8 (Andover) and J9 (Winchester) .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 20 June 2024 to 22 June 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 16.08 miles from Hollywater.
Location: westbound between the junctions with the A29 South and the A285 Halnaker.
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 20 May 2024 to 24 May 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 28 May 2024 to 31 May 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.13 miles from Hollywater.
Location: eastbound between the A285 Halnaker and the junction with the A29 South.
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 20 May 2024 to 24 May 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 28 May 2024 to 31 May 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 17.95 miles from Hollywater.
Location: eastbound between the junctions with the A285 Halnaker and the A29 South.
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 20 May 2024 to 24 May 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 28 May 2024 to 31 May 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 18.05 miles from Hollywater.
Location: eastbound between the junctions with the A259 Havant and the A259 Chichester West.
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 20 May 2024 to 24 May 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 28 May 2024 to 31 May 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 17.72 miles from Hollywater.
Location: westbound between the junctions with the A259 Chichester West and the A259 Havant.
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 20 May 2024 to 24 May 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 28 May 2024 to 31 May 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 17.33 miles from Hollywater.
Location: eastbound between the junctions with the A259 Chichester East and the A285 Chichester.
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 20 May 2024 to 24 May 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 28 May 2024 to 31 May 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.15 miles from Hollywater.
Location: southbound between the A320 and the junction with the A31 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 20 May 2024 to 24 May 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 16.12 miles from Hollywater.
Location: northbound exit slip to the A33 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 21 May 2024 to 24 May 2024.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 28 May 2024 to 1 June 2024.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 3 June 2024 to 8 June 2024.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 10 June 2024 to 15 June 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 19.12 miles from Hollywater.
Location: northbound between the A33 and the junction with the A343 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 26 June 2024 to 29 June 2024.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 1 July 2024 to 6 July 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 19.13 miles from Hollywater.
Location: southbound entry slip from the A33 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 20 May 2024 to 06:00 on 21 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 18.93 miles from Hollywater.
Location: northbound between the M3 and the junction with the A303 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 21 May 2024 to 24 May 2024.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 28 May 2024 to 1 June 2024.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 3 June 2024 to 8 June 2024.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 10 June 2024 to 15 June 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 18.97 miles from Hollywater.
Location: northbound between the M3 and the junction with the A343 .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 21:00 on 21 May 2024 to 06:00 on 6 July 2024.
Nearest town: 18.97 miles from Hollywater.
Location: westbound exit slip to the A2030 .
Lane Closures : Lane one will be closed.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 10 June 2024 to 05:00 on 11 June 2024.
Schedule : From 20:00 on 12 August 2024 to 05:00 on 13 August 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.8 miles from Hollywater.